Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.3 LAccepted-AOC | ₹3.3 L | 1 | Accepted-AOC L1 |
| 2 | 2₹3.4 LRejected-AOC 59 R G S ROAD USHAGRAM DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | ₹3.4 L | 2 | Rejected-AOC L2 |
| 3 | Rejected-Technical KHANDRA BARDHAMAN 713363 WEST BENGAL INDIA | KHANDRA | BARDHAMAN | WEST BENGAL | 713363 | - | - | Rejected-Technical Not As per NIT |
| Sl No | Description | Qty | Unit | ROY ENTERPRISE L2 | NEW ELECTRICAL CONCERN L1 |
|---|---|---|---|---|---|
| 1.00Items Description | |||||
| 2.00Repairing and Rewinding of 500kVA, 3.3kV/550V brush make Air Cooled TSU of Dhemomain Incline Colliery under Sodepur Area. | |||||
| 2.01 | Dismantling of Core winding | 1 | Nos. | 7,500 ₹7,500 | 7,000 ₹7,000 |
| 2.02 | Cost of new electrolyte grade copper wire | 300 | Nos. | 905 ₹2.7 L | 905 ₹2.7 L |
| 2.03 | Cost of re-insulation cost copper strip by double cover nomex paper | 300 | Nos. | 215 ₹64,500 | 200 ₹60,000 |
| 2.04 | Cost of F class insulation materials | 1 | Nos. | 18,500 ₹18,500 | 18,000 ₹18,000 |
| 2.05 | Reformation of secondary coil | 300 | Nos. | 82 ₹24,600 | 80 ₹24,000 |
| 2.06 | Fabrication of wooden. forma | 1 | Nos. | 3,850 ₹3,850 | 3,600 ₹3,600 |
| 2.08 | Cost of F class varnish | 10 | Nos. | 575 ₹5,750 | 550 ₹5,500 |
| 2.09 | Cost of F class thinner | 3 | Nos. | 325 ₹975 | 320 ₹960 |
Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
19 Mar 2026, 9:00 amClosed
Area Engineer(EnM)
Area Engineer(EnM),Sodepur Area
Repairing and Rewinding of 500kVA, 3.3kV/550V brush make Air Cooled TSU of Dhemomain Incline Colliery under Sodepur Area.
2026_ECL_356136_1
ECL/SDPA/AE(EnM)/e/25-26/401 dt.07.03.2026
Open Tender
Miscellaneous Works
10 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,800
21 May 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
19 Mar 2026
10 Mar 2026
10 Mar 2026 - 13 Mar 2026
Items Description
Repairing and Rewinding of 500kVA, 3.3kV/550V brush make Air Cooled TSU of Dhemomain Incline Colliery under Sodepur Area.
Dismantling of Core winding
Cost of new electrolyte grade copper wire
Cost of re-insulation cost copper strip by double cover nomex paper
Cost of F class insulation materials
Reformation of secondary coil
Fabrication of wooden. forma
Cost of F class varnish
Cost of F class thinner
Re-assembly of new coils with interconnection with proper blazing, baking/heating properly
Complete testing charges
Painting of entire transformer
Less Copper scrap
Overhead cost and others
Add. CMPF/EPF @ 12% on Labour charges
Add. Bonus @ 8.33% on Labour charges 8.33%
Add. Pension @ 7% on Labour charges
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.70 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_368988.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid