Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
12 Oct 2026, 6:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
XEN REW JAMMU
XEN REW JAMMU
Constt of Protection work near H/o Bittu W.No. 6,pyt Bhalwal Lower,Block Bhalwal, Under Capex Budget PRIs Grants for FY 2026-27 (BLOCK LEVEL)
2026_RDPR_327047_14
e-NIT No.673 REWJ of 2026-27 dated 03-10-2026 (2nd Call)
Open Tender
Civil Works
Percentage
45 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹3,880
5 Oct 2026
5 Oct 2026
13 Oct 2026
5 Oct 2026
12 Oct 2026
5 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 0.96 | cum | 2,516 | ₹2,415.36 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:AKS. | 16.93 | cum | 256.85 | ₹4,348.47 |
| 3 | Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work Upto plinth level (1:5:10) 1 cement:5 coarse sand:10 graded stone aggreagate 40mm nominal size (crusher) | 2.63 | cum | 4,826.5 | ₹12,693.7 |
| 4 | Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work Upto plinth level (1:3:6) 1 cement:3 coarse sand:6 graded stone aggreagate 20mm nominal size (crusher) | 18.14 | cum | 5,733.6 | ₹1,04,007.5 |
| 5 | Supply and Dumping of Stone boulder | 4.54 | cum | 937.7 | ₹4,257.16 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto Plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.96 | cum | 7,788.4 | ₹7,476.86 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 86.02 | kg | 123.2 | ₹10,597.66 |
| 8 | Centring and shuttering including strutting, propping etc and removal of form for. for mass concrete foundations | 96.32 | sqm | 286.35 | ₹27,581.23 |
| 9 | Suspended floors, roofs, landings, balconies and access platforms. | 2.09 | sqm | 718.2 | ₹1,501.04 |
| 10 | Edges of slabs and breaks in floors and walls Under 20 cm wide | 23.78 | RM | 262.2 | ₹6,235.12 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1106344.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .