Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
12 May 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRACK 1
14 conditions · 2 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Non submission of the documents shall lead to summarily rejection of the offer.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract.
Defination of Similar Work :- FBW work or any other P.way work
14 conditions · 2 needing a document upload
Tenderers are instructed to kindly peruse the contents of attached document "Special conditions of letter of credit as mode of Payment" before exercising the option of payment through letter of credit as mode of payment.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per Advance Correction Slip No. 5 dated 20.10.2023 "The Original Bank Guarantee should be delivered in person in this office (i.e in Receive and Dispatch Section of DRM office, Engineering Branch, West Central Railway, Jabalpur) before closing date for submission of bids (i.e. excluding the last date of submission of bids).
Indian Railways Standard General Conditions of Contract, April 2022 (IRGCC, April 2022) with correction slips issued up to dateof inviting tender will be applicable for this tender.
Mobile flash welding - 1533 joints in ET-JBP section under Senior Divisional (South) Jabalpur Jurisdiction.
DRMW-JBP-58-2026
DRMW-JBP-58-2026
Open
Works - General
12 Months
Jabalpur, Madhya Pradesh
₹0
₹3.6 L
12 May 2026
16 Apr 2026
28 Apr 2026
3 items across 1 schedule · ₹2,09,30,336.7 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Flash butt welding of 60/52kg rails using cum road mobile and / or stationary flash butt welding plant as per following details: (a) case of welding by stationary flash butt welding plant: The rate quoted, should include renewal of existing rail by panel rails initially for a length of about 250 track-m, cutting of released rails the joints so as to remove heat affected zone/fish bolt holes, loading, unloading, transportation to flash butt welding plant, flash welding of rails, transportation of panel rails the site and replacement of the existing running rail with panels so welded including insertion closer rails with fittings. AT welding of joints panels with approved portions, 3 piece moulds, etc. complete in all respect. In case railway wagons / UTV machines are required transportation of released rails/welded panels, the hire charges for the same as per railway rates has to be borne by the contractor. Charges for establishig stationary flash butt welding plant at nominated place including gantry, hoist, portal crane, etc.have to be borne by contractor and no extra payment shall be made on this account. However, railway land available will be temporarily handed over free cost for the execution of the work OR" "(b) case of welding by mobile flash butt welding plant in situ or on cess, the rate quoted should include earth work in formation with contractor's own earth including dressing slopes of embankment, leading cut spoils to location/ locations as directed by the engineer for stabling & working of the mobile flash butt welding plant, cutting of existing rails at joints so as to remove heat affected zone /fish bolt holes under traffic block, flash butt welding of rails including insertion of closer rails with fittings for movement of trains under traffic block etc.complete in all respect. (c) In both cases, as above, the rate quoted should also include pre-straightening of rails, matching ends, preparation for aligning, positioning, stripping of rail joints, grinding and finishing joints, USFD testing of flash butt/AT welded joints, segregating defective rails, post straightening of joints handling/leading rails/rail panels, removing and re-fixing fittings/fastening with contractor's own labour machinery, tools, plants, etc. with all lead, decent, crossing tracks. royalty, taxes etc. complete in all respect as per direction engineer. The cut rails shall have to be returned to PWI's depot by the contractor at his own cost. The contractor at his own cost has to establish quality control organisation to ensure adequate control at all stages." (d) Unless otherwise superseded by the stipulation of this contract, the welding process and methodology will governed by the "manual for Flash Butt Welding of Rails (revised 2022)" with up to date correction slips issued by Research Design and Standards Organisation (RDSO), Ministry Railways, Lucknow | rail Numbers In at to of of for the as of In of a the the rail of of of lift, of be of | 1533.00 | 12,825.24 | 1,96,61,092.92 |
| 2 | Distressing of existing BG LWR track for flash butt welded portions as per latest PCE's circular between tm to tm +50C under traffic block, including cutting of rails near SEJs or every kilometer, inserting suitable cut closure rails so as to pass traffic after block including providing 1 meter long fish plate with four clamps and fixing the SEJ in mean position, welding of cut made during distressing by weld, replacement of 100% GRPs and worn out unserviceable ERCs and liners, etc.with contractor's own labour, materials, machinery, tools, plants, with all lead , lifts, descents, etc. complete in all respect as per direction of engineer. | the Metre at AT / the | 9234.00 | 36.95 | 3,41,196.3 |
| 3 | Painting of rail foot ( after thoroughly cleaning of existing rail surface with wire brush) with one coat of red oxide zinc chromate paint (primer) and a finishing coat of synthetic enamel paint with contractor's own labour, materials, tools, plants, complete in all respect as per direction of Engineer. | Sqm | 7757.00 | 119.64 | 9,28,047.48 |
| Schedule total | ₹2,09,30,336.7 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CorrectionSlip11toIRGCC2_11zon.pdf
ATTACHMENT
Tenderdocuement.pdf
ATTACHMENT
splconditions2_rotated.pdf
ATTACHMENT
ACS8to10ofIRGCCApril2022.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
TRACK-CONDITIONS.pdf
ATTACHMENT
Specialconditonsofletterofcreditasmodeofpayment.pdf Letter of credit
ATTACHMENT
Specialconditonsofletterofcreditasmodeofpayment.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .