Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹3,500
Closing Date
23 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPMENT OFFICER VP KURUVIKULAM
BLOCK DEVELOPMENT OFFICE KURUVIKULAM
AGAMT 2022-2023 TENKASI DISTRICT KURUVIKULAM BLOCK CONSTRUCTION OF CC DRAINAGE AT 1ST WARD STREET IN ATHIPATTI VILLAGE AND PANCHAYAT
2022_RDTN_273352_7
B3/319/2022
Open Tender
Civil Works
Works
90 days
KURUVIKULAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,500
BLOCK DEVELOPMENT OFFICER VP KURUVIKULAM
₹3,500
Yes
23 Dec 2022
17 Dec 2022
23 Dec 2022
17 Dec 2022
23 Dec 2022
17 Dec 2022
Amount
Earthwork excavation in all classes of Soils and Subsoils except hard rock requiring blasting for laying of Pipes with the standard trench width as per Standard specifications - TWAD board specifications from Source to Storage tank
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete
Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Concrete masonry - Abutment & Body walls.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Plastering with Cement Morter 1:5 mix, 12mm thick Smooth finish for Brick, RR masonry surface and other Concrete surfaces inculding cost and conveyance of all materials to site and all other labour charges, incidental charges etc., complete
Providing Vertical Filter Soak Pit Arrangements at Drain disposal end Point
Earthwork excavation in all classes of Soils and Subsoils except hard rock requiring blasting for laying of Pipes with the standard trench width as per Standard specifications - TWAD board specifications from Source to Storage tank
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete _ Base Concrete
Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc ,complete
Plastering with Cement Morter 1:5 mix, 12mm thick Smooth finish for Brick, RR masonry surface and other Concrete surfaces inculding cost and conveyance of all materials to site and all other labour charges, incidental charges etc., complete
Supply and filling of following materials for Filter zone including cost and conveyance of all materials to site, labour charges for filling and filtering arrangements and other incidental charges etc., complete
50 - 100mm metal
40mm metal
20mm metal
Sand Filling
Brick Jelly
Gravel
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MR.GOMATHI SANKAR, CONTRACTOR
MR.G.MADASAMY
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .