Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | -1.40% | ₹4.9 L | L1 | Admitted-Finance |
| 2 | L2₹4.9 L+₹2,960.27 (0.61%)Admitted-Finance | -0.80% | ₹4.9 L+₹2,960.27 (0.61%) | L2 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹49,000
Closing Date
28 May 2026, 5:00 pmClosed
Executive Engineer Minor Irrigation Div- Prayagraj
Executive Engineer Minor Irrigation Div- Prayagraj
CONSTRUCTION OF ROOF TOP RAIN WATER HARVESTING CLUSTER 34 DISTRICT KAUSHAMBI
2026_UPMID_1147228_34
120/M.I./AC./NIVIDA SUCHNA/2026-27 DATE 02-05-2026
Open Tender
Civil Works
Percentage
60 days
CONSTRUCTION OF ROOF TOP RAIN WATER HARVESTING
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineer Minor Irrigation Division
₹49,000
Yes
15 Sept 2026
13 May 2026
29 May 2026
15 May 2026
28 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete or brick or granolithic floor i/c base concrete and i/c dismantled material disperse in distance 60 m. | 51 | Sqm | 620 | ₹31,620 |
| 2 | E/W excavation for Boaring pit /reachargepit in ordinary soil l up to 1.5m and lead up to 50m.ift | 33.62 | Cum | 100 | ₹3,362 |
| 3 | C .C Cin 1:3:6 (cement : fine sand :40-mm B/B normal size ) and curing complete i/c cost of fromwork in foundation and floor. | 1.3 | Cum | 4,596 | ₹5,974.8 |
| 4 | Class M-150 B/W in 1:4 (cement and coarse sand) mortar in recharge pit and small chamber at 0.35 m thick wall. | 6.94 | Cum | 5,801 | ₹40,258.94 |
| 5 | 20 mm thick cement plaster in 1:4 with cement ,course sand mortar two coat 17mm and finished coat 3mm thick neat cement . | 47.86 | Sqm | 194.4 | ₹9,303.98 |
| 6 | R.C.C .work in 1:2:4 with cement , coarse sand and 20 mm stone ballast cover slab of reacharge pit , small chamber. | 12.64 | Cum | 6,989.5 | ₹88,347.28 |
| 7 | Mild steel or iron plain such as R.C.C .and R.B work | 1.78 | Qtl | 7,550 | ₹13,439 |
| 8 | Supply and laying 40mm B/B for filter meadia. | 0.64 | Cum | 1,855 | ₹1,187.2 |
| 9 | Supply and laying of bricks M-150 Flat soling (S.O.B.) | 3.18 | Sum | 428 | ₹1,361.04 |
| 10 | Supply and laying of Pea-gravel (2mm -4mm size ) in Reacharge pit. | 7.88 | Cum | 7,019 | ₹55,309.72 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.98 MB
BOQ_2146034.xls
BOQ • 0.32 MB
corrigendumRooftop.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .