| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC LAXMI MARKET JAYANT ALAKHRAJ BHAVAN NEAR MAMTA MOTOR BHUSA MORE PO JAYANT DIST SINGRAULI MP 486889 | SINGRAULI | MADHYA PRADESH | 486889 | ₹9.1 L Quoted ₹7.7 L | L1 | Accepted-AOC As per approved TCR |
| 2 | L2₹8.4 LRejected-Finance COAL GATE RENUSAGAR PARASI POST RENUSAGAR DISTT SONEBHADRA U P 231220 | RENUSAGAR | SONEBHADRA | U P | 231220 | ₹8.4 L | L2 | Rejected-Finance as per nit |
| Sl No | Description | Qty | Unit | M/S. UMASHANKAR PANDEY L1 | M/S. SAKUR AND SANJAY ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Laying and Jointing of 6''/8'' (150/200 MM) diameter MS Pipelines which includes loading, transportation, laying on support /ground , cutting,V groove making and peripheral welding at joints according to site condition etc., as per instruction of EIC.(Welding electrode to be provided by contractor and DA & O2 gases will be provided by department) | 8,000 | Mtr | 80 ₹6.4 L | 84 ₹6.7 L |
| 2.00 | Dismantling of 6''/8'' (150/200 MM) diameter MS Pipelines including cutting, loading, transportation, stacking etc., as per instruction of EIC. (DA & O2 gases will be provided by department) | 6,000 | Mtr | 20 ₹1.2 L | 22 ₹1.3 L |
| 3.00 | Fixing/Installation of 150/200 mm NRV/Sluice valves (both end welding joint), as per instruction of EIC (Welding electrode to be provided by contractor and DA & O2 gases will be provided by department)) | 25 | Nos. | 150 ₹3,750 | 825 ₹20,625 |
| 4.00 | Dismantling and shifting of 150/200 mm NRV/Sluice valves, as per instruction of EIC (DA & O2 gases will be provided by department) | 25 | Nos. | 135 ₹3,375 | 550 ₹13,750 |
| 5.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Updated dates
Tender Value
₹9.1 L
EMD Value
₹11,400
Closing Date
23 Jan 2026, 9:00 amClosed
Staff Officer (EM), Bina
Office of Area General Manager Bina Project NCL U.P. 231220
Laying, Jointing, Shifting and Dismantling of 6 inch 150 mm and 8 inch 200 mm diameter MS/GI pipeline, for dewatering from active coal faces and various sumps for 730 days as when as required at Bina Project.
2026_NCL_350521_1
B/EM/eTender/2025-26/64 Dt. 03.01.2026
Open Tender
Electrical and Maintenance Works
730 days
Bina Project
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,400
8 May 2026
5 Jan 2026
24 Jan 2026
5 Jan 2026
23 Jan 2026
6 Jan 2026
5 Jan 2026 - 12 Jan 2026
Laying and Jointing of 6''/8'' (150/200 MM) diameter MS Pipelines which includes loading, transportation, laying on support /ground , cutting,V groove making and peripheral welding at joints according to site condition etc., as per instruction of EIC.(Welding electrode to be provided by contractor and DA & O2 gases will be provided by department)
Dismantling of 6''/8'' (150/200 MM) diameter MS Pipelines including cutting, loading, transportation, stacking etc., as per instruction of EIC. (DA & O2 gases will be provided by department)
Fixing/Installation of 150/200 mm NRV/Sluice valves (both end welding joint), as per instruction of EIC (Welding electrode to be provided by contractor and DA & O2 gases will be provided by department))
Dismantling and shifting of 150/200 mm NRV/Sluice valves, as per instruction of EIC (DA & O2 gases will be provided by department)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.99 MB
BOQ_363276.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid