Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC GROUND FLOOR 72 BUSINESS PARK CROSS ROAD C MAROL INDUSTRIAL AREA MIDC ANDHERI EAST MUMBAI MUMBAI MAHARASHTRA 400093 | MUMBAI SUBURBAN | MAHARASHTRA | 400093 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹2.9 L+₹22,420 (8.30%)Rejected-AOC | L2 | Rejected-AOC Being L2 | |
| 3 | L3₹3.1 L+₹38,350 (14.2%)Rejected-Finance 7 CHANDRAVIJAY CHS L T ROAD MUMBAI SUBURBAN MUMBAI MAHARASHTRA 400081 | MUMBAI SUBURBAN | MAHARASHTRA | 400081 | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical E41 RAHUL KUMAR JHA E41 OKHLA INDUSTRIAL AREA PH 2 OKHLA PHASE 2 NEW DELHI DELHI 110020 | SOUTH EAST DELHI | DELHI | 110020 | - | Rejected-Technical even after 2nd shortfall not submitted GST ,EPF ,MoEF and document as asked for EMD and tender cost |
Tender Value
₹3.8 L
EMD Value
₹9,500
Closing Date
30 Nov 2021, 3:00 pmClosed
SE
O/o The CE (Gen),Sarni
Work contract for analysis of Hazardous wastes Exhausted resin, Used Lubricating Oil and Spent transformer oil) samples and determination of dust concentration and free silica in Coal Handling area, ash handling area (silo) and mill areas of
2021_MPPGC_161079_1
WT3586
Open Tender
Miscellaneous Works
Fixed-rate
365 days
Sarni
As per NIT PQR
5 documents required · 5 mandatory
₹500
Yes
₹9,500
Yes
11 Oct 2022
13 Oct 2021
3 Dec 2021
13 Oct 2021
30 Nov 2021
13 Oct 2021
Work contract for analysis of Hazardous wastes (Exhausted resin, Used Lubricating Oil and Spent transformer oil) samples and determination of dust concentration and free silica (in %) in Coal Handling area, ash handling area (silo) and mill areas of Satpura Thermal Power Station, Sarni (M.P.).
Collection and analysis of Exhausted Resin samples for the following parameters- Metals- Hg, Cd+Hg+Ti, As+Co+Ni+Sb+Cr+Sn+Pb+V, PCB/PBT, Halogens & Sulphur content
Collection and analysis of Used Lubricating oil and Transformer oil samples for the following parameters- 1) Polychlorinated biphenyls (PCBs) (in ppm) 2) Lead (in ppm) 3) Arsenic (in ppm) 4) Cadmium+Chromium+Nickel (in ppm) 5) Polyaromatic hydrocarbons (PAH) (in %)
Collection of air samples from the following areas for determination of dust concentration and free silica (in %)- (a) Coal Handling Plant area, (b) Ash Handling Plant (silo) area and (c) mill areas of units 10 & 11
MAHABAL ENVIRO ENGINEERS PRIVATE LIMITED
Ashwamedh Engineers and Consultants
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .