Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.2 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.5 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹4.6 LAdmitted-Fee/PreQual/Technical/Finance NO 64 ANNA STREET MINJUR 601 203 | ₹4.6 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P RADHAKRISHNAN CONTRACTOR L4 | SELLAPPA PANNEER SELVAM L3 | AR Constructions L1 | Loganayagi Enterprises L2 |
|---|---|---|---|---|---|---|---|
| 1.001. IMPROVEMENT OF BURIAL GROUND (CREMATION SHED) @ KATTUR PANCHAYAT IN MINJUR PANCHAYAT UNION UNDER PANCHAYAT GENERAL FUND/2025 - 2026/ RD/TVLR/MJR01 | |||||||
| 2.00SHED | |||||||
| 3.00 | Clearing the Light jungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical | 960 | SQ.M | 15 ₹14,400 | 5.9 ₹5,664 Lowest | 6 ₹5,760 | 6 ₹5,760 |
| 4.00 | Earth work excavation for foundation in all soils and sub - soils etc., complete as per SS 20B | 7.23 | CUM | 150 ₹1,084.5 Lowest | 223 ₹1,612.29 | 226 ₹1,633.98 | 227 ₹1,641.21 |
| 5.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 13.19 | CUM | 2,300 ₹30,337 | 1,989 ₹26,234.91 | 1,984 ₹26,168.96 Lowest | 1,995 ₹26,314.05 |
| 6.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 13.77 | CUM | 5,700 ₹78,489 | 6,499 ₹89,491.23 | 5,255 ₹72,361.35 Lowest | 5,286 ₹72,788.22 |
| 7.00RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed.. | |||||||
| 8.00 | Sub Structure | 2.63 | CUM | 8,500 ₹22,355 | 9,129 ₹24,009.27 | 8,457 ₹22,241.91 Lowest | 8,506 ₹22,370.78 |
| 9.00 | Super Structure | 2.78 | CUM | 9,000 ₹25,020 | 9,249 ₹25,712.22 | 8,577 ₹23,844.06 Lowest | 8,627 ₹23,983.06 |
| 10.00Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed | |||||||
Tender Value
₹4.9 L
EMD Value
₹5,000
Closing Date
10 Aug 2026, 3:00 pmClosed
BDO(VP)
MINJUR BDO OFFICE
IMPROVEMENT OF BURIAL GROUND (CREMATION SHED) AT KATTUR PANCHAYAT IN MINJUR
2026_RDTN_688061_1
2039/2022/A7
Open Tender
Civil Works
Item Rate
180 days
MINJUR
CLASS V AND ABOVE
4 documents required · 4 mandatory
₹0
₹5,000
Yes
11 Aug 2026
23 Jul 2026
10 Aug 2026
23 Jul 2026
10 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. IMPROVEMENT OF BURIAL GROUND (CREMATION SHED) @ KATTUR PANCHAYAT IN MINJUR PANCHAYAT UNION UNDER PANCHAYAT GENERAL FUND/2025 - 2026/ RD/TVLR/MJR01 | - | - | - | - |
| 2 | SHED | - | - | - | - |
| 3 | Clearing the Light jungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical | 960 | SQ.M | 6.89 | ₹6,614.4 |
| 4 | Earth work excavation for foundation in all soils and sub - soils etc., complete as per SS 20B | 7.23 | CUM | 263.78 | ₹1,907.13 |
| 5 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 13.19 | CUM | 2,320.09 | ₹30,601.99 |
| 6 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 13.77 | CUM | 6,146.02 | ₹84,630.7 |
| 7 | RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed.. | - | - | - | - |
| 8 | Sub Structure | 2.63 | CUM | 9,890.89 | ₹26,013.04 |
| 9 | Super Structure | 2.78 | CUM | 10,031.96 | ₹27,888.85 |
| 10 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed | - | - | - | - |
stage.html
html • 0.02 MB
finance_827038.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
TenderDocumentMJR01.pdf
Tender Documents • 0.33 MB
BOQ_827038.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].