Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Li₹26.6 LAccepted-AOC | ₹26.6 L | Li | Accepted-AOC Eligible for Tender |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹25.3 L
EMD Value
₹50,580
Closing Date
29 Jan 2024, 3:00 pmClosed
Executive Officer
Town Panchayat Mallur
REMOVAL OF HISTORICAL GARBAGE WASTE DUMPED SF NO 7 AT WARD NO 3 KILAKKU KATTU KOTTAI SWM RR PARK BIO MINING PROCESS IN MALLUR TOWN PANCHAYAT
2024_DTP_409941_1
302/2022
Open Tender
Civil Works
Works
Mallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹50,580
10 Mar 2025
13 Jan 2024
30 Jan 2024
13 Jan 2024
29 Jan 2024
13 Jan 2024
Amount
Revamping of existing dumped garbage in compost yard at Namagiripettai Town Panchayat, by Bio-mining process a.Excavating the existing mixed compacted garbage which underwent biological degradation in the land portion allocated/earmarked by Town Panchayat authority and spraying with microbial innoculam for sanitizing and stabilizing the excavated mass seiving them using Mechanical Seiving machine or any other equipmnet at the cost of the Bidder. b.Stabilization of the open land fill site b.Stabilization of the open land fill site c.Control of mal odour using Deodourising agent and stabilising the waste using Bio Culture for aerobic composting using industrial sprayer d.Eco friendly and nonpolluting process in order to reduce the impact of dumping site in the adjacent areas e.Excavating the soil which lost its stability due to garbage dumping with necessary dewatering works in the portion of the land earmarked f.Segregate the excavated garbage in the land portion earmarked, into as many kinds and categories as possible at the cost of the Bidder including cost of any power or fuel Consumption. g.Selling, diverting for recycling, marketing and recycling the excavated materials within SEVEN DAYS of segregation, without any accumulation in the storage facility at the project site h.Creation and maintenance of infrastructure, facilities and amenities, for sieving, the excavated garbage, storing the segregated materials before selling/taking out them from the project site i.Deployment of necessary manpower, materials, equipment’s, tools and construction of plants and sheds and creation of facilities for handling, separating, segregating, storing and weighing facilities for the operation of the plant and using only covered body vehicles for the transportation of materials j.Create all facilities and make arrangements for controlling the emission, pollution and contamination of Environment including atmosphere, air, water and earth including control of dust and noise pollution
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .