| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.7 LAccepted-AOC | ₹43.7 L Quoted ₹51.1 L | L1 | Accepted-AOC L1 Bidder AOC issued |
| 2 | L2₹53.2 LRejected-AOC NO 68 D BLOCK 2ND FLOOR S 1 FRONTIER HOMES ALIPH MAJITH NAGAR KELAMBAKKAM CHENGALPATTU DIST CHENNAI 603 103 | CHENGALPATTU | TAMIL NADU | 603103 | ₹53.2 L | L2 | Rejected-AOC L2 Bidder Rejected |
| Sl No | Description | Qty | Unit | Renga Engineering Works India Pvt Ltd L2 | Selvi Engineering Works L1 |
|---|---|---|---|---|---|
| 1.00 | I. Material Portion: M.S Plate 10 mm TK | 3.05 | MT | 93,000 ₹3,34,707 | 91,600 ₹3,29,668.4 |
| 2.00 | SS Liner plate | 24.12 | M² | 58,000 ₹16,50,772.8 | 55,000 ₹15,65,388 |
| 3.00 | II. Labour Portion: Dismantling of existing severely damaged /corroded Bucket wheel discharge Chute for Reclaimer-II which involves cutting, leading and removal of damaged portion including crane, winch hire charges, T&P charges consumables etc., | 2.25 | MT | 12,500 ₹33,187.5 | 11,700 ₹31,063.5 |
| 4.00 | Utilizing iron & steel structural materials lifting, loading, transporting and unloading in the work spot including consumables and T&P hire charges. | 3.05 | MT | 6,500 ₹23,393.5 | 6,150 ₹22,133.85 |
| 5.00 | Fabrication of Bucket wheel discharge Chute for Reclaimer-II by marking, cutting & fabrication of chute by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges. | 3.05 | MT | 88,000 ₹3,16,712 | 85,000 ₹3,05,915 |
| 6.00 | Erection of Bucket wheel discharge Chute for Reclaimer-II by leading, lifting, fixing, providing necessary scaffolding arrangement, including crane, winch hire charges, consumables and T&P hire | 3.05 | MT | 98,000 ₹3,52,702 | 95,000 ₹3,41,905 |
| 7.00 | Dismantling of S.S liner plates fabrication of Bucket wheel discharge Chute for Reclaimer-II by marking, cutting and Erection of chute by utilizing SS liner plate including cost scaffolding, crane, hire charges, consumables and T&P hire charges. | 24.12 | M² | 88,000 ₹25,04,620.8 | 85,000 ₹24,19,236 |
| 8.00 | Arranging scaffolding for cutting and removal of worn out layers of S.S. liner plates of Bucket wheel discharge Chute. | 1 | Time | 10,500 ₹12,390 | 9,150 ₹10,797 |
| 9.00 | Cleaning the Surface with shot basting the structures of Bucket Guide Chute for Reclaimer-II including cost of shots, hire charges for compressor, scaffolding arrangements including consumables and T&P hire charges. | 78 | M² | 350 ₹32,214 | 325 ₹29,913 |
| 10.00 | Painting charges for three coats of paint with a total dry film thickness (DFT) of 190 to 225 Microns ie. Painting with one coat of zinc phosphate epoxy primer (60-70 microns), one coat of MIO epoxy undercoating (100-120 microns DFT) & one coat of Aromatic poly urethane (30-35 microns DFT) including cost of thinner. | 78 | M² | 450 ₹41,418 | 430 ₹39,577.2 |
Tender Value
Refer Docs
EMD Value
₹38,800
Closing Date
6 Oct 2025, 2:00 pmClosed
CE/NCTPS-I
CE/NCTPS-I
NCTPSI SEMII Circle ICHS DnReplacement of existing severely damaged or corroded Bucket Wheel discharge Chute in ReclaimerII of ICHS
2025_EB_607337_1
CE/NCTPSI/SE/MII/SpNo94/25-26
Open Tender
Power/Energy Projects/Products
45 days
NCTPS-I Chennai
refer to tender document
3 documents required · 3 mandatory
₹0
₹38,800
Yes
17 Mar 2026
22 Sept 2025
7 Oct 2025
22 Sept 2025
6 Oct 2025
22 Sept 2025
Amount
I. Material Portion: M.S Plate 10 mm TK
SS Liner plate
II. Labour Portion: Dismantling of existing severely damaged /corroded Bucket wheel discharge Chute for Reclaimer-II which involves cutting, leading and removal of damaged portion including crane, winch hire charges, T&P charges consumables etc.,
Utilizing iron & steel structural materials lifting, loading, transporting and unloading in the work spot including consumables and T&P hire charges.
Fabrication of Bucket wheel discharge Chute for Reclaimer-II by marking, cutting & fabrication of chute by utilizing iron & steel structural including crane, winch hire charges, consumables and T&P hire charges.
Erection of Bucket wheel discharge Chute for Reclaimer-II by leading, lifting, fixing, providing necessary scaffolding arrangement, including crane, winch hire charges, consumables and T&P hire
Dismantling of S.S liner plates fabrication of Bucket wheel discharge Chute for Reclaimer-II by marking, cutting and Erection of chute by utilizing SS liner plate including cost scaffolding, crane, hire charges, consumables and T&P hire charges.
Arranging scaffolding for cutting and removal of worn out layers of S.S. liner plates of Bucket wheel discharge Chute.
Cleaning the Surface with shot basting the structures of Bucket Guide Chute for Reclaimer-II including cost of shots, hire charges for compressor, scaffolding arrangements including consumables and T&P hire charges.
Painting charges for three coats of paint with a total dry film thickness (DFT) of 190 to 225 Microns ie. Painting with one coat of zinc phosphate epoxy primer (60-70 microns), one coat of MIO epoxy undercoating (100-120 microns DFT) & one coat of Aromatic poly urethane (30-35 microns DFT) including cost of thinner.
Cost of paint for one coat of zinc phosphate epoxy primer (60-70 microns DFT) in the structure of Bucket Guide Chute for Reclaimer-II.
Cost of paint for one coat of MIO epoxy (100-120 microns DFT) in the structures of Bucket Guide Chute for Reclaimer-II.
Cost of paint for one coat of aromatic polyurethane epoxy (30-35 microns DFT) with total DFT of 190 to 225 microns in the structures of Bucket Guide Chute for Reclaimer-II.
Renga Engineering Works India Pvt Ltd (BID ID -1478361)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid