Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹18.3 L+₹1.1 L (6.56%)Accepted-Finance A 24 HOUSING UNIT KOLLAMPALAYAM ERODE 638 002 | ERODE | TAMIL NADU | 638002 | L2 | Accepted-Finance Accepted | |
| 3 | Rejected-Technical | - | Rejected-Technical Same IP address and Necessary Documents Not enclosed | |
| 4 | Rejected-Technical | - | Rejected-Technical Necessary Documents Not enclosed | |
| 5 | Rejected-Technical | - | Rejected-Technical Same IP address and Necessary Documents Not enclosed |
| Sl No | Description | Qty | Unit | SM CONSTRUCTIONS L1 | VR CONSTRUCTIONS AND PROJECTS L5 | DIVYARAYARBUILDERS L4 | M/s. Kousic & Co L2 | VE KAY CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all classes of soils and subsoils and to depth as may be directed except in hard rock, requiring blasting, including in final leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth within the compound etc, complete complying with standard specification | 1,663 | M3 | 100 ₹1,66,300 | 450 ₹7,48,350 | 340 ₹5,65,420 | 125 ₹2,07,875 | 6.01 ₹9,994.63 Lowest |
| 2.00 | Conveyance of Earth to be dumped at site area the cost including conveyance of earth by lorry loading and unloading etc, Complete | 1,663 | M3 | 180 ₹2,99,340 | 450 ₹7,48,350 | 340 ₹5,65,420 | 200 ₹3,32,600 | 6.01 ₹9,994.63 Lowest |
| 3.00 | Supplying and filling in foundation, basement, etc with Sand Gravel mix in ratio of 1:3 in layers of not more than 15cm thick thoroughly mixed, well watered, rammed with surface vibrator and consolidated etc. complete complying with standard specification and as directed by the departmental officers | 571.45 | M3 | 750 ₹4,28,587.5 | 300 ₹1,71,435 Lowest | 300 ₹1,71,435 Lowest | 760 ₹4,34,302 | 2,701.13 ₹15,43,560.74 |
| 4.00 | Conveyance of Earth to be filled at site area from outside the cost including conveyance of earth by lorry loading and unloading etc., Complete | 1,497 | M3 | 375 ₹5,61,375 | 300 ₹4,49,100 | 295 ₹4,41,615 | 385 ₹5,76,345 | 66.8 ₹99,999.6 Lowest |
| 5.00 | GST @ 18% | 1 | Nos | 0 ₹2,62,008.45 Lowest | 0 ₹3,81,102.3 | 0 ₹3,13,900.2 | 0 ₹2,79,201.96 | 0 ₹2,99,438.93 |
Tender Value
₹21.4 L
EMD Value
₹20,800
Closing Date
14 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE OFFICER
Arulmigu Raveeswarar, Temple,Vyasarpadi, Chennai 39,
Earth filling (Replacement of existing soil upto 4m) for the Archagar and Staff Quarters Belong to Arulmigu Raveeswarar, Temple,Vyasarpadi, Chennai
2026_HRCE_703544_1
3770/2026
Open Tender
Civil Works
Lump-sum
90 days
Arulmigu Raveeswarar, Temple, Vyasarpadi
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹20,800
Yes
22 Oct 2026
25 Sept 2026
14 Oct 2026
25 Sept 2026
14 Oct 2026
25 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all classes of soils and subsoils and to depth as may be directed except in hard rock, requiring blasting, including in final leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth within the compound etc, complete complying with standard specification | 1,663 | M3 | 285.22 | ₹4,74,320.86 |
| 2 | Conveyance of Earth to be dumped at site area the cost including conveyance of earth by lorry loading and unloading etc, Complete | 1,663 | M3 | 117.9 | ₹1,96,067.7 |
| 3 | Supplying and filling in foundation, basement, etc with Sand Gravel mix in ratio of 1:3 in layers of not more than 15cm thick thoroughly mixed, well watered, rammed with surface vibrator and consolidated etc. complete complying with standard specification and as directed by the departmental officers | 571.45 | M3 | 1,184.25 | ₹6,76,739.66 |
| 4 | Conveyance of Earth to be filled at site area from outside the cost including conveyance of earth by lorry loading and unloading etc., Complete | 1,497 | M3 | 314.07 | ₹4,70,162.79 |
| 5 | GST @ 18% | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_845648.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
Raveeswararteders.pdf
Tender Documents • 0.80 MB
BOQ_845648.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .