| 1 | L-1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L-1 | Accepted-AOC Work is awarded to the lowest bidder (l-1) M/s Thakur Construction |
| 2 | L-2₹1.4 Cr+₹25.6 L (23.3%)Rejected-Finance 220 A P COLONY GAYA BIHAR 800023 | PATNA | BIHAR | 800023 | ₹1.4 Cr+₹25.6 L (23.3%) | L-2 | Rejected-Finance Quoted amount more than lowest bidder (L-1) |
| 3 | L-3₹1.7 Cr+₹58.2 L (53.0%)Rejected-Finance PLOT NO 67 VIMPUR P O NEW BAPUJI NAGAR P S AIRFIELD BHUBANESWAR PIN 751020 KHURDA ODISHA | KHORDHA | ODISHA | 751020 | ₹1.7 Cr+₹58.2 L (53.0%) | L-3 | Rejected-Finance Quoted amount more than lowest bidder (L-1) |
| 4 | L-4₹1.7 Cr+₹62.1 L (56.5%)Rejected-Finance | ₹1.7 Cr+₹62.1 L (56.5%) | L-4 | Rejected-Finance Quoted amount more than lowest bidder (L-1) |
| 5 | L-5₹1.8 Cr+₹66.8 L (60.8%)Rejected-Finance | ₹1.8 Cr+₹66.8 L (60.8%) | L-5 | Rejected-Finance Quoted amount more than lowest bidder (L-1) |
Tender Value
₹3.1 Cr
EMD Value
₹6.1 L
Closing Date
29 Jun 2022, 6:00 pmClosed
AGM(E-C)-I
AGM(E-C)-I, AAI, S.V. Airport, Raipur
Levelling and grading of area 24 and 06 side in newly acquired land at S.V. Airport, Raipur
2022_AAI_101772_1
AAI/RPR/AGM(E-C)-I/CW-08/2022
Open Tender
Civil Works
Works
240 days
AAI, S.V. Airport
Please refer Tender documents.
13 documents required · 13 mandatory
₹1,120
₹6.1 L
26 Aug 2022
7 Jun 2022
1 Jul 2022
8 Jun 2022
29 Jun 2022
8 Jun 2022
8 Jun 2022 - 24 Jun 2022
Amount
Earth work in excavation with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross section, and transporting to the embankment/filling location within all lifts and leads within AAI premises including construction of embankment with excavated earth at locations by spreading soil in layer not excading 20 cm in loose including breaking chods, watering and consolidating each layer with 8 to 10 tome capacity vibratory roller to achieve min. 95% relative compaction (field density), required slope as per MoRth specification and direction and satisfaction of Engg-in-charge.
Supplying and laying good earth in layers of 20cm finished depth, breaking clods/ over size material, removal of stumps/roots and the like & watering, grading/levelling each layer with dozers/grader and rolling every layer with vibratory roller/ earth compactor of minimum 8-12 tonnes capacity to achieve Min 95% relative compaction (field density) and dressing to the required grade, camber and slope complete as per specifications and as directed by the Engineer-in-charge.(filling material confirming to CBR value not less than-10) (The item includes cost of work, payment of necessary royalty, carriage of good earth upto work site for all leads and lifts involved for compacted quantity only).
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. a) All kinds of soil
Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : a) bituminous road
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for a) Foundations, footings, bases of columns, etc. for mass concrete
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : a) 450 mm dia RCC pipes.
b) 600 mm dia RCC pipes.
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. a) Beyond 30 cm girth upto and including 60 cm girth
M/s Awadhesh Construction
MD RIYAJUDDIN
A SIDDHI CONSTRUCTION CO
SSD CONSTRUCTION
Y SAHITYA
R K MISHRA AND COMPANY
TANAYA AGRAWAL
RKBUILDER
LAKSHMI SRINIVASA CONSTRUCTIONS
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .