Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.3 LAccepted-Finance | L1 | Accepted-Finance Overall L1 | |
| 2 | L2₹42.6 L+₹4.3 L (11.2%)Accepted-Finance | L2 | Accepted-Finance Overall L2 | |
| 3 | L3₹44.5 L+₹6.2 L (16.2%)Accepted-Finance MYOREPUR ANPARA ANPARA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | L3 | Accepted-Finance Overall L3 | |
| 4 | L4₹45.1 L+₹6.8 L (17.9%)Accepted-Finance GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | L4 | Accepted-Finance Overall L4 | |
| 5 | L5₹52.3 L+₹14.0 L (36.5%)Accepted-Finance QTR NO 111 JME COLONY TYPE II POST YOGICHAURA SHAKTINAGAR SONBHADRA UTTAR PRADESH 231222 | SONBHADRA | UTTAR PRADESH | 231222 | L5 | Accepted-Finance Overall L5 |
| Sl No | Description | Qty | Unit | M/S SHYAM ERECTORS L4 | M/S RANJANI CONSTRUCTION CO. L3 | M/S ALOK ENTERPRISES L6 | LARSON POWER ENGG CO L5 | Deen Dayal L7 | M/S B. B. S. CONSTRUCTION L1 | M/S THERMAL INDIA L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Part-1 (Part A ): | ||||||||||
| 1.01 | “Round ‘O’ clock Routine, preventive & Breakdown maintenance of Lighting, welding supply, Battery, Battery Charger & DCDB system of 2x 500 MW BTPS powerhouse area. | 24 | Month | 73,000 ₹17,52,000 | 61,000 ₹14,64,000 Lowest | 71,500 ₹17,16,000 | 80,500 ₹19,32,000 | 75,000 ₹18,00,000 | 68,148 ₹16,35,552 | 69,000 ₹16,56,000 |
| 2.00Part-1 (Part B: Breakdown maintenance .) | ||||||||||
| 2.01 | To provide uninterrupted supply of welding & lighting in boilers, turbine & other area during annual overhauling/long shutdown/short shutdown. | 60 | Day | 500 ₹30,000 Lowest | 900 ₹54,000 | 1,100 ₹66,000 | 995 ₹59,700 | 1,150 ₹69,000 | 748 ₹44,880 | 500 ₹30,000 Lowest |
| 3.00Part-2 (Part A) | ||||||||||
| 3.01 | Routine and preventive maintenance of all electrical items/parts of EOT cranes/Hoists of unit no.4 & 5 of BTPS, Anpara | 24 | Month | 31,500 ₹7,56,000 | 24,000 ₹5,76,000 | 32,500 ₹7,80,000 | 25,145 ₹6,03,480 | 33,000 ₹7,92,000 | 23,248 ₹5,57,952 Lowest | 28,000 ₹6,72,000 |
| 3.02 | Routine Maintenance of 02 No. DG set (2A & 2B) of 2X500MW, BTPS, Anpara. | 24 | Month | 23,500 ₹5,64,000 | 18,000 ₹4,32,000 | 22,000 ₹5,28,000 | 30,500 ₹7,32,000 | 22,100 ₹5,30,400 | 13,248 ₹3,17,952 Lowest | 23,500 ₹5,64,000 |
| 4.00Part-3 ( Part- A: Mechanical maintenance of Monorail, Electric Hoist of boiler, APH, ESP etc. of Unit No. 4&5, 2X500MW, BTPS, Anpara) | ||||||||||
| 4.01 | Routine and Preventive Maintenance of electric Hoist of APH, ESP, Economizer Maintenance Platform/Yard Boiler Unit No. 4&5, 2X500 MW, BTPS Anpara. | 750 | Job | 555 ₹4,16,250 | 505 ₹3,78,750 | 600 ₹4,50,000 | 445 ₹3,33,750 | 610 ₹4,57,500 | 348 ₹2,61,000 Lowest | 550 ₹4,12,500 |
| 5.00Part-3 ( Part- B : Preventive & Breakdown maintenance of Monorail, Electric Hoist of boiler, APH, ESP etc. of Unit No. 4&5, 2X500MW, BTPS, Anpara) | ||||||||||
Tender Value
₹56.0 L
EMD Value
₹1.1 L
Closing Date
22 Sept 2025, 5:00 pmClosed
SE, OMC-4, BTPS, Anpara
Office of SE, OMC-4, BTPS, Anpara
Misc. Electrical maintenance/preventive maintenance/ breakdown maintenance of battery and battery charger/ DCDB/lighting/street and service building lighting/EOT crane/Hoist and DG sets as per scope of work of 2x500MW, BTPS, Anpara
2025_RVUNL_1068559_1
W-ANP/B/OMC4/EMD1/6000008758
Open Tender
Electrical Works
Fixed-rate
730 days
Anpara
As per tender documents
2 documents required · 2 mandatory
₹1,180
Dy. CAO CFA and BO BTPS Anpara
₹1.1 L
1 Nov 2025
26 Aug 2025
23 Sept 2025
26 Aug 2025
22 Sept 2025
26 Aug 2025
Amount
Part-1 (Part A ):
“Round ‘O’ clock Routine, preventive & Breakdown maintenance of Lighting, welding supply, Battery, Battery Charger & DCDB system of 2x 500 MW BTPS powerhouse area.
Part-1 (Part B: Breakdown maintenance .)
To provide uninterrupted supply of welding & lighting in boilers, turbine & other area during annual overhauling/long shutdown/short shutdown.
Part-2 (Part A)
Routine and preventive maintenance of all electrical items/parts of EOT cranes/Hoists of unit no.4 & 5 of BTPS, Anpara
Routine Maintenance of 02 No. DG set (2A & 2B) of 2X500MW, BTPS, Anpara.
Part-3 ( Part- A: Mechanical maintenance of Monorail, Electric Hoist of boiler, APH, ESP etc. of Unit No. 4&5, 2X500MW, BTPS, Anpara)
Routine and Preventive Maintenance of electric Hoist of APH, ESP, Economizer Maintenance Platform/Yard Boiler Unit No. 4&5, 2X500 MW, BTPS Anpara.
Part-3 ( Part- B : Preventive & Breakdown maintenance of Monorail, Electric Hoist of boiler, APH, ESP etc. of Unit No. 4&5, 2X500MW, BTPS, Anpara)
Breakdown maintenance/Servicing of traverse motor gear box assy. of hoist of ESP of unit # 4&5.
Breakdown maintenance/Servicing of traverse motor gear box assy. of hoist 01 Ton of main boiler of unit # 4&5.
Breakdown maintenance/Servicing of traverse motor gear box assy. of hoist 10 Ton of Eco. Maintenance Platform of unit # 4&5.
Breakdown maintenance/Servicing of traverse motion Chain pulley system of hoist of APH of unit # 4&5.
Breakdown maintenance/Servicing of rotary motor gear box assy. of ESP of unit # 4&5.
Breakdown maintenance/Servicing of rotary motor gear box assy. of hoist of 01 Ton of main boiler of unit # 4&5.
Breakdown maintenance/Servicing of rotary motor gear box assy. of hoist 10 Ton of Eco. Maintenance Platform of unit # 4&5.
Breakdown maintenance/Servicing of rotary motor gear box assy. of hoist of APH of unit # 4&5.
Servicing of Hooks, Rope Pulley, Brake shoe of hoist of ESP of unit # 4&5.
Servicing of Hooks, Rope Pulley, Brake shoe of hoist of 01 Ton capacity of main boiler of unit # 4&5 of unit # 4&5.
Servicing of Hooks, Rope Pulley, Brake shoe of hoist of 10 Ton capacity of Eco. Maintenance Platform of unit # 4&5.
Servicing of Hooks, Rope Pulley, Brake shoe of hoist of APH of unit # 4&5.
Rectification/Replacement of wire rope of ESP of unit # 4&5.
Rectification/Replacement of wire rope of hoist of 01 Ton capacity of main boiler of unit # 4&5.
Rectification/Replacement of wire rope of hoist of 10 Ton capacity of Eco. Maintenance Platform of unit # 4&5.
Rectification/Replacement of wire rope of hoist of APH of unit # 4&5.
Smoothening of Swirling/Twisted rope of hoist of ESP of unit # 4&5.
Smothering of Swirling/Twisted rope of hoist of 01 Ton capacity of main boiler of unit # 4&5.
Smoothening of Swirling/Twisted rope of hoist of 10 Ton capacity of Eco. Maintenance Platform of unit # 4&5.
Smothering of Swirling/Twisted rope of hoist of APH of unit # 4&5.
Attending faults after Lowering and Lifting the hoist of 01 Ton capacity of main boiler in position from monorail/traveling beam of unit # 4&5.
Attending faults after Lowering and Lifting the hoist in position from monorail/traveling beam of ESP of unit # 4&5.
Attending faults after Lowering and Lifting the hoist of 10 Ton capacity of Eco. Maintenance Platform in position from monorail/traveling Beam of unit # 4&5.
Attending faults after Lowering and Lifting the hoist in position from monorail/traveling beam of APH of unit # 4&5.
Part-4 (Part A :Operation and Running / Preventive maintenance jobs of complete lighting system, except Main Plant BTPS, Anpara)
Operation and Running / Preventive maintenance jobs of complete lighting system, cleaning and installation of ceiling fans both indoor and outdoor in various building of BTPS area except Switch Yard, Transformer Yard, Main Power House Building, Control Rooms, Boiler, Ash Handling Plant, Coal Handling Plant, The work includes maintenance of normal and emergency AC/DC lighting circuit, welding points, ceiling fans/Air coolers points, Tube lights fittings street lights, area lights and associated fittings, light distribution and branch boards at Service Building, WTP, SWP House, Simulator Building, BTPS Stores, CA Lab, Canteen No. 1&2, & LT&HT Switchgear, Heavy Vehicle base, CW Pump House including Street Lights of BTPS, Anpara. ( As per scope of work)
Rewinding of Burnt Fan Coils
Overhauling of ceiling fans.
Supply and Replacement of Condenser
Supply and Replacement of ceiling fan bearings
Supply and Replacement of Call Bell (Buzzer type)
Supply and Replacement of Call Bell (Ding- Dong type)
Supply of 32 Amp ISI standard Switch-fuse Unit
Supply and replacement of 1.5mm2 single core cable for lighting. (Red & Black)
Supply and replacement of 5 Amp Switch of ISI standard
Supply and replacement of 5 Amp Socket of ISI standard
Supply and replacement of 15 Amp Switch of ISI standard
Supply and replacement of 15 Amp Socket of ISI standard
Supply and Installation of 15 Amp Switch & Socket board on 4”x8”
Supply and Installation of multipoint 5 Amp and 15 Amp Switch & Socket board on 8”x10”
Installation of new tube light fixture along with associated cabling.
Part-5 ( Part A:The works of Preventive maintenance, Overhauling & breakdown maintenance of electrically operated Hoist having Capacity 4 /15/20 ton of Ball mill area.)
Overhauling / breakdown work of electrically operated hoists of 4 ton capacity.
Overhauling / breakdown work of electrically operated hoists of 15/20 ton capacity.
Part-6 (Part A :EOT Crane operator work for TG Hall)
Monthly charges for 01 no. certified/trained EOT crane operator
OT charges crane operator.
M/S THERMAL INDIA (BID ID -5545243)
M/S RANJANI CONSTRUCTION CO. (BID ID -5544998)
M/S SHYAM ERECTORS (BID ID -5542497)
LARSON POWER ENGG CO (BID ID -5545421)
M/S ALOK ENTERPRISES (BID ID -5545445)
Deen Dayal (BID ID -5545149)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .