| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.4 LAccepted-AOC C3 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹34.4 L Quoted ₹32.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹34.4 LRejected-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹34.4 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTOR L2 | ANBU ENGINEERING INDIA PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00 | Leading, Lifting, Shifting, Loading, Transporting and Unloading of ESP fields (all related auxiliaries) with supporting frames from Uppur/STPP to MTPS-II / Mettur Dam. | 60 | Tons | 2,690 ₹1.6 L | 2,520 ₹1.5 L |
| 2.00 | Charges for renewal of expansion joint of size 1900X2050 in Hot PA duct including drawal of materials and devolution of scrap at central stores. A) Cutting and removal of eroded expansion joint of size of 1800X3800 This work involves providing platforms inside and outside the ducts, locking and arresting the ducts of HOT PA duct, cutting, dismantling and removal of the eroded expansion joint and devoluting the same to the Central Stores/MTPS- II. | 2 | Nos | 27,000 ₹54,000 | 25,330 ₹50,660 |
| 3.00 | Drawal of new expansion joint of size 1900X2050 from Central Store/MTPS-II , Altering the metallic expansion joint as per the MTPS-II Site condition and transporting to Boiler area lifting, leading and erection in position, alignment with Hot PA duct and welding. Finally cutting and removing all the locking and arresting arrangement, scaffolding and platforms. This work including the transporting charges of materials from Central Store to Boiler. (Including the cost of welding electrodes. | 2 | Nos | 28,200 ₹56,400 | 26,440 ₹52,880 |
| 4.00 | Charges for renewal of expansion joint of size 2200X3800before ESP inlet including drawal of materials and devolution of scrap at central stores. A) Cutting and removal of eroded expansion joint of size of 2200X3800 This work involves providing platforms inside and outside the ducts, locking and arresting the upstream and downstream sides of flue gas ducts, cutting, dismantling and removal of the eroded expansion joint before and after ESP inlet gates and devoluting the same to the Central Stores/MTPS-II. | 11 | Nos | 27,000 ₹3.0 L | 25,330 ₹2.8 L |
| 5.00 | Drawal of new expansion joint of size 2200X3800 from Central Store/MTPS-II , Altering the metallic expansion joint as per the MTPS-II Site condition and transporting to Boiler area lifting, leading and erection in position, alignment with flue gas duct and welding. Finally cutting and removing all the locking and arresting arrangement, scaffolding and platforms. This work including the transporting charges of materials from Central Store to Boiler. (Including the cost of welding electrodes. | 11 | Nos | 55,760 ₹6.1 L | 52,280 ₹5.8 L |
| 6.00 | Charges for renewal of expansion joint of size 3113x3800 before ESP inlet including drawal of materials and devolution of scrap at central stores. Cutting and removal of eroded expansion joint of size of 3113x3800. This work involves providing platforms inside and outside the ducts, locking and arresting the upstream and downstream sides of flue gas ducts, cutting, dismantling and removal of the eroded expansion joint before ESP inlet gates and devoluting the same to the Central Stores/MTPS- II. | 4 | Nos | 39,350 ₹1.6 L | 36,890 ₹1.5 L |
| 7.00 | Drawal of new expansion joint of size 3113x3800 from Central Store/MTPS-II, Altering the metallic joint as per the MTPS-II Site condition and transporting to Boiler area lifting, leading and erection in position, alignment with flue gas duct and welding. Finally cutting and removing all the locking and arresting arrangement, scaffolding and platforms. This work including the transporting charges of materials from Central Store to Boiler. (Including the cost of welding electrodes. | 4 | Nos | 55,760 ₹2.2 L | 52,280 ₹2.1 L |
| 8.00 | Fixing and removing the scaffolding arrangements for insulation work around the Flue gas duct, Hot PA duct and APH. | 36 | Nos | 5,940 ₹2.1 L | 5,560 ₹2.0 L |
| 9.00 | Removal of insulation Single layer (60mm thick) wool mattress, G.I Cladding sheet, stiffeners, retainer plates etc. welding the support plates, rectification and refixing the existing insulation Single layer (60mm thick) wool mattress, GI sheets, lead and lift etc in the required area of Flue gas duct and Air Pre Heater with new fastners. | 40 | m2 | 1,490 ₹59,600 | 1,390 ₹55,600 |
| 10.00 | Metallic expansion :Cutting and dismantling of existing Metallic expansion joint of size 8800x3800 of APH Flue gas outlet duct. This work involves locking and arresting the upstream and downstream sides of flue gas ducts, cutting, dismantling and removal of the damaged expansion joint and devoluting the same to the Central Stores/MTPS- II. | 4 | Nos | 1,29,300 ₹5.2 L | 1,21,220 ₹4.8 L |
Tender Value
Refer Docs
EMD Value
₹32,200
Closing Date
25 Aug 2025, 2:00 pmClosed
CE/ MTPS2
O/o.CE/ MTPS2
Lifting Loading Transporting of metallic expansion joint
2025_EB_593413_1
OT 155 Lifting Loading Transporting of metallic expansion joint
Open Tender
Maintenance Works
30 days
MTPS2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹32,200
Yes
12 Mar 2026
18 Aug 2025
26 Aug 2025
18 Aug 2025
25 Aug 2025
18 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid