Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.5 LAdmitted-Finance | ₹48.5 L | L1 | Admitted-Finance |
| 2 | L2₹50.2 L+₹1.6 L (3.39%)Admitted-Finance | ₹50.2 L+₹1.6 L (3.39%) | L2 | Admitted-Finance |
| 3 | L3₹53.7 L+₹5.1 L (10.6%)Admitted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | ₹53.7 L+₹5.1 L (10.6%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Eligible for part 1 |
| 5 | Rejected-Technical 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | - | - | Rejected-Technical Not Eligible for part 1 |
| Sl No | Description | Qty | Unit | Hindustan Electric Work L2 | Hi-tech power transmission L3 | Deshraj Singh Construction & Company L1 |
|---|---|---|---|---|---|---|
| 1.00INCREASING CAPACITY OF 33/11 KV SUB STATION PITHIPUR FROM 5+10 MVA TO 10+2X5 MVA DISTT AMETHI Safe Loading, Carriage and then safe unloading of the following material from Store Centres Under the jurisdiction of EEESD Ayodhaya to dump site proper stacking. | ||||||
| 1.01 | 33 KV Bus Isolator | 1 | Set/No | 300 ₹300 Lowest | 5,000 ₹5,000 | 2,000 ₹2,000 |
| 1.02 | 33 KV Lightening Arrestor | 3 | No. | 80 ₹240 Lowest | 100 ₹300 | 500 ₹1,500 |
| 1.03 | 90 lbs rail Pcs for T/F ( 44.64 Kg/m) | 6.92 | Mts | 120 ₹830.4 Lowest | 2,000 ₹13,840 | 1,000 ₹6,920 |
| 1.04 | 33 KV VCB 800A, 750 MVA | 1 | No. | 5,000 ₹5,000 | 10,000 ₹10,000 | 3,000 ₹3,000 Lowest |
| 1.05 | Singe T/F control pannel | 1 | No. | 4,000 ₹4,000 | 5,000 ₹5,000 | 3,000 ₹3,000 Lowest |
| 1.06 | C.T. O/D 33 KV CTR 200/100/1-1A | 3 | No. | 4,000 ₹12,000 | 1,500 ₹4,500 | 1,000 ₹3,000 Lowest |
| 1.07 | 11 KV Incoming switch gear 600/300/5A, 350 MVA | 1 | No. | 3,000 ₹3,000 Lowest | 5,000 ₹5,000 | 3,000 ₹3,000 Lowest |
| 1.08 | 11 KV Out going switch gear 200/100/5A0250MVA | 2 | No. | 3,000 ₹6,000 Lowest | 5,000 ₹10,000 | 3,000 ₹6,000 Lowest |
| 1.09 | 11 KV 3 Core Cable 3x300 mm XLPE | 80 | Mtr | 15 ₹1,200 Lowest | 100 ₹8,000 | 20 ₹1,600 |
Tender Value
₹55.9 L
EMD Value
₹56,000
Closing Date
9 Jun 2026, 5:00 pmClosed
SE, EWC, Ayodhya
OFFICE OF THE S E EWC AYODHYA
09/SE/EWC/AYO/2026-27
2026_MVVNL_1153776_1
09/SE/EWC/AYO/2026-27
Open Tender
Electrical Works
Item Wise
90 days
AMETHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE, EWC, Ayodhya
₹56,000
18 Jun 2026
26 May 2026
10 Jun 2026
26 May 2026
9 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1INCREASING CAPACITY OF 33/11 KV SUB STATION PITHIPUR FROM 5+10 MVA TO 10+2X5 MVA DISTT AMETHI Safe Loading, Carriage and then safe unloading of the following material from Store Centres Under the jurisdiction of EEESD Ayodhaya to dump site proper stacking. | |||||
| 1.01 | 33 KV Bus Isolator | 1 | Set/No | 100 | ₹100 |
| 1.02 | 33 KV Lightening Arrestor | 3 | No. | 100 | ₹300 |
| 1.03 | 90 lbs rail Pcs for T/F ( 44.64 Kg/m) | 6.92 | Mts | 10 | ₹69.2 |
| 1.04 | 33 KV VCB 800A, 750 MVA | 1 | No. | 10 | ₹10 |
| 1.05 | Singe T/F control pannel | 1 | No. | 10 | ₹10 |
| 1.06 | C.T. O/D 33 KV CTR 200/100/1-1A | 3 | No. | 10 | ₹30 |
| 1.07 | 11 KV Incoming switch gear 600/300/5A, 350 MVA | 1 | No. | 10 | ₹10 |
| 1.08 | 11 KV Out going switch gear 200/100/5A0250MVA | 2 | No. | 10 | ₹20 |
| 1.09 | 11 KV 3 Core Cable 3x300 mm XLPE | 80 | Mtr | 10 | ₹800 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
TenderDocument09202627.pdf
Tender Documents • 0.85 MB
BOQ_2161385.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .