Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.4 LAccepted-AOC | L1 | Accepted-AOC TENDER FOUND LOWEST, HENCE TENDER ACCEPTED | |
| 2 | L2₹48.0 L+₹1.8 L (3.88%)Rejected-AOC 1 16 70 SAI NAGAR COLONY ALWAL SECUNDERABAD 500 015 | SECUNDERABAD | HYDERABAD | TELANGANA | 500015 | L2 | Rejected-AOC NOT LOWEST | |
| 3 | L2₹48.0 L+₹1.8 L (3.88%)Rejected-AOC | L2 | Rejected-AOC NOT LOWEST | |
| 4 | L4₹48.8 L+₹2.6 L (5.61%)Rejected-AOC | L4 | Rejected-AOC NOT LOWEST | |
| 5 | L4₹49.1 L+₹2.9 L (6.27%)Rejected-AOC NO 98 1 1C YOJANANAGAR LOHEGAON WAGOLI ROAD NEAR SIVBHA DARBAR HOTEL LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | L4 | Rejected-AOC NOT LOWEST |
| Sl No | Description | Qty | Unit | ATUL ENTERPRISES L2 | S.R.M.K Enterprises L4 | abhilasha constructions L9 | NARAYANA CONSTRUCTIONS L1 | M/S DIVIJA BUILDERS L3 | SAI RUPA CONSTRUCTIONS L6 | G RANGA RAO L5 | GADUSU RAMESH CONTRACTOR L7 | BEEGEE DESIGN SYSTEMS L2 | GUTHIKONDA BROTHERS L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for preparation of old surfaces of walls and applying one coat of white wash including filling of cracks with approved crack filler complete all as specified and directed. Note : white wash shall be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | 3,000 | Sqm | 12 ₹36,000 Lowest | 50 ₹1,50,000 | 12 ₹36,000 Lowest | 12 ₹36,000 Lowest | 14 ₹42,000 | 15 ₹45,000 | 40 ₹1,20,000 | 40 ₹1,20,000 | 12 ₹36,000 Lowest | 12 ₹36,000 Lowest |
| 2.00 | M&L for preparation of old surfaces of walls and applying one coat of colour wash, including filling of cracks with approved crack filler complete all as specified and directed . Note : colour wash shall be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | 3,000 | Sqm | 15 ₹45,000 | 50 ₹1,50,000 | 14 ₹42,000 | 13 ₹39,000 | 14.5 ₹43,500 | 15 ₹45,000 | 50 ₹1,50,000 | 35 ₹1,05,000 | 15 ₹45,000 | 12 ₹36,000 Lowest |
| 3.00 | M&L for preparation of old surfaces of ceilings and applying one coat of white wash, including filling of cracks with approved crack filler complete all as specified and directed .Note : white wash shall be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | 2,000 | Sqm | 14 ₹28,000 | 50 ₹1,00,000 | 14 ₹28,000 | 14 ₹28,000 | 14.5 ₹29,000 | 15 ₹30,000 | 50 ₹1,00,000 | 40 ₹80,000 | 14 ₹28,000 | 12 ₹24,000 Lowest |
| 4.00 | M&L for Preparation of old plastered or unplastered or distempered surfaces of walls including filling of cracks with approved crack filler and applying one coat of oil bound distemper white or coloured complete all as specified and directed.Note : Oil bound distemper shall be done by roller/spray only, after complete removal of old loose flakes.Complete all as specified and directed. | 10,000 | Sqm | 36 ₹3,60,000 | 80 ₹8,00,000 | 50 ₹5,00,000 | 33 ₹3,30,000 Lowest | 37 ₹3,70,000 | 33 ₹3,30,000 Lowest | 50 ₹5,00,000 | 65 ₹6,50,000 | 36 ₹3,60,000 | 40 ₹4,00,000 |
| 5.00 | M&L for Preparation of plastered or unplastered old surfaces of ceiling and applying one coat of oil bound distemper including filling of cracks with approved crack fillercomplete all as specified and directed.Note: Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | 1,000 | Sqm | 36 ₹36,000 | 40 ₹40,000 | 52 ₹52,000 | 36 ₹36,000 | 36.5 ₹36,500 | 33 ₹33,000 Lowest | 60 ₹60,000 | 60 ₹60,000 | 36 ₹36,000 | 40 ₹40,000 |
| 6.00 | M&L for complete removal of existing treatment on wall surfaces and applying two coats of oil bound distemper over a coat of alkali resistant primer over one coat of 1 mm thick wall care putty complete all as specified and directed. Note : Oil bound distemper shall be done by roller only, after complete removal of old loose flakes and Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.complete all as specified and directed. | 5,000 | Sqm | 200 ₹10,00,000 | 100 ₹5,00,000 | 125 ₹6,25,000 | 198 ₹9,90,000 | 222 ₹11,10,000 | 200 ₹10,00,000 | 150 ₹7,50,000 | 97 ₹4,85,000 Lowest | 200 ₹10,00,000 | 190 ₹9,50,000 |
| 7.00 | M&L for preparation of old surfaces of walls and applying one coat of cement based paint including external scaffolding work including filling of cracks with approved crack fillercomplete all as specified and directed. Note : cement based paint shall be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | 13,500 | Sqm | 50 ₹6,75,000 | 40 ₹5,40,000 Lowest | 40 ₹5,40,000 Lowest | 45 ₹6,07,500 | 58 ₹7,83,000 | 55 ₹7,42,500 | 40 ₹5,40,000 Lowest | 70 ₹9,45,000 | 50 ₹6,75,000 | 40 ₹5,40,000 Lowest |
| 8.00 | M&L for complete removal of existing treatment and preparation of surfaces of walls and applying two coats of cement based paint over a coat of cement primer complete all as specified and directed. Note : cement based paint shall be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | 2,000 | Sqm | 75 ₹1,50,000 | 100 ₹2,00,000 | 85 ₹1,70,000 | 72 ₹1,44,000 | 79 ₹1,58,000 | 90 ₹1,80,000 | 50 ₹1,00,000 Lowest | 90 ₹1,80,000 | 75 ₹1,50,000 | 50 ₹1,00,000 Lowest |
| 9.00 | M&L for preparation of old painted steel surfaces exc. 10cm in width and girth and applying one coat of synthetic enamel paint,complete all as specified and directed. Note: Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | 1,800 | Sqm | 50 ₹90,000 | 50 ₹90,000 | 48 ₹86,400 | 45 ₹81,000 Lowest | 55.6 ₹1,00,080 | 60 ₹1,08,000 | 60 ₹1,08,000 | 60 ₹1,08,000 | 50 ₹90,000 | 55 ₹99,000 |
| 10.00 | M&L for Preparation of old painted wooden surfaces of any description, not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. | 2,500 | Sqm | 50 ₹1,25,000 | 50 ₹1,25,000 | 48 ₹1,20,000 | 45 ₹1,12,500 Lowest | 56.12 ₹1,40,300 | 60 ₹1,50,000 | 60 ₹1,50,000 | 65 ₹1,62,500 | 50 ₹1,25,000 | 55 ₹1,37,500 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
12 May 2026, 6:00 pmClosed
RAMESH CHANDRA MEENA
GARRISON ENGINEER (SOUTH), MUDFORT, SECUNDERABAD PIN - 500003
WELCOME MAINTENANCE TO OFFICERS MD ACCNS AND PERIODICAL SERVICES TO OTM AND MD ACCN AT AOC CENTRE UNDER AGE B/R (SOUTH) NO.II OF GE (SOUTH) SECUNDERABAD
2026_MES_761361_1
GE(S)/SEC/TOKEN-16 OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE SOUTH, MUDFORT, SECUNDERABAD
For Enlisted contractors class D and above category a (i) and for unenlisted contractors meeting the eligibility criteria of above class and category for along eligible class with EMD
6 documents required · 6 mandatory
₹500
GARRISON ENGINEER (SOUTH), MUDFORT, SECUNDERABAD
₹98,000
Yes
20 Jul 2026
22 Apr 2026
14 May 2026
22 Apr 2026
12 May 2026
7 May 2026
22 Apr 2026 - 6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for preparation of old surfaces of walls and applying one coat of white wash including filling of cracks with approved crack filler complete all as specified and directed. Note : white wash shall be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | - | Sqm | - | - |
| 2 | M&L for preparation of old surfaces of walls and applying one coat of colour wash, including filling of cracks with approved crack filler complete all as specified and directed . Note : colour wash shall be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | - | Sqm | - | - |
| 3 | M&L for preparation of old surfaces of ceilings and applying one coat of white wash, including filling of cracks with approved crack filler complete all as specified and directed .Note : white wash shall be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | - | Sqm | - | - |
| 4 | M&L for Preparation of old plastered or unplastered or distempered surfaces of walls including filling of cracks with approved crack filler and applying one coat of oil bound distemper white or coloured complete all as specified and directed.Note : Oil bound distemper shall be done by roller/spray only, after complete removal of old loose flakes.Complete all as specified and directed. | - | Sqm | - | - |
| 5 | M&L for Preparation of plastered or unplastered old surfaces of ceiling and applying one coat of oil bound distemper including filling of cracks with approved crack fillercomplete all as specified and directed.Note: Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | - | Sqm | - | - |
| 6 | M&L for complete removal of existing treatment on wall surfaces and applying two coats of oil bound distemper over a coat of alkali resistant primer over one coat of 1 mm thick wall care putty complete all as specified and directed. Note : Oil bound distemper shall be done by roller only, after complete removal of old loose flakes and Wall, Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.complete all as specified and directed. | - | Sqm | - | - |
| 7 | M&L for preparation of old surfaces of walls and applying one coat of cement based paint including external scaffolding work including filling of cracks with approved crack fillercomplete all as specified and directed. Note : cement based paint shall be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | - | Sqm | - | - |
| 8 | M&L for complete removal of existing treatment and preparation of surfaces of walls and applying two coats of cement based paint over a coat of cement primer complete all as specified and directed. Note : cement based paint shall be done by roller only, after complete removal of old loose flakes and wall, roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | - | Sqm | - | - |
| 9 | M&L for preparation of old painted steel surfaces exc. 10cm in width and girth and applying one coat of synthetic enamel paint,complete all as specified and directed. Note: Roof hight portion upto ht 7.50m incl necessary scaffolding to be provided.Complete all as specified and directed. | - | Sqm | - | - |
| 10 | M&L for Preparation of old painted wooden surfaces of any description, not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. | - | Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
8938tenderdocuments.pdf
Tender Documents • 2.89 MB
BOQ_852847.xls
BOQ • 0.32 MB
8938AMEDMENTTOCRITICALDATE02.pdf
PDF • 0.04 MB
8938Amedmenttocriticaldate.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .