Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹15.3 L+₹87,570 (6.06%)Rejected-AOC 1 181 KAMATCHI AMMAN KOVIL STREET KANNAN COLONY CHINTHAMANI MADURAI 625009 | MADURAI | MADURAI | TAMIL NADU | 625009 | L2 | Rejected-AOC OTHER THAN LOWEST BIDDER |
Tender Value
Refer Docs
EMD Value
₹26,980
Closing Date
10 Nov 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sh A K Dubey, IDSE , SE CWE
Military Engineer Services, Commander Works Engineer, Udhampur, PO - Garhi, Udhampur-182121
PROVN OF KENNELS AT AFVH UNDER GE (NORTH) UDHAMPUR
2020_MES_375475_2
CWE/U(N)-27/2020-21
Open Tender
Civil Works
Lump-sum
180 days
Udhampur
AS PER TENDER
7 documents required · 7 mandatory
₹500
GE (North) Udhampur
₹26,980
Yes
12 Dec 2020
23 Oct 2020
12 Nov 2020
23 Oct 2020
10 Nov 2020
29 Oct 2020
60 days
Amount
BUILDING WORK (SCHEDULE 'A' PART-I) Lump sum price worked out by the Contractor for “Building Work” as listed in Schedule ‘A’ Part- I.
Internal Water Supply (SCHEDULE 'A' PART-II) Lump sum price worked out by the Contractor for “Internal Water Supply” as listed in Schedule ‘A’ Part- II .
INTERNAL ELECTRIFICATION (SCHEDULE 'A' PART-III) (SEC-I) Lump sum price worked out by the Contractor for “Internal Electrification” as listed in Schedule ‘A’ Part- III (Sec-I)
INTERNAL ELECTRIFICATION (SCHEDULE 'A' PART-III) (SEC-II) SCHEDULE `A' PART-III, Sec-II is not prepriced by MES and prepriced rates indicates 0.0 under column 5 signified this fact only. Bidder shall insert their rates in Green filed under Col-6.
Slim linear LED tubelight fixture 18/20 Watt, housing made of extruded alongwith lumen O/P should not be less than 100 lu/w with wider beam angle > = 120 and poly diffuser. CRI should be more than 70. Isolated driver with surge protection 2.0 KV & PF > =0.9 making all connection using 1.5 sqmm Copper conductor multistranded PVC insulated 2 core flexible cable in white colour from ceiling rose to fitting complete all as specified and as directed. Note : (i) A certificate from the manufactures for warranty minimum upto 2 years shall be obtained and submitted to the AGE/GE
MCB SPN 6 to 40 Amps ( ISI Marked) 50 C/S 10 KA 'C' sereis complete all as specified.
MCB SP 5 to 32 Amps ( ISI Marked) 50 C/S 10 KA 'B' sereis complete all as specified.
Supply & hanging ceiling fan AC single phase 230/240 volts of size 1200 mm sweep , having service value > 4.0 including making connection with and including suitable flexible copper wire, complete all as specified and as directed by Engineer-in-Charge.
Supply and fixing turboforce wall mounted aircirculators fan AC single phase 230/240 volts of size 450 mm sweep complete all as specified and as directed by Engineer-in-Charge.
Exhaust fan AC single phase 230/240 V of size 450mm sweep with louver speed 900-950 RPM power input 50-55 W, Heavy duty, complete all as specified and as directed by Engr-in-Charge.
Supply and fixing Non metallic ventilating fan AC single phase 230/240 volts of size 150 mm sweep with lovers and shutters including provision of flexible 3 core copper conductor cable of 23/0.0076 upto ceiling rose complete making necessary holes on wall for fixing the same all as specified and as directed by Engineer-in-Charge.
Sub Total
PATH (SCHEDULE 'A' PART-IV) Lump sum price worked out by the Contractor for “Path” as listed in Schedule ‘A’ Part- IV .
EXTERNAL WATER SUPPLY (SCHEDULE 'A' PART-V) (SEC-I) Lump sum price worked out by the Contractor for “External water supply” as listed in Schedule ‘A’ Part- V (Sec-I)
EXTERNAL WATER SUPPLY (SCHEDULE 'A' PART-V) (SEC-II) SCHEDULE `A' PART-V, Sec-II is not prepriced by MES and prepriced rates indicates 0.0 under column 5 signified this fact only. Bidder shall insert their rates in Green filed under Col-6.
Cutting and screwing existing steel tubing of 80 mm dia for alterations or additions, or lengthening screw on pipe to form connector, necessary done in position without taking down complete all as specified and as directed by Engr-in-Charge.
S&F GI tee of size 80mmx 80mm x25mm complete all as specified and as directed by Engr-in-Charge.
Sub Total
EXTERNAL ELECTRIFICATION (SCHEDULE 'A' PART-VI) Lump sum price worked out by the Contractor for “External electrification” as listed in Schedule ‘A’ Part- V .
EXTERNAL ELECTRIFICATION (SCHEDULE 'A' PART-VI) (SEC-II) SCHEDULE `A' PART-VI, Sec-II is not prepriced by MES and prepriced rates indicates 0.0 under column 5 signified this fact only. Bidder shall insert their rates in Green filed under Col-6.
Supply and fixing LED Street Light fitting 25/30 Watt, New generation energy saving & environmental friendly long life versatile pressure die-cast aluminium IP66 with acrylic, powder coated, pressure die cast aluminium compact high power LED tube light with heat resistant toughened Glass, Corrosion resistant, isolated driver low heat generating LED including nuts, bolts, washers including making all connection, complete all as per the direction of Engg-in-Charge. Note : (i) A certificate from the manufactures for warranty minimum upto 2 years shall be obtained and submitted to the AGE/GE
40mm bore GI pipe bracket 1.2 mtr long made to require shape for fixing of street light including MS flat iron 40x5 mm clamps 2 Nos, nut nolt, washer etc, complete all as per the direction of Engg-in-Charge. complete all as specified and as directed by Engr-in-Charge.
Cutting of road not exc 45 cm depth and not exc 30 cm width for laying of GI tubing for protection of cable and making good the disturbed surfaces using PCC 1:2:4 type B1, complete all as specified and as directed by Engr-in-Charge.
Sub Total
AREA DRAINAGE (SCHEDULE 'A' PART-VII) Lump sum price worked out by the Contractor for “Area drainage” as listed in Schedule ‘A’ Part- VII .
EARTH WORK AND SITE CLEARANCE (SCHEDULE 'A' PART-VIII) Lump sum price worked out by the Contractor for “Earth work and site clearance” as listed in Schedule ‘A’ Part- VIII .
R K BUILDERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .