Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.4 L
Closing Date
19 Oct 2021, 6:55 pmClosed
Xen REW Poonch
Xen REW Poonch
please refer to boq
2021_RDPR_140917_6
e-NIT No.100 of REW POONCH, Dated 23-09-2021
Open Tender
Civil Works
Item Rate
40 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Xen REW Poonch
Exempted
25 Oct 2021
23 Sept 2021
20 Oct 2021
23 Sept 2021
19 Oct 2021
23 Sept 2021
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge forAll kinds of soil :
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) With P/L hand packed stone (plum) 30%, for cement concrete, excluding carriage.
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curingbut excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar
Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand)
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete
15mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade for Two or more coats on new work
Carriage of sand bagri for 10 km by MT
Carriage of stone for 10 km by MT
Carriage of cement for 5 km by MT
Carriage of T Steel for 28 km by MT and 2 km by HL
Providing and fixing Structural steels of sorts, i.e Flats, Angles, round , square bars, cutting, hoisting and fixing in position with welding charges complete, including applying priming coat of approved steel primer, design as directed, by engineer in charge. (Gate Work).
Installation / Construction of Sign Board (C.I.B) Showing details of project of required specifications, as directed by Engineer Incharge at Site.
MS Ajaz Ahmed Contractor
Wahid Iqbal Contractor
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .