Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-As Per qualification statement |
Tender Value
₹16.0 L
EMD Value
₹32,080
Closing Date
24 Jun 2026, 11:00 amClosed
EE PWD DN Jaitaran
Jaitaran
Const. of Additional Room and Garrage in Exisiting Tyep III Residential Accommodation for Conversion into Tyeo II at Cj and JM Jaitaran
2026_CEPWD_568871_3
Jtn Nit No 04 2026-27
Open Tender
Civil Works
Percentage
90 days
JAITARAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EE PWD DN Jaitaran
₹32,080
Yes
24 Jun 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
17 Jun 2026 - 24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part "A" : Building Work
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: In cement mortar. | 5.44 | Cum | 641 | ₹3,487.04 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 1.41 | Cum | 930 | ₹1,311.3 |
| 3 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | 37.07 | Sqm | 80 | ₹2,965.6 |
| 4 | Dismantling doors, windows and clearstory windows steel or wood shutter including chowkhats and holdfasts etc. complete and stacking within 50 meters lead: Of area 3 square meter and below. | 2 | Nos | 105 | ₹210 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 103.67 | Cum | 175 | ₹18,142.25 |
| 6 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 9.42 | Cum | 3,302 | ₹31,104.84 |
| 7 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 32.97 | Cum | 2,838 | ₹93,568.86 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 42.75 | Cum | 64 | ₹2,736 |
| 9 | Supplying and Filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete including cost of sand. | 22.41 | Cum | 450 | ₹10,084.5 |
| 10 | Supplying and Filling in plinth with river sand under floors including watering ramming consolidating and dressing complete including cost of sand | 14.94 | Cum | 1,024 | ₹15,298.56 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
Jtnnit.pdf
Tender Documents • 1.79 MB
TENDERDOCUMENTS.pdf
Tender Documents • 16.29 MB
BOQ_1012262.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .