Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAdmitted-Finance | ₹6.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.9 Cr+₹16.9 L (2.53%)Admitted-Finance | ₹6.9 Cr+₹16.9 L (2.53%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M.N.Enterprises L1 | M/S MOHAMMAD ASHRAF GILKAR ENGINEERS AND CONTRACTORS L2 |
|---|---|---|---|---|---|
| 1.00Providing and laying cast in situ cement concrete work M-20 mix (1 cement, 1 ½ coarse sand, 3 graded stone) 20mm Nominal size in foundation, plinth/ foundation Beams, columns, suspended floors and floor beams, landing, balconies, stair cases, lift walls, parapet wall and ramps excluding cost of form work and reinforcement which shall be paid separately, including all electricity and water charges complete ( crushed nallah stone) | |||||
| 1.10 | Upto plinth level | 1,133.5 | cum | - | - |
| 1.20 | Upto floor 5 level | 2,110 | cum | - | - |
| 2.00 | Providing formwork of ordinary ply shuttering to foundation and foundation Beams including propping, strutting, centering and removal of same including cost of nails, shuttering oil and all electricity charges. Complete Job | 553.26 | Sqm | - | - |
| 2.10 | Providing and fixing of form work with ordinary ply sheet (of specified grade) shuttering to horizontal soffits of suspended floors, roof landing balconies, shelves, lift wall, parapet wall, staircase and the like propping height upto 3.5 mtr. including cost of nails, shuttering oil, removal of same after use complete job upto floor 5 level. | 7,294.79 | Sqm | - | - |
| 3.00 | Providing & fixing with kit ply film coated/steel plates to sides of beams (ribs) lintels, plinth beams & soffits including centring, shuttering, & removal after use (incl. all electricity charges, nails, & shuttering oils) Complete Job upto floor 5 level. | 7,018.33 | Sqm | - | - |
| 3.10 | Extra for item No:- 3 for shuttering in circular work/curved in plan (20% of respective centring & shuttering items) | 910.8 | Sqm | - | - |
| 4.00 | Providing and fixing of formwork to circular columns, struts ports/ pedistals/ piers abutments and like including cost of nails, bolts, nuts, shuttering oil and removal after use (including all electricity charges) upto floor 5 level. | 1,630.28 | Sqm | - | - |
| 5.00 | Reinforcement of RCC work incl. assembling & placing reinforced TMT steel bars for RCC work upto floor 5 level incl. Cost of binding wire (all dia) incl. all elecetricity charges complete job (incl. All carraige charges all leads at site of work (SAIL, JINDAL or equivalent Fe 500D IS - 1786) | 3,81,470 | Kg | - | - |
| 6.00Supply and filling of Nallah muck/stone dust in 30 cm layers duly to be watered, compacted, consolidated and dressed under flooring in ground floor including loading, unloading carraige upto site of work all leads complete job. | |||||
Tender Value
₹6.7 Cr
EMD Value
₹13.4 L
Closing Date
23 Sept 2020, 4:00 pmClosed
DGM Unit 1st JKPCC Ltd Srinagar
DGM Unit 1st JKPCC Ltd Srinagar
Construction of Multilevel parking Block at Hazratbal by way of concreting, Form Work, reinforcement Work and filling of Foundation
2020_PWDJK_104329_1
23/e-Tendering/DGM/1ST/SGR
Open Tender
Civil Works
Item Rate
270 days
Hazratbal srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
FC JKPCC Ltd A/c
₹13.4 L
Yes
20 Oct 2020
15 Sept 2020
25 Sept 2020
15 Sept 2020
23 Sept 2020
15 Sept 2020
Amount
Providing and laying cast in situ cement concrete work M-20 mix (1 cement, 1 ½ coarse sand, 3 graded stone) 20mm Nominal size in foundation, plinth/ foundation Beams, columns, suspended floors and floor beams, landing, balconies, stair cases, lift walls, parapet wall and ramps excluding cost of form work and reinforcement which shall be paid separately, including all electricity and water charges complete ( crushed nallah stone)
Upto plinth level
Upto floor 5 level
Providing formwork of ordinary ply shuttering to foundation and foundation Beams including propping, strutting, centering and removal of same including cost of nails, shuttering oil and all electricity charges. Complete Job
Providing and fixing of form work with ordinary ply sheet (of specified grade) shuttering to horizontal soffits of suspended floors, roof landing balconies, shelves, lift wall, parapet wall, staircase and the like propping height upto 3.5 mtr. including cost of nails, shuttering oil, removal of same after use complete job upto floor 5 level.
Providing & fixing with kit ply film coated/steel plates to sides of beams (ribs) lintels, plinth beams & soffits including centring, shuttering, & removal after use (incl. all electricity charges, nails, & shuttering oils) Complete Job upto floor 5 level.
Extra for item No:- 3 for shuttering in circular work/curved in plan (20% of respective centring & shuttering items)
Providing and fixing of formwork to circular columns, struts ports/ pedistals/ piers abutments and like including cost of nails, bolts, nuts, shuttering oil and removal after use (including all electricity charges) upto floor 5 level.
Reinforcement of RCC work incl. assembling & placing reinforced TMT steel bars for RCC work upto floor 5 level incl. Cost of binding wire (all dia) incl. all elecetricity charges complete job (incl. All carraige charges all leads at site of work (SAIL, JINDAL or equivalent Fe 500D IS - 1786)
Supply and filling of Nallah muck/stone dust in 30 cm layers duly to be watered, compacted, consolidated and dressed under flooring in ground floor including loading, unloading carraige upto site of work all leads complete job.
a) Nallh Muck
b) Stone dust
c) Providing & laying cement concrete of specified grade excl. Cost of shuttering all work upto plinth level, mud mat 1:4:8 (1 cement : 4 coarse sand : 8 40mm nominal size aggregate) (Nallah Crushed)
Carriage of material by mechanical transport incl. Loading/unloading at site of work for an avergae of 14 KM.
a) 20mm aggregate nominal size (Nallah Crushed)
b) 40mm nominal aggregate
c) Coarse sand free from dirt, dust & organic matter
d) Cement/Steel
Cement
Steel
M/S MOHAMMAD ASHRAF GILKAR ENGINEERS AND CONTRACTORS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_198967.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .