| 1.00Construction of Anganwadi Building at Thiruvaimoor in Thiruvaimoor Panchayat. | |||||
| 2.00 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with inital leads and lifts, etc. Including leveling the sites complete complying with standard specifications and as directed. In sand or other loose soil, wet sand not under water, silt, light black cotton soil, sandy loams and ordinary soil. TNBP SS NO 20B 23 & 24 . | 49.8 | M3 | 263.7 ₹13,132.26 Lowest | 267.66 ₹13,329.47 |
| 3.00 | Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification. TNBP SS NO 24 & 25 | 5.6 | M3 | 2,779.5 ₹15,509.61 Lowest | 2,821.19 ₹15,742.24 |
| 4.00 | Refilling the escavated earth in layers including all labours charages etc, complete. | 15.2 | M3 | 45.85 ₹696.92 Lowest | 46.54 ₹707.41 |
| 5.00 | Cement concrete 1:4:8 mix (one cement four sand and Eight hard broken stone) using 40mm ISSHBG metal for foundation, flooring and rendering the top rough to take floor finish including watering wherever necessary and laid in layers not more than 15cm thick compacting etc. Complete complying with standard specification and as direceted TNBP SS NO. 28 | 11.2 | M3 | 6,789 ₹76,036.8 Lowest | 6,890.84 ₹77,177.41 |
| 6.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Upto basement | 9.2 | M3 | 10,520.5 ₹96,683.4 Lowest | 10,678.31 ₹98,133.67 |
| 7.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement | 11.6 | M3 | 10,661.75 ₹1,23,569.68 Lowest | 10,821.68 ₹1,25,423.27 |
| 8.00 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement | 15.3 | M3 | 6,341.6 ₹96,899.65 Lowest | 6,436.72 ₹98,353.08 |
| 9.00 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstruture. | 23.5 | M3 | 6,434.5 ₹1,51,210.75 Lowest | 6,531.02 ₹1,53,478.97 |
| 10.00 | Supplying and applying of two coats of Putty of 3mm thic over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be throughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. IT shall then be sand papered (water Proof abrasive sheet) to give a smooth and evern surface. Any unevenness shall be made good by applying 1st coat of Putty mixed with water on the entire surface including filling up the undulations and applying 2 coat of putty after 6 hours of 1 St coat of Putty and then sand papering (water proof abrasive sheet) the same after it is dry and finishing the surface Smoothly etc., complete complaying with standard specifications and as directed by the Departmental officers. (The rates are inclusing of hire charges for grinding machine with wheel, cost of sand paper (water proof abrasive sheet), cost of putty, scrapping the putty area to level the surface smooth etc., complete). The Putty, Scrapping the Putty area to level the surface smooth etc., complete). The Putty should be got approved by the executive engineer before use on work. (Based on SoR 2024-25) | 70 | M2 | 308.85 ₹21,619.5 Lowest | 313.48 ₹21,943.6 |
Tender Value
₹17.3 L
EMD Value
₹17,250
Closing Date
19 Feb 2026, 5:00 pmClosed
The Block Development Officer, Keelaiyur
The Block Development Office, Keelaiyur
Construction of Anganwadi Building at Thiruvaimoor in Thiruvaimoor Panchayat
2026_RDTN_659288_1
3637/2025/A2
Open Tender
Civil Works
Item Rate
Keelaiyur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,250
3 Mar 2026
17 Feb 2026
19 Feb 2026
17 Feb 2026
19 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Anganwadi Building at Thiruvaimoor in Thiruvaimoor Panchayat. | - | - | - | - |
| 2 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with inital leads and lifts, etc. Including leveling the sites complete complying with standard specifications and as directed. In sand or other loose soil, wet sand not under water, silt, light black cotton soil, sandy loams and ordinary soil. TNBP SS NO 20B 23 & 24 . | 49.8 | M3 | - | - |
| 3 | Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification. TNBP SS NO 24 & 25 | 5.6 | M3 | - | - |
| 4 | Refilling the escavated earth in layers including all labours charages etc, complete. | 15.2 | M3 | - | - |
| 5 | Cement concrete 1:4:8 mix (one cement four sand and Eight hard broken stone) using 40mm ISSHBG metal for foundation, flooring and rendering the top rough to take floor finish including watering wherever necessary and laid in layers not more than 15cm thick compacting etc. Complete complying with standard specification and as direceted TNBP SS NO. 28 | 11.2 | M3 | - | - |
| 6 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Upto basement | 9.2 | M3 | - | - |
| 7 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement | 11.6 | M3 | - | - |
| 8 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement | 15.3 | M3 | - | - |
| 9 | Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstruture. | 23.5 | M3 | - | - |
| 10 | Supplying and applying of two coats of Putty of 3mm thic over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be throughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. IT shall then be sand papered (water Proof abrasive sheet) to give a smooth and evern surface. Any unevenness shall be made good by applying 1st coat of Putty mixed with water on the entire surface including filling up the undulations and applying 2 coat of putty after 6 hours of 1 St coat of Putty and then sand papering (water proof abrasive sheet) the same after it is dry and finishing the surface Smoothly etc., complete complaying with standard specifications and as directed by the Departmental officers. (The rates are inclusing of hire charges for grinding machine with wheel, cost of sand paper (water proof abrasive sheet), cost of putty, scrapping the putty area to level the surface smooth etc., complete). The Putty, Scrapping the Putty area to level the surface smooth etc., complete). The Putty should be got approved by the executive engineer before use on work. (Based on SoR 2024-25) | 70 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_791009.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .