Loading…
Loading…
Tender Value
₹84.8 L
EMD Value
₹1.7 L
Closing Date
15 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
+ Capital Works)
Above/Below/Par
SDSTE/ALJN
17 conditions · 6 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. ( Click here to download Format)
Balance sheet for the 4th previous year (i.e. FY 2022-23 or as applicable for the instance tender) as per para 10.2 of GCC-2022 shall be considered in evaluation of financial eligibility criteria only when it is clearly certified in Annex- VI B or a self declared certificate duly signed by chartered accountant and the tenderer that the balance sheet of last financial year (i.e. FY 2025-26 or as applicable for the instance tender) has not been audited/yet to be prepared. ( Click here to download Format)
Bidder has to upload requisite information as per Annexure V(A) along with the offer.
10.1 Technical Eligibility Criteria: (a)The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (i)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(i): Separate completed works of minimum required values for each component shall also be considered for fulfilment of technical eligibility criteria. (b) (ii) In such cases, what constitutes a component in a composite work shall be clearly predefined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (iii) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 (a) (ii) of Part-II of GCC or through subcontractor fulfilling the requirements as per clause 7 of Part-II of GCC or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing However, if required in tender documents by way of Special Conditions, a formal agreement duly notarized, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of Part-II of GCC, with prior approval of Chief Engineer in writing.
Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components.(b)(2)In such cases, what constitutes a component in a composite work shall be clearly predefined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility,shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarized, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletter, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the rquirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Definition of similar work:-"Any Signalling or Telecom Work".
43 conditions · 5 needing a document upload
Stamp Duty fee for Bank Guarantee (for bid security) should be paid which should be 0.5% of the Bid security or Rs.10,000/-, whichever is less or as per latest/revised state policy of UP state.
The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) /registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Apostille certificate.(Note:In case of non-submission of above documents, offer may be summarily rejected)
The tenderer will give full information ( in annexure-A) as to the date of retirement of such Engineer or gazetted officer from the said service and as to whether permission for taking such contract, or if the Contractor be a partnership firm or an incorporated company, to become a partner or director as the case may be, has been obtained by the tenderer or the Engineer or officer, as the case may be from the President of India or any officer, duly authorized by him in this behalf, shall be clearly stated in writing at the time of submitting the tender,if a tenderer is - i) be a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, whether in the executive or administrative capacity or whether holding a pensionable post or not, in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, OR ii) being partnership firm / joint venture (JV) / registered society / registered trust etc have as one of its partners/members a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, OR iii) being an incorporated company have any such retired Engineer of the gazetted rank or any other gazetted officer working before his retirement as one of its directors AND in case where such Engineer or officer had not retired from government service at least 1 year prior to the date of submission of the tender
If a tenderer or Contractor being an individual, have member(s) of his family or in the case of partnership firm/ company / joint venture (JV) / registered society / registered trust etc. one or more of his partner(s)/shareholder(s) or member(s) of the family of partner(s)/shareholder(s) having share of more than 1% in the tendering entity employed in gazetted capacity in the Engineering or any other department of the railway, then the tenderer at the time of submission of tender, will inform the authority inviting tenders the details of such persons. ( in annexure-A)
An undertaking shall be submitted by sole proprietorship firm, HUF, JV, LLP, Company registered under companies Act 2013 that he/they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of opening of bids, either in their individual capacity or in any firm in which they were / are partners. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract.(Note: Each member must sign separately in case of JV/Partnership firm/LLP.).(Note: IN case of non submission of above documents, offer may be summarily rejected).
In case of partnership firm an undertaking shall be submitted by all partners of the partnership firm that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm in which they were / are partners. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. (Note: In case of non-submission of above documents, offer may be summarily rejected)
Please submit your bank details i.e.Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, and PAN Number.
Please furnish list of plant and Machinery available on hand own and proposed to be inducted own and hired to be given separately for the subject work.
Please furnish list of Works on hand indicating Description of Work, Contract Value, Approximate value of balance work yet to be done and Date of award.
Please furnish list of personal, organization available on hand and proposed to be engaged for the subject work.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Whether the cost of tender form is submitted in hard copy if uploaded as a scanned copy in website.
Whether the cost of Bid Security is submitted in hard copy if uploaded as a scanned copy in website.
16.(1) Security Deposit: The Security Deposit shall be 5% of the contract value. The Bid Security submitted by the Contractor with his tender will be retained/encashed by the Railways as part of security for the due and faithful fulfilment of the contract by the Contractor. Provided further that, if Contractor submits the Cash or Term Deposit Receipt issued from a Scheduled commercial bank of India or irrevocable Bank Guarantee Bond from a Scheduled commercial bank of India, either towards the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security, to the Contractor. Balance of Security Deposit may be deposited by the Contractor in cash or Term Deposit Receipt issued from Scheduled commercial bank of India or irrevocable Bank Guarantee bond issued from Scheduled commercial bank of India, or may be recovered at the rate of 6% of the bill amount till the full Security Deposit is recovered. Provided also that in case of defaulting Contractor, the Railway may retain any amount due for payment to the Contractor on the pending "on account bills" so that the amounts so retained (including amount guaranteed through Performance Guarantee) may not exceed 10% of the total value of the contract. The Irrevocable Bank Guarantee submitted towards Security deposit shall be initially valid up to the stipulated date of Maintenance period plus 60 days and shall be extended from time to time, depending upon extension of contract granted in terms of Clause 17A and 17B of the Standard General Conditions of Contract. Note: Security Deposit deposited in cash by the Contractor or recovered from the running bills of a Contractor or submitted by contractor as Term Deposit Receipt(s) can be refunded/returned to the contractor, in lieu of irrevocable Bank Guarantee bond issued from scheduled commercial bank of India, to be submitted by him, for an amount equal to or more than the already available Security Deposit, provided however that, in a contract of value less than Rs. 50 Crore, such refund/ return of the already available Security Deposit is permitted up to two times and in a contract of value equal to or more than Rs. 50 Crore, such refund / return of the already available Security Deposit is permitted up to three times.
16.(4) Performance Guarantee:- The procedure for obtaining Performance Guarantee is outlined below: (a)The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty-one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty-one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty- one) days, i.e. from 22ndday after the date of issue of LOA. Further, if the 60thday happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work.
(b)The successful bidder shall submit the Performance Guarantee (PG) amounting to 5% of the original contract value and additional Performance Guarantee as per clause 16(4)(h) in the following forms: - (i)A deposit of Cash; (ii)Irrevocable Bank Guarantee; (iii) Insurance Surety Bond as per Annexure-XVII Note:- In case of extension of Date of Completion Selected bidder needs to submit extended insurance surety Bond/Fresh Insurance surety bond/fresh/fresh Performance security in any from as given above before expiry of existing insurance surety bond. (iv)Government Securities including State Loan Bonds at 5% below the market value; (v)Pay Orders and Demand Drafts tendered by any Scheduled Commercial Bank of India; (vi)Guarantee Bonds executed or Deposits Receipts tendered by any Scheduled Commercial Bank of India; (vii)Deposit in the Post Office Saving Bank; (viii)Deposit in the National Savings Certificates; (ix)Twelve years National Defence Certificates; (x)Ten years Defence Deposits; (xi) National Defence Bonds and (xii) Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also, FDR in favour of FA&CAO (free from any encumbrance) may be accepted. (c)The Performance Guarantee shall be submitted by the successful bidder after the Letter of Acceptance (LOA) has been issued, but before signing of the contract agreement. This P.G. shall be initially valid upto the stipulated date of completion plus 60 days beyond that. In case, the time for completion of work gets extended, the Contractor shall get the validity of P.G. extended to cover such extended time for completion of work plus 60 days. (d)The value of PG to be submitted by the Contractor is based on original contract value and shall not change due to subsequent variation(s) in the original contract value. (e)The Performance Guarantee (PG) shall be released after physical completion of the work based on 'Completion Certificate' issued by the competent authority stating that the Contractor has completed the work in all respects satisfactorily. (f)Whenever the contract is rescinded, the Performance Guarantee already submitted for the contract shall be encashed. (g)The Engineer shall not make a claim under the Performance Guarantee except for amounts to which the President of India is entitled under the contract (not withstanding and/or without prejudice to any other provisions in the contract agreement) in the event of: (i)Failure by the Contractor to extend the validity of the Performance Guarantee as described herein above, in which event the Engineer may claim the full amount of the Performance Guarantee. (ii)Failure by the Contractor to pay President of India any amount due, either as agreed by the Contractor or determined under any of the Clauses/Conditions of the Agreement, within 30 days of the service of notice to this effect by Engineer. (iii)The Contract being determined or rescinded under clause 62 of these conditions. (h)If a tender is accepted on the quoted rates of Bidder which is below the advertised tender value, and additional performance security shall be submitted by bidder as below:- (i) If Bid quoted below 0-5% (inclusive) than additional performance guarantee in % is Nil. (ii) If Bid quoted below 5% than additional performance guarantee in % is 5%.
All Rules of NIT & Post LOA shall be governed by GCC & tenderer agree to adhere to it without any dispute.
Old GCC has been changed and replaced with new General Conditions of Contract-2022, which has been added in tender document. Please go through this new General Condition of Contract-2022 along with all advanced correction slips before bidding. In case of any discrepancy, contradiction with regard to GCC (except special condition of contract) in that case GCC- 2022 will be applicable.
Balance sheet for the 4th previous year (i.e. FY 2022-23 or as applicable for the instance tender) as per para 10.2 of GCC-2022 shall be considered in evaluation of financial eligibility criteria only when it is clearly certified in Annex- VI B or a self declared certificate duly signed by chartered accountant and the tenderer that the balance sheet of last financial year (i.e. FY 2025-26 or as applicable for the instance tender) has not been audited/yet to be prepared.
S&T work for provision of shifting of Electronic Interlocking equipment from Khurja ASM old building to Khurja ASM new building and S&T work for Extension of platform No. 1 to at Aligarh station.
PRYJ-Sig-407-2026-27~NCR
PRYJ-Sig-407-2026-27
Open
Works - General
12 Months
Prayagraj, Uttar Pradesh
₹0
₹1.7 L
21 Aug 2026
21 Aug 2026
1 Sept 2026
255 items across 4 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 37,58,106.99 | ||
| — | 1.00 | — | — | ||
| Supply of permanently lubricated HDPE duct, 40 mm outer dia, as per RDSO spec. No. RDSO/SPN/TC/45/2013 Rev.2 Amndt.2 or latest, along with all accessories like end caps, collars, bends, couplers etc. (Insp. By Consignee) | — | — | — | 79,379.44 | |
| — | 1.00 | — | — | ||
| Laying of HDPE duct as per the approved cable route plan in the excavated trenches/other protected works/RCC channel etc. including all accessories like end caps, collars, bends, couplers etc. The ends of the duct to be sealed with end plugs till OFC blowing is done. Important: The laying of OFC cable independently or along with Quad cable/PIJF cable in the same trench shall be governed by the RDSO drawings no. RDSO/TCDO/COP-6(a) and RDSO/TCDO/COP-8 (a) respectively, issued vide Chapter-XIII of the Telecomm Manual. (Insp. By Consignee) | — | — | — | 7,865.64 | |
| — | 3.00 | — | — | ||
| Supply of basic material to construct unit maintenance free earth as per RDSO Specs. No. RDSO/SPN/197 Ver. 1.0 or latest to achieve a resistance less than 1 ohm. It consist of following: (a) Copper bonded steel electrode of minimum 3.0 meter long, minimum 17.0 mm dia with copper bonding thickness of minimum 250 microns and UL listed and marked = 1 No. (b) Earth enhancement material supplied in sealed bags of minimum 10 kg = 3 Nos. (c) Copper strip of 150x25x6 mm, to terminate earth rod = 1 No. (d) Copper strip of 300x25x6 mm (MEEB) = 1 No. (e) Copper strip of 150x25x6mm (SEEB) = 1 No. (ii) Supply of 35 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting main earth electrode to MEEB in the equipment room in duplicate.(minimum 10 meter.) (iii) Supply of 16 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting MEEB to SEEB and SPD to MEEB (minimum 10 meter. ) (iv) Supply of 10 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting various equipments to SEEB (v) Supply of copper lug sleeve for 3/16 cable. (Insp. By RDSO) | — | — | — | 54,127.56 | |
| — | 2.00 | — | — | ||
| Installation of Unit Maintenance Free Earth to achieve a resistance less than 1 ohm as supplied under item no. 13002 of Chapter 13 of SOR. It includes (i) Digging the earth to the required depth. (ii) Insertion of electrode. (iii) Filling of earth enhancing compound (Approx.30 Kg) (iv) Provision of exothermic weld connections to copper tape of 25 mm x 6 mm x 150 mm to the earth electrodes. All material tools and features required for weld will be arranged by contractor. (v) Th is also includes CC cover 1.5 ft x 1.5 ft . 1 ft wall thickness 2 inch with cover 3 inch thickness. Cables 35 Sq mm/ 16 Sq mm/10 sq mm for connecting earth to busbar, busbar to busbar and busbars to various equipments. Earth electrode of 17.20 mm dia and 3.00 meter long high tensile low carbon steel circular rods molecularly bonded with copper and outer surface (minimum copper bonding thickness of 250 micrones to made requirement of under writer's laboratories (UL) 467-2007 or latest. Copper strips of 150 mm x 25 mm x 6 mm to be welded with each earth electrode, copper strips of 300 mm x 25 mm x 6 mm for main equip-potential busbar, copper strips of 150 mm x 25 mm x 6 mm sub equip-potential busbar in relay room, power room and panel room. GI strip 25 mm x 2 mm for ring formation of earth pits Earth enhancement material in bags for each Earth Electrode. Inspection chamber of site 300 mm x 300 mm x 300 mm (Inside dimension) of approximate 50 mm thick with pulling hooks to cover the earth pits. Note: Th e installation of this item shall be carried out by the contractor as per RDSO Specn. No. RDSO/SPN/ 197 Ver 1.0 or latest. Typical RDSO approved drawings referred in the RDSO specifi cation document are : (i) SDO/RDSO/ E&B/001 for typical installation of Earth, (ii) SDO/RDSO/E&B/002 for typical bondong and earthing connections, (iii) SDO/RDSO/E&B/003 for typical arrangement for earth resistance measurements. (Insp. By Consignee) | — | — | — | 14,386.34 | |
| — | 2000.00 | — | — | ||
| Supply of 16/0.2 mm (0.5 sq mm) PVC insulated multi strand, single core, tinned copper conductor, as per RDSO Specn.No.IRS:S-76/89 (Amnd-3) or latest. Each coil should be of 100/200/500 meters length. Colour of the wire will be specified by the Engineer incharge. (Insp. By Consignee) | — | — | — | 21,500 | |
| — | 500.00 | — | — | ||
| Supply of 1 x 6 Sq mm(Red/Black/Green) multi strand copperpower wire , 85 conductor each dia 0.30+/- 0.01 with insulation thickness of 0.8mm and nominal conductor resistance of3.3 ohms/km and test parameters as perRDSO Specn.No.IRS:S-76/89 (Amnd.3)or latest.Colour of the wire will bespecified by the Engineer incharge. (Insp. By Consignee) | — | — | — | 24,000 | |
| — | 300.00 | — | — | ||
| Supply of 1 x 10 Sqmm(Red/Black/Green) multi strand copperpower wire, 101 conductor each dia 0.45+/- 0.01 with insulation thickness of 1.2mm and nominal conductor resistance of1.127 ohms/km and test parameters asper RDSO Specn.No.IRS:S-76/89(Amnd.3) or latest.Colour of thewire which is required will be specified bythe Engineer incharge. (Insp. By Consignee) | — | — | — | 39,738 | |
| — | 300.00 | — | — | ||
| Supply of 1 x 16 Sqmm(Red/Black/Green) multi strand copperpower wire as per IS: 2465/1984 andIS:694:2010 or latest, 101 conductoreach dia 0.45 +/- 0.01 with insulationthickness of 1.2 mm and nominalconductor resistance of 1.127 ohms/kmand test parameters as per RDSOSpecn.No.IRS:S-76/89(Amnd.3) orlatest.Colour of the wire which is requiredwill be specifiedby by the Engineer incharge. (Insp. By Consignee) | — | — | — | 44,361 | |
| — | 200.00 | — | — | ||
| Supply of 1 x 25 Sqmm(Red/Black/Green) multi strand copperpower wire, Colour of the wire which isrequired will be specified by the Engineerincharge. (Insp. By Consignee) | — | — | — | 81,750 | |
| — | 800.00 | — | — | ||
| Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. wide at bottom as per RDSO sketch No. SDO/CABLE LAYING/003, issued vide RDSO document no. RDSO/SI/G/2010 Version 1.1 dated 04.02.2014 or latest, alongside the track in Rocky soil, conforming to distances as per cable route plan and refilling and ramming of loose soil. This work includes clearing of route from bushes etc., covering of cable laid in trench y loose soil for a layer of 50mm thickness approximately. The work shall be done as per the extant practice on North Central Railway and instructions of Railway Engineer at site. In case 1.2 m depth of trench is not achievable due to site conditions, specific approval of JAG/SG Officer will be required for each site where trench depth of 1.2m is not possible, only after approval of JAG/SG Officer proportionate payment can be done. (Insp. By Consignee) | — | — | — | 71,344 | |
| — | 250.00 | — | — | ||
| Horizontal Boring/Manual moling without damage to surface road /track for laying/insertion of DWC/GI/HDPE pipe. The bore shall be done at the depth of minimum 1400 mm from the ground level. The ground level shall be considered ignoring the bank height of the bank of the road. Note: - DWC/HDPE/GI Pipe Supply is not covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after DWC/HDPE/GI pipe is laid in the bore. (Insp. By Consignee) | — | — | — | 2,57,260 | |
| — | 7000.00 | — | — | ||
| Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes etc. as per the site requirement and as per approved cable route plan. This also includes laying of cables in track crossings & road crossings. (Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. (Insp. By Consignee) | — | — | — | 47,880 | |
| — | 250.00 | — | — | ||
| Supply of Double Walled Corrugated (DWC) Pipe/duct with associated collars etc. as per RDSO Specification No. RDSO/SPN/204/2011 or latest anti-rodent & anti-oxidant and nonflame propagating type in 6 meters straight length and of size 120 mm outer dia, & 103.5 mm inner dia. (The manufacturers, suppliers must produce valid IS license and should be certified under ISO 9000 and shall submit copy of certificate). One coupler with suitable rubber O-ring should be supplied with every 6m of pipe length. (The total quantity of above items is equal to no. of pipes supplied.) DWC pipe shall be marked at every 1 Mtr. length in such a way that manufacturer's name, vendor name and year of manufacture can be easily identified. (Insp. By Consignee) | — | — | — | 1,51,717.5 | |
| — | 3.00 | — | — | ||
| Excavation, casting, curing of foundation and Installation and Erection of Apparatus case Full (App. Case as per RDSO Drg. no. RDSO/S-11500 or latest) with contractor's own frame, cement and other material in the ratio 1:3:6. 'E' type lock to be supplied and installed with App. case. This includes filling of location foundations with river bed sand and plastering on top with a mixture of 1:4 of cement and sand. It covers fixing of lamp holder, switch and lamp etc. in Apparatus Case. (Insp. By Consignee) | — | — | — | 36,816.66 | |
| — | 3.00 | — | — | ||
| Fabrication and fixing of phenolic laminated sheet of grade P3, minimum 10 mm thick, as per Apparatus case diagram/plan, in location box by providing all fixtures like ARA/Disconnect terminals, fuse blocks, fuses, relays on square bars etc. including fixing of PVC coated string rods at the back side for cable support with contractor's own material like iron angle, nuts, bolts etc. The iron angle for fixing shall be minimum 3 mm thick. This also includes fixing of teak wood shelf minimum 25 mm thick for holding track circuit equipments. The work shall be done as per instructions of Rly engineer at site. (Apparatus case Full). (Insp. By Consignee) | — | — | — | 13,429.32 | |
| — | 3.00 | — | — | ||
| Supply of Phenolic laminated Sheet, resin bonded, grade P3 in standard size of 1220 X 1220 x 10 mm as per spec. No IS 2036 of 1995 or latest. Test report of manufacture to be supplied. (Insp. By Consignee) | — | — | — | 17,481.39 | |
| — | 10.00 | — | — | ||
| Supply of Key Lock Checking Relay (KLCR) working on 24V/60V DC, AC Immunized, metal to metal, with different ward combinations and contact configuration 4F/4B with 2 extra ward plates, RDSO spec no. RDSO/SPN/219/2016 Ver 1.0 with Amendment-1 or latest. (Insp. By RDSO) | — | — | — | 80,231.8 | |
| — | 4.00 | — | — | ||
| Supply and installation of prewired KLCR Box, wooden crank handle lock inside box, with 8 way terminal strips, LEDs of approved type, for fixing of EKT on wooden board inside box form installation KLCRs/EKTs up to 06 no., including supply of all material like board, handle, hinges, glass sheet etc. (Insp. By Consignee) | — | — | — | 53,436.48 | |
| — | 1.00 | — | — | ||
| Supply, Installation, Testing and Commissioning of Microprocessor based Networkable analog addressable and modular type of fire Alarm Control panel with display with 2 loop expandable up to four loop, power supply and battery backup as per RDSO specification no. RDSO/SPN/217/2021 ver. 3.0 or latest, including. GSM module-01 No. for sending SMS to configured mobile number and relay module-02 Nos. for connecting to data logger for remote Monitoring. The panel should support sufficient devices of both detectors and modulesin a single line circuit. (Insp. By RDSO) | — | — | — | 97,726.08 | |
| — | 15.00 | — | — | ||
| Supply, Installation, Testing and Commissioning of Addressable heat & smoke Multi sensor. As per RDSO Specification No. RDSO/SPN/ 217/2021 Ver 3.0 or Latest). (Insp. By RDSO) | — | — | — | 45,802.65 | |
| — | 500.00 | — | — | ||
| Supply of Disconnect Terminal block for four conductors with screwing cage/clamp type, sliding switch disconnect, as per RDSO spec. RDSO/SPN/189/2004 Ver. 3.0 or latest, for each conductor size up to 2.5 sq. mm, equivalent of M6 terminals. Each terminal blockequipped with two markers, on top and bottom, an end plate, two end clamps and adequate length of rails for fitting terminal blocks. (Insp. By Consignee) | — | — | — | 96,360 | |
| — | 500.00 | — | — | ||
| Supply of ARA terminal block, made of PBT, as per RDSO spec. No. IRS: S-75/2006 (Rev.2) or latest and as per Drawing. No. SA- 23741A (Alt.-4) or latest. (Insp. By RDSO) | — | — | — | 58,505 | |
| — | 500.00 | — | — | ||
| Fixing of ARA(M-6) Terminals /Screw less connectors / modular disconnect terminal blocks and fuse blocks on phenolic laminated sheets and fixing by stainless steel/brass nuts & bolts. This includes provision of two additional holes on the board on either side for cableconductor entry. The work shall be carried out a per instructions of railway Engineer incharge. (Supply of all above terminals has been covered separately). (Insp. By Consignee) | — | — | — | 8,815 | |
| — | 500.00 | — | — | ||
| Termination of Outdoor Cables (Main Cables /tail cables) at ARA/Disconnect type terminals provided in Apparatus Cases, Cable termination rack in relay room, station building, generator room etc. The item includes dressing of cables and wires with dressing threadsas per standard practice. All material required for this item will be supplied by contractor. The outdoor cable shall be terminated in Relay Room, DG Room, ASM Room etc. under supervision and instructions issued by Engr. incharge of the work. (Insp. By Consignee) | — | — | — | 7,380 | |
| — | 200.00 | — | — | ||
| Supply of Non deteriorating type, round head type, low voltage cartridge fuse as per Spec No IRS: S -78/2006 with latest amendments, 2A/4A/6A/8A/10A rating capacity. (Insp. By RDSO) | — | — | — | 24,628 | |
| — | 200.00 | — | — | ||
| Supply of Cartridge Fuse block, made of PBT, as per RDSO spec. No. IRS: S-75/2006 (Rev.2) or latest and as per Drawing. No. SA- 23748 (Alt.-4) or latest. (Insp. By RDSO) | — | — | — | 48,710 | |
| — | 10.00 | — | — | ||
| Supply and installation of earth electrode as per standard practice and as per NCR Drawing no. S&T/CONST/6.4/97. It includes supply of GI pipe of 3m length. It includes connecting the earth electrode to the equipments which are required to be earthed including digging of earth pit 3 Mtr. deep and fixing earth electrode pipe, casting of cement concrete enclosure with cover (cover as per drawing no. S&T/CONST/6.3/97. It includes installation of 7 strand GI wires as earth lead wires, supported on MS flat size 5mm x 40 mm, soldering and nut bolt both, one end of both earth lead wire and MS flat to earth electrode and other end to Location boxes, block equipments, power equipments, cable sheath, signals etc. as per site requirement and as per instructions given by engineer incharge. (Insp. By Consignee) | — | — | — | 33,535.4 | |
| — | 4.00 | — | — | ||
| Supply of Office table for supervisors, office table (Model-Godrej T-9 or similar reputed make). (Insp. By Consignee) | — | — | — | 1,13,280 | |
| — | 5.00 | — | — | ||
| Supply of Chair for supervisors: Revolving chair (Model-GODREJ Bravo Mid Black or similar reputed make. (Insp. By Consignee) | — | — | — | 59,000 | |
| — | 5.00 | — | — | ||
| Supply of Steel stool, 1 ft by 1 ft size, 1.5 ft height, laminated top. (Insp. By Consignee) | — | — | — | 6,333.4 | |
| — | 10.00 | — | — | ||
| Supply of Chair for Non supervisors: Model-GODREJ CH-7B or similar reputed make. (Insp. By Consignee) | — | — | — | 56,640 | |
| — | 1.00 | — | — | ||
| Supply, Installation and commissioning of active lightning arrestor of Class 'A' for building protection as per standard NFC- 17-102 :2011 or latest. It shall work on early streamer emission principle. It shall be made of stainless steel with an operating time of 60 microsecond or less. A non-resettable counter shall be provided to count the number of lightning occurrences. The device shall be installed on top of the building on a GI mast and shall be connected to the earth pit through a copper tape of 25mm x 2mm or better. The copper tape shall not touch the building throughout and shall be connected to the earth electrode by exothermic welding. (Insp. By Consignee) | — | — | — | 1,11,718.36 | |
| — | 1000.00 | — | — | ||
| Pulling and Blowing of 48F OFC in already laid HDPE duct intrench as per EIC. (Insp. By Consignee) | — | — | — | 11,220 | |
| — | 2.00 | — | — | ||
| — | — | — | 6,37,724.38 | ||
| of embedded fanless or latest & VDU shall be minimum console table of be as per requirement VDUs in ASM/SM office room Inspected by RITES. (1No.=1 | :- Supply spec.No.RDSO/SPN/192/2019Ver.2.0 size of Operating/VDU table will the grade PC | — | as per RDSO 02.11.12 monitor. Note:- 1. revolving chair . as approved 3.The embedded | ||
| — | 2.00 | — | — | ||
| Installation, wiring,testing and commissioning of embedded fanless PC based Maintenance terminal/Datalogger terminal as per RDSO spec. No.RDSO/SPN/192/2019 Ver.2.0 or latest & RDSO TANNo. - STS/E/TAN/3007version 1 dated:02.11.12supplied vide SOR item01004. (1 No.=1 Set =1VDU+1PC). Necessary accessories like connectors, fuses, grips,SPD, wires, cables, power sockets, tops, LAN cables for PC/VDU and logic software for LCP/VDU (inconsultation with OEM)will be supplied by the contractor as per site requirement and instructions by Railway representative. (Insp. By Consignee) | — | — | — | 1,59,431.1 | |
| — | 2.00 | — | — | ||
| Inverter, QUINT INVERTER, DIN rail mounting, input:24V DC,output: 1AC/600VA, Puresine, having input voltage24V DC, Input voltage range 20V DC-30V DC,with max current consumption of 28A, and output voltage 120VAmp. plus or minus 2percent (100 V AC/ 6A-130 V AC/4.6A) / 230 VAC plus or minus 2percent (200 V AC/3A-240V/2.5A), Manual selection of AC out put voltage via signal terminal, form of output voltage pure sine, Real Power 480W, MTBF (IEC61709)- 532525 h (400C), screw connection conductor size 0.2 mm2-4mm2, with signal output, Ambient temperature (operation) --25 0C - 60 0C, Max. Permissible relative humidity (operation)- less than or equal to 95percent shock-20g in alldirections (EN 60068-2-27), Vibration(operation)- 5Hz- 100Hz,0.7g(EN 60068-2-6),Noise immunity in accordance with EN61000-6-2. Make:-Pheonix Contact orsimilar. Accepted offer:-MONITOR THROUGH SEPARATE INVERTERINPUT VOLTAGE 110VDC NOMINAL AND OUTPUT 110VAC PURE SINE WAVEAS PER RDSO TAN NO.STS/E/TAN/3012 VERSION 3.0DATED.03.11.22. (Insp. By Consignee) | — | — | — | 1,50,025.2 | |
| — | 1.00 | — | — | ||
| Supply, Installation, Testing & Commissioning of PC Work station hardware as per clause no. 11.0 of RDSO Spec RDSO/SPN/TC/65/2021 Revision 6.0 or later for Viewing, Monitoring and System Management with digital keyboard, Mouse and loaded with Graphic User Interface Client Software Features per clause no.18.2.0 of RDSO SpecRDSO/SPN/TC/65/ 2021 Revision 6.0 or later. Software licenses conditions as per RDSO spec Clause 20.0 of RDSO SpecRDSO/SPN/TC/65/2021 Revision 6.0 or later. (Insp. By Consignee) | — | — | — | 1,45,827.01 | |
| — | 2.00 | — | — | ||
| Supply, Installation & Commissioning (including programming) of Communication Equipment-Network Switch Siemens Make RUGGEDCOM RMC-40 suitable for KFW Section of NCR. (Insp. By RITES) | — | — | — | 6,15,892.12 | |
| — | 2.00 | — | — | ||
| Supply of DC-DC Converter as per SpecNo. IRS:S-96/2000 or with latest amendment /spec. rating -110v/24VDC. 10A. (Insp. By RDSO) | — | — | — | 58,829.04 | |
| — | 4.00 | — | — | ||
| Supply, Installation and Fixing of 24 Fiber termination boxes and termination of all fibres using pig tail cable of standard size [Allmaterials including pigtails [5 meter each] tobe supplied by the contractor, this also includes arrangement and fixing of suitablemetal box fixable inwall for spare OFC coil]. (Insp. By Consignee) | — | — | — | 49,852.72 | |
| — | 50.00 | — | — | ||
| Supply of OTTA 16/25 terminal P X C description OTTA 25-M6 and P X C part No.0790491 or similar & as per instruction of Railway Engg. (Insp. By Consignee) | — | — | — | 2,990 | |
| — | 30.00 | — | — | ||
| Supply, installation & commissioning of HDMI Cable with connectors for Connectivity between Audio visual system. (Insp. By Consignee) | — | — | — | 5,816.4 | |
| — | 20.00 | — | — | ||
| TGT-TCF circuit (KRJ-SKQ & KRJ-DAR) to be shifted. (Insp. By Consignee) | — | — | — | 14,000 | |
| — | 250.00 | — | — | ||
| Laying of DWC Pipes 120 mm outer diaalong with collers at places of track , road crossing , plate form cutting etc. or as directed by Railway representative at site. (Insp. By Consignee) | — | — | — | 1,225 | |
| — | 500.00 | — | — | ||
| Supply of End plates forModular terminal block. (Insp. By Consignee) | — | — | — | 5,200 | |
| — | 500.00 | — | — | ||
| Supply of End Stopper for35 DIN Rail. (Insp. By Consignee) | — | — | — | 5,665 | |
| — | 500.00 | — | — | ||
| Supply of DIN Rail35X7.5mm, 1mm thick unslotted DIN 35U for fixing Modular terminalblock of 1 mtrs length. (Insp. By Consignee) | — | — | — | 29,270 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-VIBCATurnOver.pdf
ATTACHMENT
LASTFYDECLARATION.pdf
ATTACHMENT
TenderDoc27pageLATESTUpdt..pdf Tender Document 27 pg
ATTACHMENT
AnnexureAEmployeedRlyEngg..pdf Annexure A
ATTACHMENT
Annexure-VIABidsecurity.pdf
ATTACHMENT
GCCCorrectionSlip1to11.pdf
ATTACHMENT
TenderDoc27pageLATESTUpdt..pdf
ATTACHMENT
AnnexureAEmployeedRlyEngg..pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].