Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹47,132
Closing Date
18 Jun 2026, 11:00 am
Divisional Forest Officer, Baratang
Divisional Forest Office, Baratang
Construction of Camp Office at Forest Nursery, Lorojig under Adajig Range, Baratang Forest Division, in lieu of the existing Camp Office to be affected due to the construction of a Minor Bridge by NHIDCL
2026_DFOBT_23173_1
G/236-BT/Vol-III/417
Open Tender
Construction Works
180 days
Lorojig, Baratang
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹47,132
In the Chamber of the DFO, (BT)
27 May 2026
27 May 2026
18 Jun 2026
27 May 2026
18 Jun 2026
27 May 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 1 | Cum | 100 | ₹99.9 |
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | Cum | 100 | - | |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | Cum | 10 | - |
Providing and fixing up to floor five level precast cement concrete hollow block fencing post in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete. 1:1½:3 (1 Cement : 1½ coarse sand (zone III) : 3 graded stone aggregate 20 mm nominal size). | - | Cum | 10 | - | |
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 1 | Cum | 10 | ₹9.99 | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 10 | - | |
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size derived from natural sources : | - | Sqm | 10 | - | |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 1 | Sqm | 10 | ₹9.99 |
| 8.1 | Suspended floors, roofs, landings, balconies and access platform. Store Room Shelves | 1 | Sqm | 10 | ₹9.99 |
| 8.2 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 79.29 | Sqm | 10 | ₹792.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.56 MB
BOQ_24567.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid