Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAdmitted-Finance | ₹14.8 L | L1 | Admitted-Finance |
| 2 | L2₹14.9 L+₹12,395.17 (0.84%)Admitted-Finance | ₹14.9 L+₹12,395.17 (0.84%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | The Technology Hub L2 | T.K Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of Basketball Court (91.86 feet x 49.2 feet) at Government Girls Higher Secondary School Kishtwar by way of Providing, Laying and Fixing of NBA approved basketball matting with approved color coding and pre line marking. The job includes fixing of the portable basket ball poles with fibre glass board and basket ball ring and net - 02 No as per NBA approved color and basket ball – 02 No along with. The job includes cost of material, tools and tackles, skilled labour, carriage, transportation, and all taxes as applicable. The job includes cost of material, tools and tackles, skilled labour, carriage, transportation, and all taxes as applicable. Complete Job | 1 | job | 9,57,000 ₹9,57,000 | 8,92,000 ₹8,92,000 Lowest |
| 2.00 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5mtr in width as well as 10 sq on plain including disposal of excavated earth lead up to 50 mtr and lift up to 1.5M.
3 x 2 x 2 = 12 for 22 Columns
i.e. 264 x 0.0283 = 7.47 M3 | 7.47 | m3 | 1,153 ₹8,612.91 | 1,015 ₹7,582.05 Lowest |
| 3.00 | Filling available excavate earth in trenches, plinth, sides of foundations etc in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 50 M and lift upto 1.5 M.
92.86 49.2 02
9137.42 x 0.0283 = 258.58M3 | 258.58 | m3 | 105 ₹27,150.9 Lowest | 226 ₹58,439.08 |
| 4.00 | Providing & Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level with 1:2:4 having stone aggregate size of 20 mm nominal size with neat and even surface.
Plinth Area = 284.12 x 2’6” x 1
710.31 x 0.0283 = 20.10 M3
Floor Area = 92.86 x 49.2 x 0.5 = 2284.35
2284.35 x 0.0283 = 64.63 M3
Total PCC Area = 64.63 + 20.10 = 84.73 M3 | 84.73 | m3 | 2,783 ₹2,35,803.59 Lowest | 3,100 ₹2,62,663 |
| 5.00 | Cement plaster 1:3 finished with a floating coat of near cement 12 mm cement plaster
94.86 51.2 (including Plinth)
4856.83x 0.0929 = 451.19 M2 | 451.19 | m2 | 580 ₹2,61,690.2 | 570 ₹2,57,178.3 Lowest |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
3 Nov 2025, 12:00 pmClosed
EXECUTIVEV ENGINEER M AND H DIVISION DODA
khellani doda
CONSTRUCTION OF BASKET BALL COURT AT HSS Girls KISHTWAR
2025_PWDJK_292583_1
MHDD/TS/2025-26/63
Open Tender
Machineries/ Mechanical Engg Items
Turn-key
30 days
HSS Kishtwar
AAS PER SBD
2 documents required · 2 mandatory
₹200
EXECUTIVEV ENGINEER M AND H DIVISION DODA
₹30,000
12 Nov 2025
18 Oct 2025
3 Nov 2025
18 Oct 2025
3 Nov 2025
18 Oct 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_944176.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .