| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 CrAdmitted-Finance | -3.60% | ₹3.7 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Reject |
Tender Value
₹4 Cr
EMD Value
₹8 L
Closing Date
10 Mar 2026, 2:00 pmClosed
SECRETARY
uit alwar
Carpeting of Roads by Paver Finisher in scheme area of EE-III, UIT, Alwar.
2026_UITAL_538352_6
NIT 42/2025-26
Open Tender
Civil Works
240 days
UIT ALWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Secretary, UIT
₹8 L
Yes
6 Apr 2026
19 Feb 2026
10 Mar 2026
19 Feb 2026
10 Mar 2026
19 Feb 2026
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3
Milling of distress bitumenous layer upto 70mm depth in a single pass with suitable milling machine (capable of milling @ 200&300 sqm of area per hr) fitted with loading conveyer of loading the filled material directly on the trucks i/c hauling and stock pilling the reclaiming to bring to required specification to reuse with the approval of engineer - in - charge for safe disposal; with all leads and lifts complete in all respect as directly by Engineer - in- charge. *Note : The unutilized quality of reclaimed bituminous mix material shall be recovered.
Carriage of earth, sand, lime, morrum, manure or sludge including loading/ unloading etc. complete with lead upto 15km.
Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete. [MoRTH specification : Clause 401]. By mechanical means For Grading-III Material
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. by mechanical mean with all lead.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 4.0 & 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 505 complete in all respects. Bitumen (VG-30) Grading - II (26.50 mm (Nominal Size))
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 5.2 & 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 507 complete in all respects for Grading-II(13 mm nominal size) Bitumen (VG-30)
Raising precast circular manhole cover and frame by taking out existing precast frame and cover, providing and fixing precast SFRC circular spacer of required height, re-fixing existing manhole cover frame and cover with cement sand mortar (1:3), including making good the damage, complete as directed by Engineer.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_963286.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tendernotice_2.pdf
PDF • 0.22 MB
TechBiditem18.pdf
Tender Documents • 0.49 MB
BOQ_963286.xls
BOQ • 0.30 MB
FinBiditem18.pdf
Tender Documents • 0.10 MB
Download all tender documents and submit your bid