Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹7.3 L (4.79%)Admitted-Finance | ₹1.6 Cr+₹7.3 L (4.79%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹8.7 L (5.76%)Admitted-Finance | ₹1.6 Cr+₹8.7 L (5.76%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹40.5 L (26.7%)Admitted-Finance HIG 6152 LEVEL I AND II KAMARAJAR ROAD AYAPAKKAM TIRUVALLUR TAMIL NADU 600077 | THIRUVALLUR | TAMIL NADU | 600077 | ₹1.9 Cr+₹40.5 L (26.7%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Gemini Cooling Systems Projects Private Limited L2 | THARIQUE ELECTRICAL CONTRACTOR L3 | Pollucare Engineers India Pvt Ltd L4 | A.BASHKAR L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Round the Clock Shift Operation in Restricted area of KARP & KARP - II : Operation of various process circuits in High block of KARP & KARP-II i.e Pump operation, Liquid Transfers, Taking process samples , Formaldehyde pumping and other process related works in RTC for routine plant operation or as directed by Engineer-in-charge / Shift Charge Engineers of KARP & KARP -II. 2 operators each in KARP & KARP -II in three shifts per day plus 1 operator for O.T (13 operators/Day * 365 Days/Yr) Category - Skilled Assistant | 4,745 | No of operation | 1,645 ₹78,05,525 | 1,665 ₹79,00,425 | 1,955 ₹92,76,475 | 1,569 ₹74,44,905 Lowest |
| 2.00 | Restricted area - KARP & KARP II : Preparation & pumping of various chemicals,taking Samples, Uranous Area Operation including Electrolyser operation, DMW plant operation & Regeneration, Bulk Chemical storage tank pumping, Unloading of chemicals from tankers. Condensate recovery Unit operations such as operating Ion Exchange columns,pumps etc. HUT, Delay tank, WTF operation, Pumping and sampling etc. and all miscellaneous work related to plant operation in various area of KARP & KARP-II as per instruction of area in charge/ shift charge engineer or any departmental supervisor. 6 Operators in MUA-1 & 2 of KARP - II, 2 Operators in HUT area of KARP-II, 2 Operators in WTF of KARP, 3 operators in Condensate recovery area, 2 operators for KARP Operation. (15 operators/Day*313 days/Yr + OT on Sunday/holiday) Category - Skilled assistant | 5,215 | No of operation | 1,550 ₹80,83,250 | 1,560 ₹81,35,400 | 1,905 ₹99,34,575 | 1,480 ₹77,18,200 Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
12 Dec 2025, 3:00 pmClosed
GM,INRPK
INRPK,NRB,BARCF,KALPAKKAM
Providing Technical Assistance for Operation of KARP and KARP-II for the year 2025-26
2025_BARC_886704_1
BARCF/IN-OP/KA/TR/25/2025
Open Tender
Miscellaneous Works
Item Rate
365 days
INRPK/NRB/BARCF, Kalpakkam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹3.6 L
20 Jan 2026
26 Nov 2025
18 Dec 2025
27 Nov 2025
12 Dec 2025
3 Dec 2025
28 Nov 2025 - 2 Dec 2025
Round the Clock Shift Operation in Restricted area of KARP & KARP - II : Operation of various process circuits in High block of KARP & KARP-II i.e Pump operation, Liquid Transfers, Taking process samples , Formaldehyde pumping and other process related works in RTC for routine plant operation or as directed by Engineer-in-charge / Shift Charge Engineers of KARP & KARP -II. 2 operators each in KARP & KARP -II in three shifts per day plus 1 operator for O.T (13 operators/Day * 365 Days/Yr) Category - Skilled Assistant
Restricted area - KARP & KARP II : Preparation & pumping of various chemicals,taking Samples, Uranous Area Operation including Electrolyser operation, DMW plant operation & Regeneration, Bulk Chemical storage tank pumping, Unloading of chemicals from tankers. Condensate recovery Unit operations such as operating Ion Exchange columns,pumps etc. HUT, Delay tank, WTF operation, Pumping and sampling etc. and all miscellaneous work related to plant operation in various area of KARP & KARP-II as per instruction of area in charge/ shift charge engineer or any departmental supervisor. 6 Operators in MUA-1 & 2 of KARP - II, 2 Operators in HUT area of KARP-II, 2 Operators in WTF of KARP, 3 operators in Condensate recovery area, 2 operators for KARP Operation. (15 operators/Day*313 days/Yr + OT on Sunday/holiday) Category - Skilled assistant
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.24 MB
CPWD-GCC.pdf
Additional Documents • 1.46 MB
Tenderbook.pdf
Tender Documents • 2.52 MB
declarationbycontractor.pdf
Additional Documents • 0.38 MB
BOQ_932039.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .