| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC | ₹6.5 L | L1 | Accepted-AOC Lowest BID |
| 2 | L2₹6.6 LRejected-Finance | ₹6.6 L | L2 | Rejected-Finance Highest BID |
| 3 | L2₹6.6 LRejected-Finance | ₹6.6 L | L2 | Rejected-Finance Highest BID |
Tender Value
Refer Docs
EMD Value
₹32,500
Closing Date
23 Mar 2026, 5:00 pmClosed
EO NPP Hata
EO NPP Hata
Construction Of RCC Drain And Slab Hanuman mandir To NH 28
2026_DOLBU_1122759_1
700-3
Open Tender
Civil Works
90 days
ward no 18 Hanuman nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹650
EO NPP Hata
₹32,500
10 Apr 2026
9 Mar 2026
24 Mar 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
Excavation in foundation in ordinary soil (loam clau or sand) including lift upto 1.50 m & lead up to 30 m including filling watering and ramming of excavated earth into the trenches or into space between the building and sides of foundation treanch or in to the plinth removal & disposal of surpluse earth as directed by the engineer in charge up to distance of 30 m from the foundation trenches ( excluding royalty) si 251
Cement concrete with 4 cm. (1X") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of all materials, labour and T&P etc. required for proper completion of the work.S.N. 281
R.C.C.slab work with cement and approved coarse sand & 2 cm gauge approved stone ballast in the proportion of 1:1.5:43excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G.gi binding wire and including necessary cenering & suttering etc.and also including supply of all material including work complete in all respect as per 284
Mild steel or iron in plain work such as in reinforced concrete or reinforce brick work (when not include over all rates) wrought to reruired shape as necessary including bending for poper completion of work and including supply of steel its wastage bend hooks and authorized over lapping shall be measured. as per Is 504.
R.C.C.slab work with cement and approved coarse sand & 2 cm gauge approved stone ballast in the proportion of 1:1.5:43excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G.gi binding wire and including necessary cenering & suttering etc.and also including supply of all material including work complete in all respect as per 284
Mild steel or iron in plain work such as in reinforced concrete or reinforce brick work (when not include over all rates) wrought to reruired shape as necessary including bending for poper completion of work and including supply of steel its wastage bend hooks and authorized over lapping shall be measured. as per Is 504
Site clearence, barricating & Material shifting
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_2091071.pdf
techsummary_2091071.pdf
finance_2091071.pdf
finsummary_2091071.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
V3_BOQ_Percentage_Template.xls
Tender Documents • 0.32 MB
Download all tender documents and submit your bid