Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹11.5 Cr
EMD Value
₹23.0 L
Closing Date
1 Dec 2026, 6:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GM RSRDC LTD JAIPUR
GM RSRDC LTD SETU BHAWAN, JHALANA DOONGARI, JAIPUR
Construction of Remaining Balance work of 02 Lane ROB at LC No. 02 on Ajmer-Daurai Section on DFC Route at Ajmer (Excluding cost of Cement)
2026_RSRDC_604897_1
NIT No. 444/2026-27 dated 26.10.2026
Open Tender
Civil Works
Percentage
240 days
Ajmer-Daurai Section on DFC Route at Ajmer
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹11,800
PD RSRDC UNIT AJMER THROUGH NEFT/RTGS/IMPS
₹23.0 L
PD RSRDC UNIT AJMER
1 Dec 2026
27 Oct 2026
2 Dec 2026
27 Oct 2026
1 Dec 2026
6 Nov 2026
5 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. | 0 | Cum | 0 | ₹0 |
| 2 | (a) in ordinary rock: Depth upto 1.5 m | 47.95 | Cum | 730 | ₹35,003.5 |
| 3 | carriage of Material by mechanical transport i/c loading, unloading and stacking for 10 KM | 47.95 | Cum | 124.03 | ₹5,947.24 |
| 4 | Providing, laying and compacting plain/ reinforced cement concrete of specified grade in foundation/ leveling course/pilecap usingconcrete mixer and vibrater complete including cost of form work, as per drawing and technical specifications and as per clause 1100,1500,1700,2100 of MoRT&H specification including all scaffolding material, labour, machinery. : PCC Grade M -15 (Excluding cost of cement) | 133.53 | Cum | 2,165.6 | ₹2,89,175.82 |
| 5 | Providing, laying and compacting design mix plain/ reinforced cement concrete of specified grade in foundation/ levelingcourse/pile cap using batching plant, transit mixer and concrete pump and vibrater including cost of form work, complete as per drawing and technical specifications as per clause 1100, 1500,1700,2100 of RT&H specification including all material, labour, machinery, : R.C.C. grade M35 Design mix concrete (Excluding cost of cement) | 311.75 | Cum | 3,020 | ₹9,41,485 |
| 6 | Providing and laying TMT bar reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery.: HYSD bar reinforcement | 0 | Cum | 0 | ₹0 |
| 7 | SUB STRUCTURE | 0 | Cum | 0 | ₹0 |
| 8 | Providing and laying structural plain/ reinforced cement concrete (design mix) of specified grade in substructure at all levels using batching plant, transit mixer, concrete pump and vibrater cluding cost of form work complete as per drawing and clause 1500, 1700 and 2200 of MoRT&H specification including all scaffolding, material, labour, machinery etc.: RCC Grade M -35 (Excluding cost of cement) | 49.82 | Cum | 3,540 | ₹1,76,354.3 |
| 9 | Providing and laying TMT bar reinforcement at any level infoundation/ pile/ pile cap complete as per drawing and clause 1600of MoRT&H Specification including all material, labour and machinery.: HYSD Bar Reinforcement | 9.96 | MT | 65,700 | ₹6,54,603.26 |
| 10 | Supplying, fitting and fixing in position true to line and level POTPTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRT&H Specifications complete as per drawing and approved technical specifications and as per clause 2000 & 2200 of MoRT&H Specification including all scaffolding, material, labour, machinery etc. | 4,600 | per tonn load | 308 | ₹14,16,800 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
SBD.pdf
Tender Documents • 1.50 MB
BOQ_1072771.xls
BOQ • 0.37 MB
Various_Act_Circulars_Orders_Notification.pdf
Tender Documents • 1.27 MB
BankDetails_compressed.pdf
Tender Documents • 0.01 MB
QCorderdated_19042010.pdf
Tender Documents • 0.92 MB
corrigendumtomodifieddates23112026.pdf
PDF • 0.54 MB
corrigendumtomodifieddates12112026.pdf
PDF • 0.32 MB
corrigendumtoitemno59_06112026.pdf
PDF • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .