Loading…
Loading…
| Sl No | Description | Qty | Unit | M Karthik L1 | M MURTHY L2 |
|---|---|---|---|---|---|
| 1.00Name of Work : Providing RCC Stom Water Drain at EVP 50ft Road to Thanthi Kalvoy at Ayyapanthangal Panchayat Estimate Amount : 86.33 Lakhs | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed In hard stiff clay, stiff blackcotton soil, hard red earth, shale murams, gravel stony earth and earth muds with 50%(fifty percent) fair size boulders and hard gravely soils(SS20B) | 968.91 | Cum | 263 ₹2,54,823.33 Lowest | 283 ₹2,74,201.53 |
| 3.00 | Supply & Filling of M sand from Approved quarry including cost & Conveyance of all materials, etc Complete complying with standard specification. | 54.84 | Cum | 1,950 ₹1,06,938 Lowest | 1,970 ₹1,08,034.8 |
| 4.00 | Cement Concrete 1:4:8 (one cement , five sand, and Ten hard broken stone) Using 40 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick.compacting etc., complete | 91.41 | Cum | 5,760 ₹5,26,521.6 Lowest | 5,787 ₹5,28,989.67 |
| 5.00 | Supplying and erecting centering of sides and soffits including supports and strutting for plane surfaces etc. complete complying with standard specification and as directed | 2,373.44 | Sqm | 547 ₹12,98,271.68 Lowest | 567.5 ₹13,46,927.2 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete | 9,946.39 | Kgs | 92 ₹9,15,067.88 Lowest | 112 ₹11,13,995.68 |
| 7.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. | 418.54 | Cum | 9,711 ₹40,64,441.94 Lowest | 9,732 ₹40,73,231.28 |
| 8.00 | Provision for Manhole Cover SFRC | 29 | Each | 2,700 ₹78,300 Lowest | 2,721 ₹78,909 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 13,03,985.6 ₹13,03,985.6 Lowest | 13,54,372.05 ₹13,54,372.05 |
Tender Value
₹86.3 L
Closing Date
15 Sept 2025, 3:00 pmClosed
BDO BP
KNR Union at Padappai
Providing RCC Storm Water Drain at EVP 50ft Road to Thanthi Kalvoy at Ayyapanthangal Panchayat Kundrathur Panchayat Union
2025_RDTN_601867_1
DRDAKPM PACKAGE No.8 - No.186 / 2025 / A9 / KNR / Dated 01.09.2025
Open Tender
Civil Works - Others
Works
150 days
Ayyapanthangal
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
16 Sept 2025
9 Sept 2025
15 Sept 2025
9 Sept 2025
15 Sept 2025
9 Sept 2025
Amount
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed In hard stiff clay, stiff blackcotton soil, hard red earth, shale murams, gravel stony earth and earth muds with 50%(fifty percent) fair size boulders and hard gravely soils(SS20B)
Supply & Filling of M sand from Approved quarry including cost & Conveyance of all materials, etc Complete complying with standard specification.
Cement Concrete 1:4:8 (one cement , five sand, and Ten hard broken stone) Using 40 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick.compacting etc., complete
Supplying and erecting centering of sides and soffits including supports and strutting for plane surfaces etc. complete complying with standard specification and as directed
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc.
Provision for Manhole Cover SFRC
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M MURTHY (BID ID -1458233)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .