Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
22 Dec 2025, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SURESH KUMAR
Municipal Committee Safidon
Construction/Repair of Mahatma Gandhi Road from Rampura Road to Jind Nahar Pull in MC Safidon.
2025_HRY_489490_1
20250E2294CA B1A2 4230 8A01 106AD451DA41351ULB
Open Tender
Civil Works
Works
180 days
Safidon
2 documents required · 2 mandatory
₹10,000
Yes
₹4.2 L
Yes
19 Mar 2026
11 Dec 2025
22 Dec 2025
11 Dec 2025
22 Dec 2025
11 Dec 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Municipal Committee Safidon
Name of Work: Construction/Repair of Mahatma Gandhi Road from Rampura Road to Jind Nahar Pull in MC Safidon. -[DNIT No.-136408]
Name of the Bidder/ Bidding Firm / Company :
Sl. No. z Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1.01 Credit of Existing old bituminous material received after milling of DBM or BC (Unit = 100 Cum after taking 80% credit of mild/scarified material ) BI01010001010000000000000515BI0100001113 95.69 cum 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.02 Supplying and fixing Heavy Duty Perforated Drain Cover, size 600 mm x 900 mm, including frame, fabricated from mild steel conforming to IS:2062, with minimum thickness of 8 mm for cover and 10 mm for frame, designed to withstand heavy vehicular load (minimum 20-25 tonnes). The drain cover shall be hot-dip galvanized with minimum 80 microns coating for corrosion resistance and long-term durability in outdoor road conditions. (The cover shall have perforations or slots for efficient drainage and shall be machine-cut with lifting hooks provided. All edges to be properly machined and deburred to avoid sharp edges. The unit shall be flush with the surrounding surface and securely seated in the frame to prevent dislodgment due to traffic complete in all respects as per entire satisfaction of Engineer-in-charge) BI01010001010000000000000515BI0100001113 35 Each 0 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Municipal Committee Safidon
Name of Work: Construction/Repair of Mahatma Gandhi Road from Rampura Road to Jind Nahar Pull in MC Safidon. -[DNIT No.-136408]
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 [10.2]Supplying and filling in plinth with sand (conforming to zone-IV, IS 1542) under floors, including watering, ramming, consolidating and dressing complete. [Through Rate] BI01010001010000000000000515BI0100001113 275.04 cum 826 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 [10.7]Providing and laying of conglomerate floor 50mm thick cement concrete topping 1:2:4 [Through Rate] BI01010001010000000000000515BI0100001114 525 Sqm 216 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
3 [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] BI01010001010000000000000515BI0100001114 1260 Sqm 113 Excess(+) Full Conversion INR
4 [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] BI01010001010000000000000515BI0100001115 1260 Sqm 138 Excess(+) Full Conversion INR
5 [17.15.3]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 3. Grading III material [Through Rate] BI01010001010000000000000515BI0100001116 1464.75 cum 1044 Excess(+) Full Conversion INR
6 [17.22.2]Water Bound Macadam Gr I 2. Water Bound Macadam Grading I with screening Type A Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] BI01010001010000000000000515BI0100001115 1530.75 cum 1225 Excess(+) Full Conversion INR
7 [17.43.2]Laying of recycled Bituminous Pavement with Central Recycling Plant upto 75mm 2. Milling on Bituminous surface: Dismantling of existing damaged Bitumen surface by cold Milling Machine up to any depth and hauling the milled material up to any lead and stacking at nearest recycling Plant site. [Through Rate] BI01010001010000000000000515BI0100001116 119.61 cum 403 Excess(+) Full Conversion INR
8 [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] BI01010001010000000000000515BI0100001117 6876 Sqm 655 Excess(+) Full Conversion INR
9 [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] BI01010001010000000000000515BI0100001116 5778 Sqm 26 Excess(+) Full Conversion INR
10 [17.71]Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 100mm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504 [Through Rate] BI01010001010000000000000515BI0100001117 2889 Sqm 66 Excess(+) Full Conversion INR
11 [26.58.1]Supply and installation of garden bench 1. Chair type garden bench with L-shaped sides made of reinforced concrete (M30), thickness 100 mm, overall height 1000 mm, base width 620 mm. Back and seat shall consist of 5 Nos. reinforced concrete planks 1500 mm x 100 mm x 50 mm one plank 1500 mm x 200 mm x 50 mm. Seating height of the bench shall be 450 mm. The bench shall be fixed with nuts on concrete mount, all holes sealed after assembly and installation. All materials required to be as per BIS specifications. [Through Rate] BI01010001010000000000000515BI0100001118 25 Each 4814 Excess(+) Full Conversion INR
12 [28.19]Providing and applying integral crystalline (dry shake) of hydrophilic in nature for waterproofing treatment to the RCC structures like basement raft, foundation slab, sewage and water treatment plant slab, warehouses floor, parking structures and water tank base slab etc. sprinkled @0.60kg per sqm or higher as recommended by the manufacturer`s specification over the lean concrete of above cited structures. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e. by reducing permeability of concrete by more than 85%, compared control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline dry-shake shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the Engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. [Through Rate] BI01010001010000000000000515BI0100001119 525 Sqm 262 Excess(+) Full Conversion INR
13 [28.20.1]Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservoir, sewage and water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fibre brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e. by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. 1. For vertical surface two coats @ 0.70 kg per sqm [Through Rate] BI01010001010000000000000515BI0100001120 1260 Sqm 398 Excess(+) Full Conversion INR
14 [34.36]Solar RPM/ Stud Providing and installation of solar cat eye produced from an engineered polymer selected for superior impact resistance and weather-ability. The top of the solar stud should be transparent for solar charging and light output in active mode. The base of the body shall be yellow or neutral white as approved by Engineer In-charge. The marker shall incorporate a solar panel (comprising of solar cells) for converting solar energy into electricity, a storage device for storing the energy, LEDs for illumination and a design for providing 360 degree smooth illumination. The Solar stud shall be round in shape for providing illumination in all directions. The solar stud shall also have high reflective polycarbonate/ methyl methecrylate lenses for conspicuity in passive mode and dual shanks for improved road presence. The solar studs are intended for application directly onto pavement surfaces and shall be applied with epoxy resin adhesives designed for use with raised pavement markers and as supplied by the marker manufacturer separately. The solar cat eye shall be of height: 65 ± 2 mm & Maximum Diameter: 136 ± 5 mm. The body of the solar cat eye shall be resistant to dust and water ingress as per IP 65 standards. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280. [Through Rate] BI01010001010000000000000515BI0100001114 226.8 Nos. 2583 Excess(+) Full Conversion INR
15 [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] BI01010001010000000000000515BI0100001115 2087.3 cum 78 Excess(+) Full Conversion INR
16 [5.23.1]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 1. Nominal concrete 1:1.5:3 or richer mix (i/c equivalent design mix) [Through Rate] BI01010001010000000000000515BI0100001116 917.01 cum 1287 Excess(+) Full Conversion INR
17 [5.70]Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. [Through Rate] BI01010001010000000000000515BI0100001115 1148.13 cum 86 Excess(+) Full Conversion INR
18 [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] BI01010001010000000000000515BI0100001116 162.23 cum 2442 Excess(+) Full Conversion INR
19 [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] BI01010001010000000000000515BI0100001117 410.97 cum 4374 Excess(+) Full Conversion INR
20 [6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] BI01010001010000000000000515BI0100001116 149.52 cum 5969 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
21 [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] BI01010001010000000000000515BI0100001117 556.5 Sqm 156 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
22 [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate] BI01010001010000000000000515BI0100001118 976.5 Sqm 208 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
23 [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] BI01010001010000000000000515BI0100001119 53426.1 Kg. 66 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
24 [6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate] BI01010001010000000000000515BI0100001120 19437.6 Kg. 68 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
25 [7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] BI01010001010000000000000515BI0100001114 289.8 cum 3968 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_567682.xls
BOQ • 0.31 MB
AD0136408.pdf
Additional Documents • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .