Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹12.3 L+₹2.4 L (24.1%)Rejected-Finance | ₹12.3 L+₹2.4 L (24.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹13.8 L+₹3.9 L (39.2%)Rejected-Finance | ₹13.8 L+₹3.9 L (39.2%) | L3 | Rejected-Finance L3 |
| 4 | L4₹14.8 L+₹4.9 L (50.0%)Rejected-Finance NOT SPECIFIED | ₹14.8 L+₹4.9 L (50.0%) | L4 | Rejected-Finance L4 |
| 5 | L5₹15.1 L+₹5.2 L (52.4%)Rejected-Finance | ₹15.1 L+₹5.2 L (52.4%) | L5 | Rejected-Finance L5 |
Tender Value
₹16 L
EMD Value
₹32,000
Closing Date
13 Jun 2026, 5:00 pmClosed
Executive Engineer PMGSY Division Jammu
Executive Engineer PMGSY Division Jammu
Permanent Restoration of Link Road from Punni Di Hatti to Gangwoon via Sujatpur Pupa road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-04, Block Marh, District Jammu
2026_JKRRD_148186_1
e-NIT No. EE/PMGSY/J/16 of 2026-27 Dated. 05.06.2026
Open Tender
Civil Works - Roads
Percentage
30 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
₹32,000
Executive Engineer PMGSY Division Jammu
23 Jul 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
13 Jun 2026
6 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:2.9.1 All kinds of soil : | 215 | Cum | 256.85 | ₹55,222.75 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 30 | Cum | 4,826.5 | ₹1,44,795 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 150 | Cum | 5,733.6 | ₹8,60,040 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.2 | Cum | 9,821.85 | ₹70,717.32 |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 7.5 | Cum | 8,422.45 | ₹63,168.38 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 720 | kg | 123.2 | ₹88,704 |
| 7 | Providing and laying river bed materials on road surface including watering and compaction with power road roller under optimum mositure condition to give at least dry density including all carriage lead lift loading handling rehanding complete. | 109.83 | Cum | 550 | ₹60,406.5 |
| 8Centering and shuttering including strutting, propping etc. and removal of form work for | |||||
| 8.01 | Foundations, footings, bases for columns | 556 | Sqm | 286.35 | ₹1,59,210.6 |
| 8.02 | walls (any thickness) including attached pilasters,buttresses, plinth and string courses | 18 | Sqm | 628.95 | ₹11,321.1 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_231797.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .