Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr Quoted ₹1.6 Cr | L1 | Accepted-AOC The work has been awarded to L1 bidder |
| 2 | L2₹2.1 Cr+₹45.2 L (27.7%)Rejected-Finance 120 RAMAYAN KOSABADI DIST KORBA CHHATTISGARH 495677 | KORBA | CHHATTISGARH | 495677 | ₹2.1 Cr+₹45.2 L (27.7%) | L2 | Rejected-Finance Due to L2 bidder |
| 3 | Rejected-Technical AT SAMALEI VIHAR PANCHGACHHIA PO BARAIPAH | - | - | Rejected-Technical All confirmatory document not submitted |
| 4 | Rejected-Technical WARD NO 01 KORBA DARRI ROAD DARRI ROAD VILLAGE TOWN KORBA CITY KORBA KORBA CHHATTISGARH 495677 INDIA | KORBA | CHHATTISGARH | 495677 | - | - | Rejected-Technical All confirmatory document not submitted |
Tender Value
₹2.3 Cr
EMD Value
₹2.9 L
Closing Date
9 Nov 2023, 5:00 pmClosed
General Manager (Civil), SECL, Gevra Area
Office of the General Manager (Civil) , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)
Dust suppression by truck mounted tankers(Minimum 9/12/15/18 KL capacity) on coal transportation road at west section and road towards lower kusmunda patch via WB no. 5 at Gevra Project of Gevra area.
2023_SECL_291949_1
SECL/GA/GM(C)/ETN/23-24/91 Dt 23.10.2023
Open Tender
Civil Works - Others
Item Rate
180 days
Gevra Area
As per NIT
5 documents required · 5 mandatory
₹2.9 L
8 Dec 2023
24 Oct 2023
11 Nov 2023
24 Oct 2023
9 Nov 2023
25 Oct 2023
24 Oct 2023 - 2 Nov 2023
Amount
Item Description/ Heading
Dust suppression of road surface using 9/12/15/18 KL capacity tankers to keep the road surface property wet including hiring charges of tankers, all tools and plants, payment of drivers, cost of POL etc, all completed as per instruction of EIC as detailed below in all 03(three) shifts. For part A (180 days). (1st shift - 3 time, 2nd shift- 3 time, 3rd shift- 1 time, Total 7 times.) NOTE: 1. Minimum 08 nos. tankers of 9/12/15/18 KL or equivalent capacity each required to be engaged for 180 days. Addionally 02 no. standby tanker has to be provided by agency during full claim period. 2. Bidder are required to quote their rate as per scope of work enclosed in NIT. 3. Tankers shall be allowed to be deployed after checking the road worthinesss by E&M department. 4.The tankers shall be fitted with GPS and the record of GPS is to be submitted for the bill prepration & payment. 5.Water shall be made available from any of the water filling points in mine areas and no additional claims on account of this shall be allowed. 6. The agency has to visit the site and get acquainted with the route and various water filling points of mine before quoting their bids. 7. the tentative route of work is from suraksha chowk to end of LKSM face road.
Total impact of GST for the purpose of CTC
VERITY INDIA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .