Tender Value
₹8.1 Cr
EMD Value
₹16.2 L
Closing Date
20 Aug 2026, 2:30 pmClosed
Supertending Engineer
Irrigation Work Circle Banda
Restoration of Chhani Branch Km 0.000 to 5.500, Sumerpur Branch Km 0.000 to 7.200, Baswari Mr. Km 0.000 to 5.232, Masgaon Mr. Km 0.000 to 5.235, Tagari Mr. Km 0.000 to 8.850 and Naugawan Alpika Km 0.000 to 5.840 under Irrigation Division Mahoba LOT1
2026_UPIDC_1170895_2
08/SE/2026-27 dt 09-07-2026
Open Tender
Civil Works
Item Wise
300 days
Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,900
₹16.2 L
1 Sept 2026
12 Aug 2026
20 Aug 2026
12 Aug 2026
20 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation of Foundation M.K.R. and Kanker Mixed soil including all labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. | 4,716.96 | M3 | 92.9 | ₹4,38,205.58 |
| 2 | Laying Coarse sand in foundation including all labour T & P etc. for proper completion of work. As per direction of Engineer-in-charge. | 416.53 | M3 | 2,539.34 | ₹10,57,711.29 |
| 3 | P.C.C. 1:3:6 in foundation with cement, Sand & 22.40-53mm Stone Ballast including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 148.06 | M3 | 5,099.94 | ₹7,55,097.12 |
| 4 | R.C.R. Stone Masonry work with 1:4 Cement Sand Mortar including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 1,925.42 | M3 | 5,895.59 | ₹1,13,51,486.9 |
| 5 | Raised Struck pointing with 1:3 cement sand Morter including all labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. | 2,995.22 | Sqm | 133.91 | ₹4,01,089.91 |
| 6 | Providing & Laying and fixing R.C.C. hume pipe NP3 of 150 mm dia including making joint by fixing collor with all cost of material, labour, T&P, carriage etc. | 690 | RM | 913.9 | ₹6,30,591 |
| 7 | Providing & Laying and fixing R.C.C. hume pipe NP3 of 600 mm dia including making joint by fixing collor with all cost of material, labour, T&P, carriage etc. | 7.5 | RM | 2,211.6 | ₹16,587 |
| 8 | Providing & Laying and fixing R.C.C. hume pipe NP3 of 1000 mm dia including making joint by fixing collor with all cost of material, labour, T&P, carriage etc. | 10 | RM | 5,476.1 | ₹54,761 |
| 9Centering and Shuttering including all Labour T&P etc. for proper complection of work As per direction of Engineer-in-charge A-For Plain CC work including all material T & P | |||||
| 9.1 | A-For Plain CC work including all material T & P | 6,632.18 | Sqm | 312.8 | ₹20,74,545.9 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.09 MB
BOQ_2211206.xls
BOQ • 0.36 MB
TD.pdf
Tender Documents • 2.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .