Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹7.8 L+₹72,820 (10.4%)Rejected-Finance | L2 | Rejected-Finance Not Being Lowest Bidder | |
| 3 | L3₹8.8 L+₹1.7 L (24.7%)Rejected-Finance | L3 | Rejected-Finance Not Being Lowest Bidder | |
| 4 | L4₹11.6 L+₹4.5 L (64.4%)Rejected-Finance | L4 | Rejected-Finance Not Being Lowest Bidder | |
| 5 | L5₹13.6 L+₹6.6 L (94.1%)Rejected-Finance 72 USMAN ENCAVE SECTOR O ALIGANJ LUCKNOW 226004 UP | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226004 | L5 | Rejected-Finance Not Being Lowest Bidder |
Tender Value
₹16.4 L
EMD Value
₹32,800
Closing Date
11 Jul 2020, 6:00 pmClosed
GE E/M Lucknow
Garrison Engineer E/M, 36 LBS Marg, Lucknow Cantt, Lucknow (U.P.) PIN 226002
MANNING AND OPERATION FOR DG SET IN SCATTERED AREA (TRANSETER PAO (OR) AND OTC OF AGE E/M EXT (ELECT) UNDER GE E/M LUCKNOW
2020_MES_352594_1
GE/EM/LKO/EXT(ELECT)/T-25 OF 2020-2021
Open Tender
Miscellaneous Works
Item Rate
335 days
Lucknow
Class E or above category d (v)
8 documents required · 8 mandatory
₹500
GE E/M Lucknow
₹32,800
Yes
17 Aug 2020
13 Jun 2020
13 Jul 2020
13 Jun 2020
11 Jul 2020
29 Jun 2020
Amount
Manning and operation of installations having diesel driven generator sets any type, make, model and capacity round the clock by employing one operator (highly skilled ) adequately qualified, in each shifts of 08 ( Eight Hours ) at each installation (for total duration of 16 Hours i.e. in two shifts) including Sundays and Holidays, including operation of connected electrical equipment such as main switch, starter, change over switch, MCCB, Voltmeter, Ampmeter, Panel board including minor repair / maintenance complete all as specified and directed by Engineer- in- Charge at the following two installations:- (a) OTC AMC (b) HQ AMC
Manning and operation of installations having diesel driven generator sets any type, make, model and capacity round the clock by employing one operator (highly skilled ) adequately qualified, in each shifts of 08 ( Eight Hours ) at each installation (for total duration of 8 Hours i.e. in one shifts) including Sundays and Holidays, including operation of connected electrical equipment such as main switch, starter, change over switch, MCCB, Voltmeter, Ampmeter, Panel board including minor repair / maintenance complete all as specified and directed by Engineer- in- Charge at the following two installations:- (a) MES IB (b) AMC POR
Notes for "BOQ ' Item No. 1 to 2 :- (i) 24 hours will be considered as a day and generator set will be run as and when power supply fails and as directed and the same shall be operated in three shifts of 08 hours each i.e. 1st shift from 0600 hrs to 1400 hrs, 2nd shift from 1400 hrs to 2200 hrs and 3rd shift from 2200 hrs to 0600 hrs of the next day as directed by Engineer-in-Charge. Contractor shall employ one operator per shift. (ii) Consumption of DHPP & Engine Oil will be regulated by the department. However, supply of the items is out of the scope of work. (iii) Greasing, lubricating, watering, topping up of engine oil, topping up of coolant in radiator, cleaning and topping up of electrolytes in batteries and cleaning material as cotton waste, boom etc will be maintained by the contractor in each installation the cost of such maintenance deemed to include in rate quoted by the contractor . (iv) The log sheets indicating daily fuel consumption, engine oil, lubricant grease, hours run, etc will be maintained by the contractor in each installations.Contractor shall provided Log book, Attendence Register,Plant running record book and rate quoted by the contractor shall deemed to included in his quoted rates . (v) The contractor will be responsible for upkeep of the installations in neat and tidy conditions and in a presentable manner. The surrounding of the installation will also be maintained neat and clean by removing grasses and other vegetation. (vi) The site documents such as Log Sheet, Attendance etc will be checked daily by JE, weekly by Engineer-in-Charge and monthly by GE.
Notes for "BOQ ' Item No. 1 to 3 contdd/--- :- (vii) All plant and machinery equipment and other items belonging to plant including safety shall be responsibility of manpower employed by the contractor. (viii) Contractor shall provided necessary T & P for General Maintanace and opertation . (ix) Contractor shall provided two set of uniform, Shoe with Name Plate , Mobile connection , Etc (x) Minor stores required should be provided by the contractor. (xi) Major stores required for ractification of complaint will be supplied by the demartment. (xii) Contractor shall submit insurance cover of all the workers employed by him for 11 Month period.
M/S Hind Constructions
Ajanta Associates
Enviro India
Unnati Engineers
GUJRAL BUILDERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .