Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹89.7 LAccepted-AOC NA | PALWAL | HARYANA | 121004 | ₹89.7 L Quoted ₹92.3 L | 1 | Accepted-AOC L1 |
| 2 | 2₹97.6 L+₹5.2 L (5.67%)Rejected-Finance H NO 1088A VIVEKANAND COLONY MANDI DABWALI MANDI DABWALI 125104 | MANDI DABWALI | SIRSA | HARYANA | 125104 | ₹97.6 L+₹5.2 L (5.67%) | 2 | Rejected-Finance L2 |
| 3 | Rejected-Technical SHIVAM COMPLEX RATIA ROAD TOHANA 125120 | FATEHABAD | HARYANA | 125120 | - | - | Rejected-Technical Technically Disqualified |
| Sl No | Description | Qty | Unit | THE TOHANA NEW VIKAS COOP LANDC SOCIETY L1 | PARVEEN KUMAR (CONTRACTOR) L2 |
|---|---|---|---|---|---|
| 1.10 | Miscellaneous work and other allied civil works i.e. Costruction of Ramp work, Brick toe wall and M.S. Work in the S/stn area i/c cost of all material, labour men and machinery complete in all respects as per directions of the Engineer Incharge. (The payment shall be made on actual work Basis) | 2 | job | 2,20,000 ₹4,40,000 Lowest | 3,25,000 ₹6,50,000 |
| 1.20 | RECOVERY OF BRICK BATS | 176.67 | cum | 100 ₹-17,667 Lowest | 100 ₹-17,667 Lowest |
| 1.30 | RECOVERY OF OLD USEABLE BRICKS | 87,275 | Nos. | 1.5 ₹-1,30,912.5 Lowest | 1.5 ₹-1,30,912.5 Lowest |
| 1.40 | Recovery of Steel Scrap : Chatter | 519 | Kg. | 30 ₹-15,570 | 18 ₹-9,342 Lowest |
Tender Value
₹84.4 L
EMD Value
₹1.7 L
Closing Date
1 Jun 2026, 11:00 amClosed
SUDEEP
XEN/Civil Work, Hisar
Re-Construction of boundary wall and other allied civil works to prevent the 33 kV S/Stn. Gullarwala (Fatehebad) form flood water
2026_HBC_523287_1
20262903012A 94AB 4D59 9D6D 2AEB828623881035DHB
Open Tender
Civil Works
Works
90 days
GULLARWALA
As per CBD
2 documents required · 2 mandatory
₹4,900
₹1.7 L
Yes
24 Jul 2026
21 May 2026
2 Jun 2026
21 May 2026
1 Jun 2026
21 May 2026
21 May 2026 - 1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Miscellaneous work and other allied civil works i.e. Costruction of Ramp work, Brick toe wall and M.S. Work in the S/stn area i/c cost of all material, labour men and machinery complete in all respects as per directions of the Engineer Incharge. (The payment shall be made on actual work Basis) | 2 | job | - | - |
| 1.2 | RECOVERY OF BRICK BATS | 176.67 | cum | - | - |
| 1.3 | RECOVERY OF OLD USEABLE BRICKS | 87,275 | Nos. | - | - |
| 1.4 | Recovery of Steel Scrap : Chatter | 519 | Kg. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_602220.xls
BOQ • 0.28 MB
NIT29CORR.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .