Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC AT PO RAMPUR COLLIERY BRAJRAJNAGAR DIST JHARSUGUDA ODISHA 768225 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768225 | L1 | Accepted-AOC WORK IS AWARDED TO L1 BIDDER | |
| 2 | L2₹11.3 L+₹1.1 L (10.5%)Rejected-Finance AT RAMPUR NEAR HANUMANMANDIR WARD NO 7 PO RAMPUR COLLIERY PS BRAJRAJNAGAR DIST JHARSUGUDA ODISHA 768225 | JHARSUGUDA | JHARSUGUDA | ODISHA | 768225 | L2 | Rejected-Finance REJECTED BEING L2 |
Tender Value
₹15.3 L
EMD Value
₹19,200
Closing Date
12 Apr 2024, 5:00 pmClosed
STAFF OFFICER CIVIL ORIENT AREA MCL
STAFF OFFICER CIVIL ORIENT AREA MCL AT AND PO BRAJARAJNAGAR DIST JHARSUGUDA ODISHA PIN 768216 MOB 9937422452/9438878043/9438494602
Construction of Diversion road from weigh bridge culvert to near settling tank (200.00mtr length WMM Road) back side of Portable Magazine at HBM of RSA, OA.
2024_MCL_305904_1
MCL/GM/OA/SO(C)/e-T/23-24/46 dtd.27.03.2024
Open Tender
Civil Works - Roads
Item Rate
45 days
ORIENT AREA MCL
Please refer Tender documents.
3 documents required · 3 mandatory
₹19,200
18 May 2024
28 Mar 2024
13 Apr 2024
28 Mar 2024
12 Apr 2024
28 Mar 2024
28 Mar 2024 - 1 Apr 2024
Amount
Item Description/ Heading
Clearing and Grubbing Road Land(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 3OO mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable malerial to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 1SO mm in thickness.ln area of light jungle
Embankment construction with material Obtained from Borrow Pits( construction of embankment with approved material having CSR> 7obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading t required slope and compacting to meet requirement of table 300-1,300-2 and as per relevant clauses of section-300)
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Nlaterial with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in suu base / base course on well prepared surface and compacting with vibralory roller to achieve the desired density in accordance lo Table No.400-12, 4OO-13 and as per clquse o, section 406111 speciflcatrons
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing ot joints etc. complete 600 mm dia RCC pipes.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceedin8 30 cm in depth, 1.5 m in wadth as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in'charge.All kinds ofsoil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement:4 coarse sand (zone-lll) derived rrom natural sources :8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:l%:3 (1 Cement: l% coarse sand (zone-lll) derived lrom natural sources :3 graded stone aggregate 20 mm nominalsize derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls. return walls, walls (any thickness) includinB attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
SUBRATA KUMAR DASH
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .