Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Fee/PreQual/Technical/Finance NA | NA | NA | 121004 | -6.29% | ₹7.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.3 L
EMD Value
₹8,500
Closing Date
17 Aug 2026, 3:00 pmClosed
ZONAL_OFFICER_ZONE_14
No_ 6_64_ Puzhuthivakkam Main road Puzhuthivakkam Chennai 600 091
Z.O.XIV.C.NO.E1/03920/2026 Providing RCC Ramp Approach at Veerangal Odai Zero Point In Division-186, Unit-42, Zone-14.
2026_CoC_691957_1
Z.O.XIV.C.NO.E1/03920/2026
Open Tender
Civil Works
Works
60 days
GREATER_CHENNAI_CORPORATION_ZONE_14
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹8,500
18 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Open excavation by Mechanical Means for... the departmental officers. (Excluding Refilling) | 21 | CUM | 199.33 | ₹4,185.93 |
| 2 | Providing and laying, spreading and compacting gra...es etc., complete as per clause 406 of MORTH Rev-5 | 7 | CUM | 2,709.1 | ₹18,963.7 |
| 3 | Providing and laying in position, standardised con...the Department for the excess usage of materials). | 17 | CUM | 8,015.86 | ₹1,36,269.62 |
| 4 | Supplying and erecting centering for plane surface...ng shall be given after the concrete is laid).BEAM | 188 | SQM | 1,178.29 | ₹2,21,518.52 |
| 5 | Providing and laying in position, Standardised Con...the Department for the excess usage of materials). | 20 | CUM | 8,197.92 | ₹1,63,958.4 |
| 6 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level | 2,000 | KGS | 98.7 | ₹1,97,400 |
| 7 | Supplying and filling in foundation, basement,...tion and as directed by the departmental officers. | 162 | CUM | 252.32 | ₹40,875.84 |
| 8 | Supplying and erecting in position LIGHT DUTY STEEL TRUSSES as per the drawing. The materials and design of the trusses should confirm to the relevant Indian Standard specification. The trusses shall be procured only from reputed manufactures of trusses with prior approval of the Buildings Engineer and a certificate to the effect from the reputed manufacturers shall also be furnished with design. The rate quoted shall include the cost of trusses. Base-plate with holding down bolts and nuts to RCC or Masonry works, roof purlins, rafters, purlin sleeves, the members fixing accessories etc., painting one coat of red-oxide paint and erecting in position etc., complete as directed during execution. The contractor shall also arrange to provide grouting for holding down bolts embeding the end purlins, to the gable wall wherever necessary etc., The roof sheeting shall project 0.762m from the eves purlins. For structures like CYCLE STAND, PARKING | 236 | KGS | 205.49 | ₹48,495.64 |
stage.html
html • 0.02 MB
finance_832001.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.22 MB
3920.pdf
Tender Documents • 1.70 MB
BOQ_832001.xls
BOQ • 0.31 MB
cor.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .