| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹16.9 L−₹2.8 L (14.2%)Rejected-Finance | L2 | Rejected-Finance Quoted other than lowest rate |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
28 Feb 2021, 6:00 pmClosed
Shri Sachin H Chavan IDSE
Garrison Engineer (North) Bathinda Mil Stn
REPAIR/REPLACEMENT OF LIGHTENING ARRESTER, EARTHING AND CURRENT ENERGY METER UNDER GE NORTH BATHINDA AT BATHINDA MIL STN
2021_MES_416575_1
8935/NIT-55/20-21
Open Tender
Electrical and Maintenance Works
Item Rate
184 days
GE North Bathinda Mil Stn
Class E
9 documents required · 9 mandatory
₹500
GE(N) Bathinda
₹40,000
Yes
6 Mar 2021
30 Jan 2021
2 Mar 2021
30 Jan 2021
28 Feb 2021
13 Feb 2021
30 Jan 2021 - 5 Feb 2021
Amount
Supplying, fixing, testing, and commissioning AC 240 volt single phase tamper proof electronic whole current energy meter (Polycarbonate body LCD display), accuracy class 1.0, rating range 10 Amp to 60 Amp, with pilfer proof meter box and sealing screw, The meter shall comply with the latest version of IS-13779 with atleast 2 anti tamper LED indication of line load reversal and earth loading indication and shall work satisfactory with guarantee acuracy as per limit of IS-13779. The meter shall be fixed in existing steel box on wall including making cable connection (inlet and outlet with existing cable) and proper sealing with KWH lead sealing tablets & wire including taking down old meter and deposited to AGE E/M-V office with details such as building No., old meter No., New meter No, initial reading, date of installation etc. complete all as specified and as directed by Engineer-in-Charge. Make : Cat part No. SPPB1510000002OC00 of HPL or equivalent model of L & T/ Havelles / ABB Note :- Extra cable if required for connection shall be measured & paid separately under appropriate item of this BOQ as supply only.
Supply and fixing in replacement Air termination, single pointed aluminium rod 12mm dia and 300mm long at roof of building/ESHs at any height including taking down old unserviceable air termination rod any type complete all as specified and as directed by Engineer-in-charge. Note :- PCC block for fixing shall be measured and paid separately under appropriate item of BOQ)
Supply and fixing in replacement test point terminal block made of gun metal or phosphorus bronze size 75x75x25mm drilled and screwed including 3 Nos, 8mm dia 25mm long hex head screw including junction box made out of GI sheet 2mm thick, suitable size appximate 200 x 150 x 60mm, with provision of openable side hung shutter easy to use for test point terminal including taking down old unserviceable test point with box any type, including making good to disturbed surfaces of wall complete all as specified and as directed by Engineer-in-charge.
Supply and fixing in replacement Aluminium strip 25 x 3.15mm with saddles and fixing screws etc. for roof conductors and down conductors (building/ESHs at any height) above ground including taking down old unserviceable aluminium strip any size from roof and wall and making good to disturbed surfaces complete all as specified and as directed by Engineer-in-Charge. Note :- (i) Porcelain, vitreous insulator shall be measured & paid separately under appropriate item of this BOQ
Supply and fixing in replacement Copper strip 20 x 3.15mm with saddles and fixing screws etc. for roof conductors and down conductors (building/ESHs at any height) above ground including taking down old unserviceable strip any type and size from roof and wall and making good to disturbed surfaces complete all as specified and as directed by Engineer-in-Charge. Note :- (i) Porcelain, vitreous insulator shall be measured & paid separately under appropriate item of this BOQ
Supply and fixing porcelain, vitreous insulator of suitable size for aluminium/copper strip down conductor with one metre intervel fixing/secured with and including suitable screws long type and PVC rawl plug/gutties heavy duty at roof and along wall complete all as specified and as directed by Engineer-in-charge.
Material and labour for Earthing complete with copper earth plate electrode of size 60cm x 60cm x 3.15mm buried directly in ground (earth pit not less than 2.25 mtr deep below ground level ) with top edge of the plate not less than 1.5 metre below normal ground level, connected to and including earth continuity copper strip 20x3 mm (upto test point from earth plate, i.e. 7.5m minimum) by means of GI bolts/nuts/washers and including protected by 40mm dia GI light grade protection pipe from earth plate to test point. Earth plate shall be surrounded by packed layer of char coal/coke & salt all around bottom and top with alternative layer. 20mm GI light grade pipe for watering (should be 10cm above GL) and including socket, plug, funnel, wire mesh, CI cover 10mm thick hanged to CFI frame, PCC chamber pit made with PCC (1:3:6) type C1 (using 20 mm graded stone aggregate), including necessary form work, plastering to exposed surface, excavation and earth work in any type of soil , returning filling and disposal of surplus soil to a distance not exceeding 50m, including taking out/dismantling old unserviceable earthing system complete all as specified & shown in electrical plate No. 3 of SSR 2009 (Part-I) complete all as specified and and as directed by Engineer-in-charge, including taking out/dismantling old unserviceable earthing system. Note:- (i) PCC chamber shall be constructed at least 1.5 metre away from the earth electrode and pipe for watering shall be provided in slanting manner. (ii) Test point shall be measured & paid separately under appropriate item of this BOQ. (iii) Earth testing arrangement should be done by the contractor as per direction of Engineer-in-charge and Satisfactorily test report forward to E8 section duly signed by all concerned along with running payment.
Material and labour for Earthing complete with galvanised iron earth plate electrode of size 60cm x 60cm x 6mm buried directly in ground (earth pit not less than 2.25 mtr deep below ground level ) with top edge of the plate not less than 1.5 metre below normal ground level, connected to and including earth continuity GI strip 25x4 mm (upto test point from earth plate, i.e. 7.5m minimum) by means of GI bolts/nuts/washers and including protected by 40mm dia GI light grade protection pipe from earth plate to test point. Earth plate shall be surrounded by packed layer of char coal/coke & salt all around bottom and top with alternative layer. 20mm GI light grade pipe for watering (should be 10cm above GL) and including socket, plug, funnel, wire mesh, CI cover 10mm thick hanged to CFI frame, PCC chamber pit made with PCC (1:3:6) type C1 (using 20 mm graded stone aggregate), including necessary form work, plastering to exposed surface, excavation and earth work in any type of soil , returning filling and disposal of surplus soil to a distance not exceeding 50m, including taking out/dismantling old unserviceable earthing system complete all as specified & shown in electrical plate No. 3 of SSR 2009 (Part-I) complete all as specified and and as directed by Engineer-in-charge, including taking out/dismantling old unserviceable earthing system. Note:- (i) PCC chamber shall be constructed at least 1.5 metre away from the earth electrode and pipe for watering shall be provided in slanting manner. (ii) Test point shall be measured & paid separately under appropriate item of this BOQ. (iii) Earth testing arrangement should be done by the contractor as per direction of Engineer-in-charge and Satisfactorily test report forward to E8 section duly signed by all concerned along with running payment.
Supply only 6 Sqmm single core FRLSH PVC insulated multistrand copper conductor, for service connection complete all as specified and as directed by Engineer-in-charge.
Material and labour for Earthing complete with galvanised iron earth plate electrode of size 60cm x 60cm x 6mm buried directly in ground (earth pit not less than 2.25 mtr deep below ground level ) with top edge of the plate not less than 1.5 metre below normal ground level, connected to and including earth continuity GI wire 4 mm dia (upto test point from earth plate i.e. 7.5m min) by means of GI bolts/nuts/washers and including protected by 15mm dia GI light grade protection pipe from earth plate to test point. Earth plate shall be surrounded by packed layer of char coal/coke & salt all around bottom and top with alternative layer. 20mm GI light grade pipe for watering (should be 10cm above GL) and including socket, plug, funnel, wire mesh, CI cover 10mm thick hanged to CFI frame, PCC chamber pit made with PCC (1:3:6) type C1 (using 20 mm graded stone aggregate), including necessary form work, plastering to exposed surface, excavation and earth work in any type of soil , returning filling and disposal of surplus soil to a distance not exceeding 50m, including taking out/dismantling old unserviceable earthing system complete all as specified & shown in electrical plate No. 3 of SSR 2009 (Part-I) complete all as specified and and as directed by Engineer-in-charge, including taking out/dismantling old unserviceable earthing system. Note:- (i) PCC chamber shall be constructed at least 1.5 metre away from the earth electrode and pipe for watering shall be provided in slanting manner. (ii) Test point shall be measured & paid separately under appropriate item of this BOQ. (iii) Earth testing arrangement should be done by the contractor as per direction of Engineer-in-charge and Satisfactorily test report forward to E8 section duly signed by all concerned along with running payment.
Material and labour for PCC (1:3:6), type C-1 using 20 mm graded stone aggregate as in coping, bed block for embedded the termination rod & similar work etc at roof of building/ESHs at any height including necessary form work including demolition of cement concrete (unreinforced), embedded existing old unserviceable termination rod, any description and in any position and removing rubbish material from building and thrown in low lying empty area (as per direcction of AGE/JE) at any distance upto 500 metres from the site complete all as specified and as directed by Engineer-in-Charge
Note:- The contract sum shall be calculated by deducting the amount shown in Credit Schedule attached to this tender, from total amount of Schedule 'A'/BOQ
NASIB ENGINEERS AND CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .