| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.2 LAccepted-Finance | 1 | Accepted-Finance Lowest |
Tender Value
₹28.7 L
EMD Value
₹57,372
Closing Date
6 Mar 2023, 12:00 pmClosed
Executive Engineer
Office of the Executive Engineer CD APWD Campbell Bay
Construction of Retaining Wall cum Drain at Macachua in GNI under CD, APWD, Campbell Bay
2023_APWD_9595_1
NIT No. 61/EE/CD/CB/2022-23
Open Tender
Civil Works - Buildings
Works
180 days
Construction Division APWD Campbell Bay
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹57,372
Yes
19 Dec 2023
2 Mar 2023
7 Mar 2023
2 Mar 2023
6 Mar 2023
2 Mar 2023
2 Mar 2023 - 4 Mar 2023
Amount
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources).
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :
1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand)
Providing and fixing weep hole at 1.0 mtr. interval on both direction (horizontal and vertical) in stagerred way or as per the direction of Engineer-in-charge). a) 50mm dia PVC pipe.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .