Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance NATUNDANGA BANAGRAM BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 LAdmitted-Finance 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹2.7 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | MAZUMDER ELECTRICAL L2 | ENERGY ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00Rewinding and Repairing of 50KVA,550V/440V Lighting Transformer at Agent Office of Manderboni Colliery. (Inclusive of EPF/CMPF) | |||||
| 1.01 | Cost of copper wire with DPC | 75 | Kg | 639 ₹47,925 | 620 ₹46,500 |
| 1.02 | Cost of Insulating Materials (Primary & Secondary) | 1 | Au | 7,210 ₹7,210 | 7,000 ₹7,000 |
| 1.03 | Cost of Corksheet. 4mm | 2 | no | 2,678 ₹5,356 | 2,600 ₹5,200 |
| 1.04 | Cost of Connection stud with insulator | 7 | no | 979 ₹6,853 | 950 ₹6,650 |
| 1.05 | Cost of wooden forma for making coils | 1 | au | 2,009 ₹2,009 | 1,950 ₹1,950 |
| 1.06 | Cost of De-carbonizing core & tank clean | 1 | Au | 1,545 ₹1,545 | 1,500 ₹1,500 |
| 1.07 | Cost of thinner and varnish | 1 | Au | 2,575 ₹2,575 | 2,500 ₹2,500 |
| 1.08 | Cost of cooling tubes welding & grinding | 1 | Au | 4,120 ₹4,120 | 4,000 ₹4,000 |
| 1.09 | Re-winding charge | 1 | Au | 6,180 ₹6,180 | 6,000 ₹6,000 |
Tender Value
₹3.1 L
EMD Value
₹3,900
Closing Date
13 Dec 2025, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Rewinding and Repairing of 50KVA,550V/440V Lighting Transformer, repairing of 30KVA, 3.3KV/440V Lighting Transformer, Rewinding and Repairing of 150HP,1440RPM, 550V Induction Motor Of Manderboni Colliery
2025_ECL_348507_1
GM-PND/EandM/25-26/194/1024 dated 01/12/2025
Open Tender
Electrical and Maintenance Works
30 days
MSAM Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,900
12 Jan 2026
3 Dec 2025
15 Dec 2025
3 Dec 2025
13 Dec 2025
3 Dec 2025
3 Dec 2025 - 6 Dec 2025
Amount
Rewinding and Repairing of 50KVA,550V/440V Lighting Transformer at Agent Office of Manderboni Colliery. (Inclusive of EPF/CMPF)
Cost of copper wire with DPC
Cost of Insulating Materials (Primary & Secondary)
Cost of Corksheet. 4mm
Cost of Connection stud with insulator
Cost of wooden forma for making coils
Cost of De-carbonizing core & tank clean
Cost of thinner and varnish
Cost of cooling tubes welding & grinding
Re-winding charge
Less Scrape value
Profit @ 10%
Transportation
Repairing of 30KVA, 3.3KV/440V Lighting Transformer of MSAM Colliery. (Inclusive of EPF/CMPF)
Cost of Aluminium wire
Class F Insulation materials
Bacolite Chips for Coil fixing & Assembling
varnish
Wooden work for coil
Decarbonizing of core & Tank
Rewinding coil assembling core fitting charge
Corksheet Gasket for Top cover
Rupton rod , Gas & Oxygen for jointing
Insulator ,Brass Stud,Nut & Washer
Dismantaling & Tanking Charge for Coil
Decarbonising & fitaration of Transformer oil
Hardware Material & Painting
Heating & Testing Charge
Aluminium Socket
Overhead Profit 10%
Transportation Charge
Less Scrape value
Rewinding and Repairing of 150HP,1440RPM, 550V Induction Motor . (Inclusive of EPF/CMPF)
Cost of super enamel wire
Cost of insulation
Labour Cost
Cost of striping Motor
Cost of winding motor
MISC cost
Supply & fitting of 6319 No Bearing
Supply & fitting of f N319 No Bearing
Rep of Bearing Housing
Cost of Rep of Rotor Ring
Less Scrape value
Profit @ 10%
Transportation Charge
Total impact of GST for the purpose of CTC
MAZUMDER ELECTRICAL (BID ID -1201851)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_361229.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid