| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC R O VILL CHEOG TEH THEOG DISTT SHIMLA | ₹7.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.5 L+₹91,502 (12.1%)Rejected-Finance R O VERMA NIWAS LOWER CEMETERY SANJAULI SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹8.5 L+₹91,502 (12.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹10.5 L+₹3.0 L (39.1%)Rejected-Finance VERMA COTTAGE BELOW B C S NEW SHIMLA H P | ₹10.5 L+₹3.0 L (39.1%) | L3 | Rejected-Finance L3 |
| 4 | L4₹11.0 L+₹3.4 L (45.0%)Rejected-Finance | ₹11.0 L+₹3.4 L (45.0%) | L4 | Rejected-Finance L4 |
| 5 | L5₹11.1 L+₹3.5 L (46.9%)Rejected-Finance HIMACHAL PRADESH HP | ₹11.1 L+₹3.5 L (46.9%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | KHAJAN SINGH L6 | MANOHAR LAL VERMA L2 | VINOD VERMA L3 | Daksh Vardhan Singh L4 | rajinder verma L5 | SUNEEL CHAUHAN L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc., in earth work in all type of soil such as pick work, jumper work, blasting work Kankar, moorum shingles including decomposed soft and hard rock etc., up to all heights stacking the excavated earth not more 3 meters clear from the edge of excavation and then returning the stacked soil in 15cm. layers, when required into plinth and sides of foundation etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth up to including all leads and lifts complete in all respect and as per the direction of Engineer-in-charge. | 150 | cum | 250 ₹37,500 | 120 ₹18,000 | 10 ₹1,500 Lowest | 200 ₹30,000 | 240 ₹36,000 | 10 ₹1,500 Lowest |
| 2.00 | Stone soling on excavated surface complete as per the direction of Engineer-in-charge. | 4.63 | cum | 2,800 ₹12,964 | 1,000 ₹4,630 Lowest | 1,200 ₹5,556 | 1,200 ₹5,556 | 1,500 ₹6,945 | 2,300 ₹10,649 |
| 3.00 | Providing and laying cement concrete 1:3:6 (1cement 3 sand :6 Graded stone aggregate 20mm nominal size ) and curing complete excluding cost of form work in foundation and plinth complete as per direction of Er.-in-charge. | 4.63 | cum | 6,500 ₹30,095 | 7,000 ₹32,410 | 5,000 ₹23,150 | 4,800 ₹22,224 | 4,000 ₹18,520 Lowest | 7,200 ₹33,336 |
| 4.00 | Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm so as to give finish including centering, shuttering, strutting and propping etc., with wooden ballies and battens height of propping and centring below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete and plain concrete work in:- Foundation, footing, basis of columns etc. and mass concrete. Including all leads and lifts complete in all respects and as per direction of Engineer in Charge. | 130.41 | sqm | 250 ₹32,602.5 | 120 ₹15,649.2 | 50 ₹6,520.5 Lowest | 200 ₹26,082 | 290 ₹37,818.9 | 100 ₹13,041 |
| 5.00 | Providing and laying in position specified grade of reinforced cement
concrete excluding the cost of entering, shuttering, finishing and
reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) concrete as per direction of Engineer in Charge. | 60.28 | cum | 8,200 ₹4,94,296 | 8,500 ₹5,12,380 | 8,600 ₹5,18,408 | 8,500 ₹5,12,380 | 7,000 ₹4,21,960 Lowest | 9,000 ₹5,42,520 |
| 6.00 | Providing mild steel/tor steel reinforcement for RCC work including
bending, binding and placing in position complete upto floor two level @120kg/m^3. Including all leads and lifts complete in all respect and as per the direction of Engineer-in-charge. | 5,425.2 | kg | 98 ₹5,31,669.6 | 20 ₹1,08,504 | 82 ₹4,44,866.4 | 78 ₹4,23,165.6 | 94 ₹5,09,968.8 | 1 ₹5,425.2 Lowest |
| 7.00 | Backfilling behind the retaining wall complete direction of Engineer-in-charge. | 50 | cum | 2,200 ₹1,10,000 | 3,000 ₹1,50,000 | 1,000 ₹50,000 Lowest | 1,400 ₹70,000 | 1,500 ₹75,000 | 2,800 ₹1,40,000 |
| 8.00 | Providing weep hole of 100 mm dia @1 Sqm Each complete as direction of Engineer-in-charge. | 60 | meter | 180 ₹10,800 | 120 ₹7,200 | 50 ₹3,000 Lowest | 150 ₹9,000 | 100 ₹6,000 | 180 ₹10,800 |
Tender Value
₹14.8 L
EMD Value
₹29,700
Closing Date
14 Jul 2026, 11:00 amClosed
AGM sewerage division US Club Shimla
AGM office sewerage division US Club Shimla
Restoration of Rain Damages Construction of RCC retaining wall for protection of Clarifier 6A at STP North Disposal
2026_SJPNL_137976_1
SJPNL/sewerage/NIT/917-16
Open Tender
Civil Works
Item Rate
90 days
Shimla
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
₹29,700
6 Aug 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
3 Jul 2026 - 14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches etc., in earth work in all type of soil such as pick work, jumper work, blasting work Kankar, moorum shingles including decomposed soft and hard rock etc., up to all heights stacking the excavated earth not more 3 meters clear from the edge of excavation and then returning the stacked soil in 15cm. layers, when required into plinth and sides of foundation etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth up to including all leads and lifts complete in all respect and as per the direction of Engineer-in-charge. | 150 | cum | 506.87 | ₹76,030.5 |
| 2 | Stone soling on excavated surface complete as per the direction of Engineer-in-charge. | 4.63 | cum | 506.87 | ₹2,346.81 |
| 3 | Providing and laying cement concrete 1:3:6 (1cement 3 sand :6 Graded stone aggregate 20mm nominal size ) and curing complete excluding cost of form work in foundation and plinth complete as per direction of Er.-in-charge. | 4.63 | cum | 506.87 | ₹2,346.81 |
| 4 | Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm so as to give finish including centering, shuttering, strutting and propping etc., with wooden ballies and battens height of propping and centring below supporting floor to ceiling not exceeding 4 metres and removal of the same for insitu reinforced concrete and plain concrete work in:- Foundation, footing, basis of columns etc. and mass concrete. Including all leads and lifts complete in all respects and as per direction of Engineer in Charge. | 130.41 | sqm | 506.87 | ₹66,100.92 |
| 5 | Providing and laying in position specified grade of reinforced cement
concrete excluding the cost of entering, shuttering, finishing and
reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) concrete as per direction of Engineer in Charge. | 60.28 | cum | 506.87 | ₹30,554.12 |
| 6 | Providing mild steel/tor steel reinforcement for RCC work including
bending, binding and placing in position complete upto floor two level @120kg/m^3. Including all leads and lifts complete in all respect and as per the direction of Engineer-in-charge. | 5,425.2 | kg | 506.87 | ₹27,49,871.12 |
| 7 | Backfilling behind the retaining wall complete direction of Engineer-in-charge. | 50 | cum | 506.87 | ₹25,343.5 |
| 8 | Providing weep hole of 100 mm dia @1 Sqm Each complete as direction of Engineer-in-charge. | 60 | meter | 506.87 | ₹30,412.2 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Form6.pdf
Tender Documents • 0.60 MB
Form8.pdf
Tender Documents • 1.94 MB
conditions.pdf
Tender Documents • 0.15 MB
BOQ_204332.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .