Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC H NO 928 WARD NO 17 QUILLA COLONY JHAJJAR 124103 | JHAJJAR | JHAJJAR | HARYANA | 124103 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹11.0 L+₹1.0 L (10.2%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | Rejected-Technical | - | Rejected-Technical The Technical bid of Sh. Ajit Singh, Contractor has been rejected due to his technical bid is not fulfilling the condition of eligibility criteria as per approved DNIT. |
Tender Value
₹10.0 L
EMD Value
₹19,980
Closing Date
17 Aug 2022, 3:00 pmClosed
Executive Engineer
Behind PWD Rest House Jawahar Nagar Camp Palwal, Distt. Palwal (Haryana)
Construction of brick masonary tubwell chamber of size 3.00 x 3.66 M. Laying of DI pipe line providing household tap connection with 15 mm i/d GI pipe class B and all other works contingent thereto. SITC of inline versatile DOC system at Chandh
2022_HRY_233712_1
SE PWL No. 13240 dated 02.08.2022
Open Tender
Civil Works
Works
30 days
Palwal
Refer to Tender Documents
4 documents required · 4 mandatory
₹1,000
₹19,980
Yes
1 Sept 2022
10 Aug 2022
17 Aug 2022
10 Aug 2022
17 Aug 2022
10 Aug 2022
Amount
Supplying, installation, Testing & commissioning of in line doc system cylinder mounted/ wall mounted with vaccum regulator, Rota Meter with rate valve ( Chlorine Doze Adjustment low & High), Injector. The dosing of chlorine system of capacity 200 gm to 2 kg per hour. The system shall be manually controlled having a feed range i.e. Chlorine dozing/capability to control within Plus or Minus 4% of the indicated flow rate of liquid chlorine , Insta Yoke injector 242 tailway nozzle ¾ and 2 Nos. filled Chlorine Gas cylinder of capacity 100 kg . The DOC system have vaccum regulator, chlorine doze pipe line various sizes of PVC pipe & CPVC pipe lines (in or out). The pipe line working pressure 6.5 kg to 10 kg per Cm2 ( Maximum) of approved make, high pressure boosting pump/ submersible pump working pressure upto 3.5 kg per Cm2 and above, suitable manual starter ( start & stop) and suitable electrical wire and all other complete fitting required at site. Make Supreme technology Mumbai, Control Matic Germany. Warranty period 6 months for any manufacturing defects only.
Maintenance/Comprehensive maintenance of DOC system (12 months) .The firm/ contractor ensure a dose of chlorination upto 2 PPM at water works (source) so as give minimum residual chlorine 0.1 PPM to 0.2 PPM (consumer end). Sevices replacement of chlorination system and Gas toner if any parts are damaged, corroded of pipe line etc. occur will be done free of cost by the agency.
M/S DURGA TRADERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .