| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.9 CrAccepted-AOC | ₹6.9 Cr | L-1 | Accepted-AOC Work awarded to lowest Contractor. Hence,EMD may be released in favour of the Contractor. |
| 2 | L-2₹7.1 Cr+₹21.0 L (3.06%)Rejected-Finance | ₹7.1 Cr+₹21.0 L (3.06%) | L-2 | Rejected-Finance Due to L-2, Hence, EMD may be released. |
| 3 | L-3₹9.5 Cr+₹2.7 Cr (38.8%)Rejected-Finance | ₹9.5 Cr+₹2.7 Cr (38.8%) | L-3 | Rejected-Finance Due to L-3, EMD may be released. |
Tender Value
₹8.1 Cr
EMD Value
₹16.2 L
Closing Date
12 May 2025, 6:00 pmClosed
Executive Engineer
Executive Engineer, Kalpa Division,HPPWD Kalpa
Extension of Stadium at Kalpa in District Kinnaur (HP) (SH- C/O Foundation, footing, plinth beam, columns upto slab level, providing protection work for road and interlocking paver block etc
2025_PWD_104884_1
PW/KNR-E-Tender/25-469-80 dated 28-04-2025
Open Tender
Civil Works - Others
Percentage
365 days
Kalpa, Kinnaur HP
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
₹16.2 L
29 Sept 2025
6 May 2025
13 May 2025
6 May 2025
12 May 2025
6 May 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains in all length and width , including dressing of sides and ramming of bottoms, lift upto all height, including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads and lifts in all kinds of soil complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 0.4 | Per Cubic meter | 273.75 | ₹109.23 |
| 2 | Providing and laying stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the required gradient and comber including spreading watering and rolling of binding materials moorum or earth etc., including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge including all incidentals. The rates are inclusive of octroi, royaltiy, malkana, toll tax, GST or other taxes imposed by the Government. | 322.5 | Per Cubic meter | 1,593.3 | ₹5,13,839.25 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering upto all level, Cement concrete grade 1:4:8 (one cement : four coarse sand : eight graded stone aggregate) 40mm ( forty millimetre) nominal size, including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 79.5 | Per Cubic meter | 6,874.05 | ₹5,46,486.98 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering upto all level, Cement concrete grade 1:5:10 (one cement : five coarse sand : ten graded stone aggregate) 40mm ( forty millimetre) nominal size, including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 70.72 | Per Cubic meter | 6,482.4 | ₹4,58,435.33 |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size), including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 322.5 | Per Cubic meter | 8,844.35 | ₹28,52,302.88 |
| 6 | Providing and laying in position reinforced cement concrete 1:1.5:3 (one cement : one point five coarse sand : three graded stone aggregate 20 mm (twenty millimeter) norminal size) excluding the cost of centering, shuttring, finishing, and reinforcement in beams ,suspended floors, roof having slope up to 15 Degree( fifteen Degree ), Landing, balconies, shelves, chajjas, lintels, bands, plain, window sills,staircases and spiral staircases , etctra all work above plinth level upto floor all level complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1,962.37 | Per Cubic meter | 11,817 | ₹2,31,89,326.29 |
| 7Centering and shuttering including strutting, propping etc. and removal of form work complete upto all floor level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | |||||
| 7.01 | Foundations, footings, bases for columns | 1,893.14 | Per Square meter | 314.35 | ₹5,95,108.56 |
| 7.02 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 1,032.93 | Per Square meter | 614.85 | ₹6,35,097.01 |
| 7.03 | Columns, piers, abutments, pillars, posts and struts | 1,771.9 | Per Square meter | 816.8 | ₹14,47,287.92 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_153758.xls
BOQ • 0.25 MB
169808260.pdf
Tender Documents • 0.38 MB
169808262.html
Tender Documents • 0.06 MB
SBD.pdf
Tender Documents • 6.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .