| 1 | L1₹19.3 CrAccepted-Finance 142 | L1 | Accepted-Finance L1 | |
| 2 | L2₹21.1 Cr+₹1.8 Cr (9.17%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/S SHIV SHAKTI CONSTRUCTION L1 | M/s Kaiser Construction Engineers and Contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. per Cum. | 1,66,445.74 | Cum | 50 ₹83,22,287 Lowest | 60 ₹99,86,744.4 |
| 2.00 | Earth Work in filling for making Canal Section from earth borrowed from Private Land with lead upto 1.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. per Cum. | 4,33,029.84 | Cum | 170 ₹7,36,15,072.8 Lowest | 185 ₹8,01,10,520.4 |
| 3.00 | Dewatering with all cost of power P.O.L., machines, pumps ,well.point system & operater etc with assembling and dismantling of equipments etc. required for completion of works. | 12,500 | Kwh | 40 ₹5,00,000 Lowest | 50 ₹6,25,000 |
| 4.00 | Preparation of Subgrade required for proper completion of work including cost of all materials, labour, T&P etc. | 14,110.87 | Sqm | 4 ₹56,443.48 Lowest | 10 ₹1,41,108.7 |
| 5.00 | Earth Work in excavation of foundation in all types of soil including lead upto 30.00 m and lift up to 1.50 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30.00 m from the foundation trenches including cost of all labour, T&P etc. | 49,203.88 | Cum | 60 ₹29,52,232.8 Lowest | 60 ₹29,52,232.8 Lowest |
| 6.00 | Centering & shuttering for R.C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc. | 30,203.76 | Sqm | 320 ₹96,65,203.2 Lowest | 500 ₹1,51,01,880 |
| 7.00 | Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc. | 1,599.49 | Sqm | 300 ₹4,79,847 | 250 ₹3,99,872.5 Lowest |
| 8.00 | Filling/Laying Coarse sand as a filter material below lining required for proper completion of work including cost of all materials, labour, T&P etc. | 3,733.7 | Cum | 900 ₹33,60,330 Lowest | 1,500 ₹56,00,550 |
| 9.00 | Laying stone grit 10-20 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc. | 18.66 | Cum | 900 ₹16,794 Lowest | 2,100 ₹39,186 |
| 10.00 | Supply & laying of stone grit 20-40 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc. | 18.66 | Cum | 900 ₹16,794 Lowest | 2,100 ₹39,186 |
Tender Value
₹24.9 Cr
EMD Value
₹49.8 L
Closing Date
18 Feb 2026, 2:00 pmClosed
SE, KBLCCC, BANDA
Office of The Superintending Engineer, Ken-Betwa Link Canal Construction Circle, Banda, Address-Nawab Tank, Banda-210001
Restoration of Dys and Minors offtaking from km. 0.000 to km. 21.000 of Atarra Branch in Ken Canal System under Ken-Betwa Link Project
2026_UPIDC_1104143_2
04/SE/2025-26
Open Tender
Civil Works - Canal
Item Rate
547 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹49.8 L
Office of The Superintending Engineer
16 Mar 2026
6 Jan 2026
18 Feb 2026
6 Jan 2026
18 Feb 2026
6 Jan 2026
16 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. per Cum. | 1,66,445.74 | Cum | - | - |
| 2 | Earth Work in filling for making Canal Section from earth borrowed from Private Land with lead upto 1.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. per Cum. | 4,33,029.84 | Cum | - | - |
| 3 | Dewatering with all cost of power P.O.L., machines, pumps ,well.point system & operater etc with assembling and dismantling of equipments etc. required for completion of works. | 12,500 | Kwh | - | - |
| 4 | Preparation of Subgrade required for proper completion of work including cost of all materials, labour, T&P etc. | 14,110.87 | Sqm | - | - |
| 5 | Earth Work in excavation of foundation in all types of soil including lead upto 30.00 m and lift up to 1.50 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30.00 m from the foundation trenches including cost of all labour, T&P etc. | 49,203.88 | Cum | - | - |
| 6 | Centering & shuttering for R.C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc. | 30,203.76 | Sqm | - | - |
| 7 | Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc. | 1,599.49 | Sqm | - | - |
| 8 | Filling/Laying Coarse sand as a filter material below lining required for proper completion of work including cost of all materials, labour, T&P etc. | 3,733.7 | Cum | - | - |
| 9 | Laying stone grit 10-20 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc. | 18.66 | Cum | - | - |
| 10 | Supply & laying of stone grit 20-40 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc. | 18.66 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
T04L02-ScheduleA.xls
Tender Documents • 0.28 MB
BOQ_2036608.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .