| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹2.9 L+₹18,410 (6.74%)Rejected-AOC | L2 | Rejected-AOC Bid higher than L1 | |
| 3 | L3₹3.0 L+₹23,480 (8.59%)Rejected-AOC 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | L3 | Rejected-AOC Bid higher than L1 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
5 Oct 2020, 3:00 pmClosed
Executive Engineer MICD
O/o Executive Engineer MICD Jammu
Restoration Upkeepment of Lift Irrigation Stations at LIS Langer, LIS Rajpur Kamila and at LIS Zindapeer of Distt Rajouri
2020_IFC_105375_1
MICD/J/19 of 2020-21
Open Tender
Miscellaneous Works
Item Rate
15 days
Rajouri
As per SBD
8 documents required · 8 mandatory
₹300
Yes
Executive Engineer MICD
₹10,000
Yes
O/o Executive Engineer MICD Jammu
13 Oct 2020
25 Sept 2020
6 Oct 2020
25 Sept 2020
5 Oct 2020
29 Sept 2020
28 Sept 2020
Amount
Restoration / Upkeepment of Lift Irrigation Stations viz: at LIS Langer, LIS Rajpur Kamila and at LIS Zindapeer of Distt Rajouri damaged due to flash floods occurred recently.
Desilting of pump house filled with sand, stones, pebbles & other unwanted materials due to flash floods at LIS Langer. The job involves clearance of silt, sand, pebbles, wooden blocks and bushes etc. from inside as well as surroundings of the pump house alongwith clearance of approach pathway by engaging manual labour and further disposing of the un wanted materials at a suitable distance using manual labour, hand carts and necessary required tools & tackles. Complete job includes cost on account of labour charges and hire charges of tools & tackles required for the execution of job. Complete Job
Dismantling/Servicing of 02 Nos. 1.5 cusec discharge, 104 m head horizontal casing pump sets coupled with 75 KW motors by way of dismantling of the pumps from the base frames, de-coupling from the motor and suction delivery lines at LIS Langer. Dismantling the pump at site for extraction of damaged bearings including its replacement. P/F of new gland packing of 10mm dia, nut bolts, rubber sealings after cleaning the gland bushes and gland plate sets, applying sufficient amount of grease including gland packing to avoid excessive wear and tear, Job further includes complete dismantling of motors covers, its cleaning, drying and varnishing and reassembling of motors with pumping units at site with testing including cost of labour charges, material and hire charges of tools and tackles extra. Complete Job
Retrieving of the damaged staircase from downstream of from LIS Langer with the help of crane as well as by engaging manual labour and chain pulley block. Then dragging of the damaged staircase to the site for necessary repairs/ replacement of parts by way of Cutting the damaged parts of the stair case done by welding as well as repairs/fabrication of the damaged parts of M.S. Staircase 12 feet long 2.5 feet wide with working platform [2.5 feet long, 2.5 feet wide] from 40mm dia. M.S Pipe for railing and 40×6mm M.S flat for working platform and MS angle iron 40x40x3mm & M.S channel 70x40x6mm. The staircase to be properly fixed by way of welding of required nos. of M.S supports grouted in earth properly along the side of bank of Nullah and requisite nos. supports for proper clamping of railing on both sides with suitable nos. of M.S. angle iron and M.S. iron flat supports. Job further involves removing of the rust/dirt from the outer surface of the stair case by sanding away with sand papers/steel wire brush, cleaning & making the surface even for painting then applying one coat of primer red oxide & two coats of black bituminous paint. The job includes cost of material, labour charges, charges of crane and other necessary tool and tackles. Job also includes all types of carriage charges of material and tools tackles to site and outstation charges etc. Complete job to be executed at site abreast head load charges because the scheme is situated at about 1 Km away from main road and the approach road is purely Kacha and Muddy road. Complete Job
Desilting of pump house filled with mud, sand, stones & other unwanted materials due to flash floods at LIS Rajpura Kamila. The job involves clearance of silt, sand, pebbles, and bushes etc. from inside as well as surroundings of the pump house alongwith clearance of approach road by engaging manual labour and further disposing of the un wanted materials at a suitable distance using manual labour and necessary required tools & tackles. Complete job includes cost on account of labour charges and hire charges of tools & tackles required for the execution of job. Complete Job
Repair/ Servicing of starters 20HPx 02 Nos. of LIS Rajpura Kamila by complete dismantling of all parts of starters and then cleaning all the parts with recommended chemicals. Servicing of current transformer (CT) of starters & reassembling the same. Cleaning oil tank and providing and filling of 15 Ltrs of fresh T. Oil for topping purpose in each starter making all the electric connections by P/F of new brass nuts, bolts and washers. Complete job include cost of material, T. Oil, hire charges of tools and tackles and transport charges etc. Complete Job
Providing/ fitting of ATS coil for 20HP starter unit No. 01 at LIS Rajpura Kamila, the job involves extraction of old, damaged ATS coil. Providing/ fitting of new ATS coil as per old sample in the starter. Testing starter on load. Complete job includes cost of labour charges. Charges on account of mechanical transport and hire charges of tools and tackles required for execution of the job. Complete job.
Desilting of pump room filled with mud, sand, stones, pebbles & other unwanted materials due to flash floods at LIS Zindapeer. The job involves clearance of silt, sand, pebbles, wooden blocks and bushes etc. from inside as well as surroundings of the pump house alongwith clearance of approach pathway by engaging manual labour and further disposing of the un wanted materials at a suitable distance using manual labour, hand carts and necessary required tools & tackles. Complete job includes cost on account of labour charges and hire charges of tools & tackles required for the execution of job. Complete Job
Repair to 63 KVA voltage stabilizer at LIS Zindapeer. Job includes disconnecting all the electrical connections from the voltage stabilizer and then opening the top cover and extraction of core assembly from the stabilizer using CPB. Draining out of the water mixed T-oil form the stabilizer and extracting out core assembly from it. Cleaning of the tank of voltage stabilizer by recommended chemicals, Lowering the core assembly in it. Topping up with 100 litres of fresh T-oil. Fitting the top cover by providing/fitting of new gaskets, nuts and bolts. Making all the electric connections by thimbling the cables properly. Providing/fitting of indicator lamps 2no.s, Complete job includes cost of material and labour charges for the execution of job at site. It also includes hire charges of tools and tackles used including the out station charges etc. Complete job.
Providing/ fitting of link sets and D.O set in place of damaged one at LIS Zindapeer. The job involves disconnecting the HT power supply. Extraction of damaged link sets and D.O Sets. Providing/fitting of link sets and D.O set in place of damaged one. Making HT connections. Complete job includes cost of material at the site of the LIS including skilled labour charges. Complete job.
Repairs/replacement of parts to the 150 mm dia. suction pipes along with allied works damaged due to flash floods at LIS Zindapeer by way of cutting of M.S flanges from bulged/damaged M.S suction pipes, straightening and making proper alignment of pipes for both pumping units. Complete job includes cost of material their carriage on mechanical transport and partially on manual head load, carriage and hire charges to and fro of tools and tackles along with welding set and charges for skilled and semi-skilled labour. Complete dismantling of 02 Nos. foot valve of 150mm dia, cleaning of foot valves properly along with strainers, adjustment to flaps by adjusting and repairing to hinge arrangements. Reassembling the foot valve and fitting it with the suction pipes in the sump by providing/ fitting of all new rubber insulation sheets to all flanged joints and nut bolts. It also includes cost of material labour charges and all types of carriages involved and hire charges of tools and tackles required for the job. Installation of foot valve includes dismantling of choked suction pipes and cleaning of mud/silt from pipes using special tools and tackles. Installation, fitting and alignment of foot valve with the 150mm dia. suction pipeline by way of providing and fitting of nuts & bolts, RI sheets, labour charges for skilled and semi-skilled labour etc. at Zindapeer. Complete Job
M/s RK Elect. Mech. Engg and fabrication works
NATIONAL ELECTRO-MECH COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .