Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹37.7 LAdmitted-Finance | -36.25% | ₹37.7 L | L1 | Admitted-Finance |
| 2 | L2₹37.7 L+₹2,954.15 (0.08%)Admitted-Finance | -36.20% | ₹37.7 L+₹2,954.15 (0.08%) | L2 | Admitted-Finance |
| 3 | L3₹40.9 L+₹3.2 L (8.61%)Admitted-Finance | -30.76% | ₹40.9 L+₹3.2 L (8.61%) | L3 | Admitted-Finance |
| 4 | L4₹42.8 L+₹5.1 L (13.6%)Admitted-Finance | -27.61% | ₹42.8 L+₹5.1 L (13.6%) | L4 | Admitted-Finance |
| 5 | L5₹43.5 L+₹5.8 L (15.5%)Admitted-Finance | -26.40% | ₹43.5 L+₹5.8 L (15.5%) | L5 | Admitted-Finance |
Tender Value
₹59.1 L
EMD Value
₹1.2 L
Closing Date
20 Aug 2026, 4:00 pmClosed
Executive Engineer RnB DIVISION SUMBAL
Sumbal Sonawari
Govt High School SK Payeen (Construction of Science Room, Art Craft Room and Library).
2026_PWDJK_320501_1
NIT NO 46 OF 2026-27/SUMBAL DIVISION
Open Tender
Civil Works
Percentage
180 days
Sumbal Sonawari
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
Executive Engineer RnB DIVISION SUMBAL
₹1.2 L
22 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (Ordinary rock) | 1,812.26 | Cum | 392.8 | ₹7,11,855.73 |
| 2 | Earth work in excavation by Mechanical in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 56.94 | Cum | 256.85 | ₹14,625.04 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m. | 164.56 | Cum | 218.4 | ₹35,939.9 |
| 4 | Providing and laying of stone soling hand packed tightly including watering, ramming and all carriages as involved upto site of work complete | 30.52 | Cum | 1,000 | ₹30,520 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level. M-7.5 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate) 40mm nominal size crushed in foundation and under flooring, all work including carriage of material | 21.82 | Cum | 5,202.9 | ₹1,13,527.28 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete in 1:1.5:3 mix including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level including carriage complete. | 22.09 | Cum | 7,788.4 | ₹1,72,045.76 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – all works upto plinth level: M-15 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size crushed ) including carriage of material | 56.68 | Cum | 6,591.25 | ₹3,73,592.05 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 40.48 | Cum | 9,821.85 | ₹3,97,588.49 |
| 9 | Brick work with common burnt clay (non modular) bricks class designation 75 in in superstructure above plinth level upto floor five level including curing in 1:6 cement mortar | 23.46 | Cum | 9,469 | ₹2,22,142.74 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for:-Foundation ,footings,bases of columns | 226.25 | sqm | 286.35 | ₹64,786.69 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1065663.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .