| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC VILLAGE POST FATEHPUR SANGAT GOSAIGANJ DISTRICT SULTANPUR | GOSAIGANJ | SULTANPUR | UTTAR PRADESH | L1 | Accepted-AOC 1st Lowest Bider | |
| 2 | L2₹10.1 L+₹43,245.58 (4.46%)Rejected-Finance | L2 | Rejected-Finance Highest Bider | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Completed their technical Bid |
Tender Value
₹12.7 L
EMD Value
₹1.3 L
Closing Date
9 Mar 2023, 5:00 pmClosed
Executive Engineer, I.D.Tanda Ambedkarnagar
Office of Executive Engineer, I.D.Tanda Ambedkarnagar
Lot 01 Extension Rasing of Causeway at km. 20.100 of Thiruwa Drain.
2023_UPIDC_780600_1
261/2022-23 Dt. 25-02-2023 T.N.No-08/EE/2022-23
Open Tender
Civil Works - Canal
Item Rate
15 days
Ambedkarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹942
₹1.3 L
Yes
21 Sept 2023
4 Mar 2023
10 Mar 2023
4 Mar 2023
9 Mar 2023
4 Mar 2023
Amount
Dismantling of existing B.O.E soling on ramp of causeway including all labour & T&P.
E/W in digging foundation for extension of causeway including all labour & T&P etc.
C.C. 1:4:8 with cement, c/sand & 25-50 mm size break ballest including all labour & T&P.
Ist class brick work in cm 1:3 with cement & c/sand mortor including cost of material all labour & T&P etc.
S/filling of local sand in H.P gaps including cost of material all labour & T&P etc.
C.C 1:1.5:3 with cement, c/sand & 10-20 mm size stone grit including cost of material all labour & T&P etc.
S/Laying 600 mm internal die NP3 hume pipe i/c cost of its carriage, cost of pipe, all labour T&P & fixing in proper position i/c all labour T&P etc.
Ist class brick work in 1:3 C.M. in side protection railing in cement & c/sand mortor i/c cost of all meterial alll labour and T&P etc.
E/W in filling in embankment of approch road of causeway including all load & lift all labour & T&P etc.
B.O.E soling with dismentled brick including cost of all maerial labour and T&P.
Ist class B.O.E. soling on ramp (causeway approch) including cost of brick, carriage up to side all labour and T&P.
Deep struck cement pointing in 1:2 CM with cement & c/sand over brick work including cost of all material, labour and T&P etc.
Dewatering @ 8% i/c cost of boring, cost of pump set all labour T&P requrid for proper compeletion of work.
M/S Asha Ram Verma Thekedar
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .