| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹12.4 L+₹27,544.62 (2.22%)Accepted-AOC MAIN ROAD LATEHAR | LATEHAR | JHARKHAND | 822111 | ₹12.4 L+₹27,544.62 (2.22%) Quoted ₹12.7 L | L2 | Accepted-AOC L1 unable to do above work |
| 2 | L1₹12.4 LRejected-Finance MAHUWADANR DIST LATEHAR | ₹12.4 L | L1 | Rejected-Finance L1 |
| 3 | L3₹14.0 L+₹1.6 L (13.1%)Rejected-Finance STATION ROAD LATEHAR | LATEHAR | LATEHAR | JHARKHAND | ₹14.0 L+₹1.6 L (13.1%) | L3 | Rejected-Finance L3 |
| 4 | L4₹14.8 L+₹2.4 L (19.6%)Rejected-Finance PARSAHI LATEHAR | ₹14.8 L+₹2.4 L (19.6%) | L4 | Rejected-Finance L4 |
| 5 | L5₹17.3 L+₹4.9 L (39.4%)Rejected-Finance | ₹17.3 L+₹4.9 L (39.4%) | L5 | Rejected-Finance L5 |
Tender Value
₹20.4 L
EMD Value
₹41,000
Closing Date
18 Feb 2026, 5:00 pmClosed
E.E.NREP, LATEHAR
E.E.NREP OFFICE LATEHAR
CONSTRUCTION OF 8 UNIT TOILET AND 4 UNIT BATHROOM AT SCHEDULED TRIBE RESIDENTIAL BOY HIGH SCHOOL, GARU IN THE DISTRICT OF LATEHAR
2026_LNREP_110234_1
NREP/LATEHAR/49/2025-26
Open Tender
Civil Works - Buildings
Percentage
60 days
GARU
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹41,000
3 Apr 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 38.63 | M3 | 167.33 | ₹6,463.96 |
| 2 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 14.15 | M3 | 55.28 | ₹782.21 |
| 3 | Filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 10.94 | M3 | 128.88 | ₹1,409.95 |
| 4 | Providing coarse clean sand in filling infoundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thk with all leads and lift including cost of all material labour royalty and taxes all complete as per building specification and direction of E/I (mode of measurement compacted volume) | 9.17 | M3 | 589.51 | ₹5,405.81 |
| 5 | Providing disignation 75B one brick flat soling joints filled with local sand including cost watering taxes and royalty all complete as per building specification and direction of E/I. | 80.73 | sqm | 330.34 | ₹26,668.35 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 11.89 | M3 | 4,961.73 | ₹58,994.97 |
| 7 | Providing and laying in position specified grade of reinfoced cement concrete,excluding the cost of centering shuttering ,finishing and reinforcement-All work up to plinth ,level Fondition ,1:1.5:3 (1 Cement :1.5 coarse sand (Zone -III):3 graded stone aggregate 20mm nominal | 6.58 | M3 | 5,218 | ₹34,334.44 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 12.61 | sqm | 194.5 | ₹2,452.65 |
| 9 | Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttresses, plinth and string course, fillets, columns pillars pier abutment posts and struts etc above plinth level up to floor five level excluding cost of centering, shuttering finishing and reinforcement | 1.37 | M3 | 6,082.45 | ₹8,332.96 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts | 18.51 | m2 | 465.38 | ₹8,614.18 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
Group_49.pdf
Tender Documents • 0.25 MB
BOQ_149028.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .