| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹12.6 L (6.54%)Admitted-Finance | ₹2.1 Cr+₹12.6 L (6.54%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 Cr+₹31.7 L (16.4%)Admitted-Finance | ₹2.2 Cr+₹31.7 L (16.4%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rama Power construction L2 | E-VISION INFRATECH L3 | MS RK ERACTORS L1 |
|---|---|---|---|---|---|---|
| .50Name of Work | ||||||
| 1.00 | SUPPLY OF TOWER MATERIAL | - | - | - | - | - |
| 1.10 | Supply of Galv. Tower parts for 132 kV extension & stub setting template as per drawing & BOM | 74.21 | MT | 95,000 ₹70,49,950 | 94,800 ₹70,35,108 | 86,800 ₹64,41,428 Lowest |
| 1.20 | Hot dip galvanized,Hexagon round hexazone head trasnmission towers bolts, nuts & washers for above structure as BOM | 2.97 | MT | 1,30,000 ₹3,85,892 | 1,23,600 ₹3,66,894.24 | 1,21,800 ₹3,61,551.12 Lowest |
| 2.00 | TOWER ACCESSORIEES | - | - | - | - | - |
| 2.10 | Number Plate | 9 | Nos | 290 ₹2,610 | 310 ₹2,790 | 275 ₹2,475 Lowest |
| 2.20 | Danger Plate | 9 | Nos | 290 ₹2,610 | 310 ₹2,790 | 275 ₹2,475 Lowest |
| 2.30 | Phase Plate Set | 112 | Nos | 350 ₹39,200 | 310 ₹34,720 | 225 ₹25,200 Lowest |
| 2.40 | Bird Guard | 200 | Nos | 800 ₹1,60,000 | 410 ₹82,000 | 370 ₹74,000 Lowest |
| 2.50 | Pipe type Earthing Material for Towers | 18 | Nos | 3,500 ₹63,000 | 3,100 ₹55,800 | 2,450 ₹44,100 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
22 May 2023, 4:00 pmClosed
SE ETC Jhansi
132KV S/S Hasari Jhansi
Work
2023_UPTCL_796840_1
ETS-01/ETC(J)/23-24
Open Tender
Electrical Works
Fixed-rate
180 days
Orai
As per PQR
2 documents required · 2 mandatory
₹8,850
SE ETC JHANSI
₹2.3 L
10 Jan 2024
12 Apr 2023
23 May 2023
12 Apr 2023
22 May 2023
12 Apr 2023
Amount
SUPPLY OF TOWER MATERIAL
Supply of Galv. Tower parts for 132 kV extension & stub setting template as per drawing & BOM
Hot dip galvanized,Hexagon round hexazone head trasnmission towers bolts, nuts & washers for above structure as BOM
TOWER ACCESSORIEES
Number Plate
Danger Plate
Phase Plate Set
Bird Guard
Pipe type Earthing Material for Towers
HARDWARE AND INSULATOR SUITABLE FOR PANTHER CONDUCTOR
Single Suspension Fitting suitable for Panther Conductor
Single Tension Fitting suitable for Panther Conductor
Double Tension Fitting suitable for Panther Conductor
Insulator 70 K.N.
Insulator 120 K.N.
CONDUCTOR ACCESSORIES SUITABLE FOR PANTHER CONDUCTOR
Vibration Damper
M.S.Joint
Repair Sleeve
P.A. Rod
EARTHWIRE ACCESSORIES
Vibration Damper
M.S.Joint
Tension Clamp
Copper Bond
Survey including preparation of schedule of material,marking of locations(route length),GPS survey of line with Co-ordinate of each tower (The length of line shall be authenticated by GPS Survey
Check Survey
Soil Investigation (all kind of soil)
Cost of Excavation of 132 kV Tower foundation pits including all earth work, back filling, dewatering and levelling
Setting of Stubs including all foundation work but excluding cost of Concreting and Excavation for 132 kV D/C Towers( 01 job defined as work for one Loc)
(1) 132 KV DB PANTHER
(2) 132 KV DC PANTHER
Cost of Concreting for all types of 132 kV D/C towersfoundation including cost of cement, coarse,sand,stone grate,dewating, shoring and shuttering, forming, curing but excluding cost of reinforcement bars. As per technical specification
Erection of superstructure of 132 kV D/C toers and their extensions including all works above grond level and fitting of danger,number & phase plate etc but excluding hoisting of insulators, hardware and accesorries
Tack welding of all nuts anf bolts upto the height of one section of tower of 5 mtrs from the ground level whichever is higher with three tacks at 120 degree space by 10mm/12mm space electrode and application of zinc rich paint on the affected surface including cost of all material.
Laying, Stringing, Tensioning clamping , jointing etc of all 3 phase ACSR Panther conductor including hoisting of insulators, fitting of all neccesory hardware and accessories.
Stringing of 1 Nos earthwire 7/10 SWG including fitting of all necessary hardware and accessories i.e. fitting, vibration damper etc including all labour nad T&P( One job defined as one location) Ref. Expressway BOQ 132 kV ORAI-MOTH LINE.
De-stringing of panther conductor including insulator hardware fitting conductor accessories such as clamp, tension clamp, suspension clamp , vibration dampers, armour rod etc of existing line , including rerolling of conductor in empty drums fro re-use,safely transportation of all removed material to UPPTCL store including cost of all labour and T&P.
Earthing of tower including the cost of coke & salt but excluding the cost of earthing material.
Installation of steel Reinforcement bars in R.C.C. foundation including cost of cutting, welding, binding and placing them in foundation pits.
Transportation of dismantled conductor and accesorries from site to UPPTCL store with loading & unloading. (dist- 40+40=80 km) Ref. Expressway BOQ 132 kV ORAI-MOTH LINE.
Rama Power construction
E-VISION INFRATECH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .