| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.7 LAccepted-AOC | ₹12.7 L | 1 | Accepted-AOC L1 Bidder |
| 2 | 2₹13.0 LRejected-Finance 565 566 ANNA NAGAR HOUSING UNIT II PONGALUR ROAD VEERAKERALAM SUGERCANE INSTITUTE POST COIMBATORE 641007 | COIMBATORE | COIMBATORE | TAMIL NADU | 641007 | ₹13.0 L | 2 | Rejected-Finance L2 tenderer |
| 3 | 3₹13.0 LRejected-Finance | ₹13.0 L | 3 | Rejected-Finance L3 tenderer |
| 4 | 4₹13.0 LRejected-Finance | ₹13.0 L | 4 | Rejected-Finance L4 tenderer |
| 5 | 5₹13.2 LRejected-Finance | ₹13.2 L | 5 | Rejected-Finance L5 tenderer |
| Sl No | Description | Qty | Unit | TRENCHLESS EQUIPMENTS L3 | SREE SRINIVASA ASSOCIATES L2 | vgopal L4 | Sudharshan Constructions L10 | ponmani and co L9 | iGreen Technologies L6 | NEWBHARATH ELECTRICALS AND ENTERPRISES L5 | Devakumar Enterprises L1 | Hansa Constructions L8 | SRV ELECTRIC WORKS L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils to a depth from 31cm to 135cm including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct including cost of signal boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, lead, lift, tools and plants etc., complete.The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic. | 13 | M3 | 8,645 ₹8,645 | 8,580 ₹8,580 | 8,905 ₹8,905 | 9,750 ₹9,750 | 9,483.5 ₹9,483.5 | 9,750 ₹9,750 | 2,600 ₹2,600 Lowest | 8,469.5 ₹8,469.5 | 8,450 ₹8,450 | 9,100 ₹9,100 |
| 2.00 | Drilling, Reaming & Laying of 33 KV Cable (3Nos). Using Trenchless Technology Method at a depth of about 1.50meters or more by using directional drilling unit equipped with automated pipe handling system (Horizontal Directional Drilling Machine), Using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone, Internet cables, Water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc. Taking the necessary drive pit for drilling & laying the cable, remove the excavated earth. The rate quoted for including the charge of GPR (Ground Penetrating radar ) Survey for identify the existing utility in the proposed bore path and including cost of making entry pit and exit pit for every 250 meters minimum intervals (Along the Road) | 285 | M3 | 9,69,000 ₹9,69,000 | 9,69,000 ₹9,69,000 | 9,69,000 ₹9,69,000 | 10,68,750 ₹10,68,750 | 10,31,985 ₹10,31,985 | 10,34,550 ₹10,34,550 | 10,26,000 ₹10,26,000 | 9,49,620 ₹9,49,620 Lowest | 9,97,500 ₹9,97,500 | 10,05,765 ₹10,05,765 |
| 3.00Dismantling the brickwork, PCC , RCC inside the cable trench and cable duct wherever occur of any thickness and clearing the trench/duct free from debris and without hinderence to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge. | |||||||||||||
| 3.01 | Dismantling BW in CM - 1cum | 1 | M3 | 312 ₹312 | 310 ₹310 | 312 ₹312 | 450 ₹450 | 332.3 ₹332.3 | 315 ₹315 | 1,000 ₹1,000 | 305.75 ₹305.75 Lowest | 500 ₹500 | 350 ₹350 |
| 3.02 | Dismantling PCC - 1cum | 2 | M3 | 1,070 ₹1,070 | 1,064 ₹1,064 | 1,070 ₹1,070 | 2,400 ₹2,400 | 1,139.5 ₹1,139.5 | 1,130 ₹1,130 | 4,000 ₹4,000 | 1,048 ₹1,048 Lowest | 4,000 ₹4,000 | 1,100 ₹1,100 |
| 3.03 | Dismantling RCC - 1cum | 2 | M3 | 11,850 ₹11,850 | 11,850 ₹11,850 | 11,850 ₹11,850 | 12,000 ₹12,000 | 12,620.3 ₹12,620.3 | 13,000 ₹13,000 | 8,000 ₹8,000 Lowest | 11,612 ₹11,612 | 10,000 ₹10,000 | 12,400 ₹12,400 |
| 4.00 | Providing M.S. barricading 1.5m Height Using M.S Sheet 4 mm thick MS Angle 50 x 50 x 8 mm Base Channel 100 x 50 and covering with green cloth for a height of 1.5m inclusive of all materials, leads, lifts,labour,welding and Erection , Transporting at site, Placing in position, Shifting to New Location after completing works, Tools, & Plants etc., Complete | 12 | CKTM | 2,976 ₹2,976 | 2,880 ₹2,880 | 3,000 ₹3,000 | 3,600 ₹3,600 | 3,195 ₹3,195 | 3,120 ₹3,120 | 2,400 ₹2,400 Lowest | 2,940 ₹2,940 | 3,000 ₹3,000 | 3,600 ₹3,600 |
| 5.00 | Laying plain cement concrete 1:3:6, using 20mm BG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper alignment and level as per std.specification including cost of all materials, labour, lead, lift etc., complete. | 4.2 | M3 | 32,739 ₹32,739 | 32,739 ₹32,739 | 33,390 ₹33,390 | 36,120 ₹36,120 | 35,560.35 ₹35,560.35 | 33,390 ₹33,390 | 25,200 ₹25,200 Lowest | 32,722.2 ₹32,722.2 | 37,800 ₹37,800 | 34,440 ₹34,440 |
| 6.00 | Transporting of 33 KV 3X400 sqmm Cable drums inlcuding cost of Loading at stores, unloading of 33KV cable drums each weighing approximately 7T in lorries using truck mounted crane for both loading andunloading including cost of labour required, etc.,(3 drums at a time) | 2 | Drum | 16,600 ₹16,600 | 16,540 ₹16,540 | 16,870 ₹16,870 | 18,800 ₹18,800 | 17,966.5 ₹17,966.5 | 17,000 ₹17,000 | 17,000 ₹17,000 | 16,532 ₹16,532 Lowest | 40,000 ₹40,000 | 34,000 ₹34,000 |
| 7.00 | Laying of 3x400 sq.mm 33KV XLPE UG cable by means of winch over rollers provided by contractor.The rate includes the cost of pulling the steel wire rope from winch side to drum side providing labour as required at site for tying the cable in trefoil formation with nylon rope/etc., complete. | 20 | CKTM | 2,000 ₹2,000 | 2,000 ₹2,000 | 2,000 ₹2,000 | 2,200 ₹2,200 | 2,130 ₹2,130 | 2,000 ₹2,000 | 2,200 ₹2,200 | 1,960 ₹1,960 Lowest | 4,000 ₹4,000 | 2,400 ₹2,400 |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
15 Jun 2026, 2:00 pmClosed
SE CDC TNPDCL
A10 Thiru Vi Ka Industrial Estate Guindy
Melur Ashokleyland cable laying works
2026_EB_678725_1
OTNo02/2026-27
Open Tender
Civil Works - Others
Works
90 days
A10 Thiru Vi Ka Industrial Estate Guindy
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,000
Yes
21 Jul 2026
30 May 2026
16 Jun 2026
30 May 2026
15 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all soils to a depth from 31cm to 135cm including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct including cost of signal boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, lead, lift, tools and plants etc., complete.The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic. | 13 | M3 | - | - |
| 2 | Drilling, Reaming & Laying of 33 KV Cable (3Nos). Using Trenchless Technology Method at a depth of about 1.50meters or more by using directional drilling unit equipped with automated pipe handling system (Horizontal Directional Drilling Machine), Using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone, Internet cables, Water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc. Taking the necessary drive pit for drilling & laying the cable, remove the excavated earth. The rate quoted for including the charge of GPR (Ground Penetrating radar ) Survey for identify the existing utility in the proposed bore path and including cost of making entry pit and exit pit for every 250 meters minimum intervals (Along the Road) | 285 | M3 | - | - |
| 3Dismantling the brickwork, PCC , RCC inside the cable trench and cable duct wherever occur of any thickness and clearing the trench/duct free from debris and without hinderence to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge. | |||||
| 3.01 | Dismantling BW in CM - 1cum | 1 | M3 | - | - |
| 3.02 | Dismantling PCC - 1cum | 2 | M3 | - | - |
| 3.03 | Dismantling RCC - 1cum | 2 | M3 | - | - |
| 4 | Providing M.S. barricading 1.5m Height Using M.S Sheet 4 mm thick MS Angle 50 x 50 x 8 mm Base Channel 100 x 50 and covering with green cloth for a height of 1.5m inclusive of all materials, leads, lifts,labour,welding and Erection , Transporting at site, Placing in position, Shifting to New Location after completing works, Tools, & Plants etc., Complete | 12 | CKTM | - | - |
| 5 | Laying plain cement concrete 1:3:6, using 20mm BG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper alignment and level as per std.specification including cost of all materials, labour, lead, lift etc., complete. | 4.2 | M3 | - | - |
| 6 | Transporting of 33 KV 3X400 sqmm Cable drums inlcuding cost of Loading at stores, unloading of 33KV cable drums each weighing approximately 7T in lorries using truck mounted crane for both loading andunloading including cost of labour required, etc.,(3 drums at a time) | 2 | Drum | - | - |
| 7 | Laying of 3x400 sq.mm 33KV XLPE UG cable by means of winch over rollers provided by contractor.The rate includes the cost of pulling the steel wire rope from winch side to drum side providing labour as required at site for tying the cable in trefoil formation with nylon rope/etc., complete. | 20 | CKTM | - | - |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
Tendernotice_2.pdf
PDF • 0.73 MB
BOQ_815516.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].